Search Documents

Sort by

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • CIM
    Construction of a Geometallurgical Model, How it should Interact with the Plant Model and the Importance of Final Reconciliation

    By Orlando Rojas, Javier Pizarro, Romke Kuyvenhoven, Francisco Soto

    "The concept of geometallurgy has been extensively mentioned and used in the mining industry in the past years. However, each mining firm has a different understanding of what geometallurgy means, and

    Jan 1, 2016

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • DFI
    Construction Of A Spillwall In The Columbia River

    By Francis B. Gularte

    The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw

    Jan 1, 2010

  • SME
    Construction Of A TBM Launch Box In A Complex Urban Environment

    By Vincent Tirolo

    The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F

    Jan 1, 2013

  • DFI
    Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall

    By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney

    "Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly

    Jan 1, 2017

  • SME
    Construction Of A Watertight Deep Shaft In The Unstable And Water-Bearing Strata Of The Saskatchewan Potash Field

    By Erwin K. Roesner

    The difficulties encountered while sinking deep shafts for Potash Mines in southern Saskatchewan have been the subject of several papers in the past. Geological and hydrological conditions of the stra

    Jan 1, 1980

  • AUSIMM
    Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

    By N Wharmby

    In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh

    Mar 8, 2011

  • SME
    Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021

    By Mirko Martini, Marcelo Benaglia, Andrea Codalli

    Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its

    Jun 13, 2021

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Construction of an Underpass Crossing in Proximity of a Railway Track

    By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi

    "1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is

    Jan 1, 2016

  • TMS
    Construction of Combustion Synthesis Stability Diagrams for Ceramic Metal-Matrix Composites

    By John J. Moore

    This paper discusses the application of a video technique to construct stability diagrams for the combustion synthesis of ceramic-metal composites. Several model exothermic combustion synthesis reacti

    Jan 1, 1993

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • SME
    Construction Of Explosion Resistant Seals

    By C. R. Stephan

    Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations

    Jan 1, 1997

  • SME
    Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft Rock

    By Yukika Miyashita, Takahiro Inoue, Kenji Namikawa, Masashi Matsumoto, Junichi Koseki, Yoshihiro Terashima

    "In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-an

    Jan 1, 2016

  • ISEE
    Construction of Free Faces in a Single Event

    By Iván E, Alex Araya Jofre, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, it is important for companies to have controlled mining operations and adhere to production schedules. To achieve this, one of the key factors is maintaining high reliability in the P&T pro

    Jan 26, 2026

  • CIM
    Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., Limited

    By K. V. Lindell

    Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of

    Jan 1, 1948