Search Documents

Sort by

  • SME
    Constraints and Consequences in 3-Dimensional CFD Modeling of Open-Pit Mines

    By K. V. Raj, T. Bhowmick

    "Computational fluid dynamics (CFD) modeling of an open-pit mine has several challenges. A good quality mesh of the model domain is a pre-requisite for convergence in solution. Good quality tetrahedra

    Jan 1, 2015

  • SME
    Constraints On The Availability Of Coal For Mining In Illinois

    By C. G. Treworgy

    Geologists at the Illinois State Geological Survey are evaluating geologic and land use conditions that affect the minability of coal to determine how much coal is available for development using curr

    Jan 1, 1995

  • CIM
    Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” Rocks

    By D. J. Scarpato

    "Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t

    Jan 1, 2015

  • ISEE
    Constructing Laboratory Caverns in Hard Rock Under High Stress

    By Christopher Laughton

    A new underground laboratory is under construction at the recently closed Homestake Gold Mine, Lead South Dakota, United States of America. The Deep Underground Science and Engineering Laboratory is d

    Jan 1, 2011

  • SME
    Constructing Wetlands For Treatment Of Mine Water

    By M. A. Girts

    Wetlands can be constructed inexpensively on mined lands to treat small flows of acid mine water. Metals are removed from the water by the wetland vegetation and indigenous bacteria. Full-scale field

    Jan 1, 1986

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • AIME
    Construction

    By T. A. Rickard

    The writing that is effective is woven with a fine texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it

    Jan 1, 1931

  • SME
    Construction - Uses Insulation

    By Steven J. Stokowski, Frederick M. Bodycomb

    This chapter deals with the use of industrial minerals in insulating materials used to control our thermal and acoustical environment. There are numerous products on the market used for thermal and ac

    Jan 1, 1994

  • SME
    Construction And Investigation Of A Clay Heap Leach Pad ? Introduction

    By Dirk van Zyl

    Natural materials can be used successfully in the construction of heap leach pads. The use of these materials usually result in the least expensive approach for such facilities. Sufficient geotechnica

    Jan 1, 1983

  • AUSIMM
    Construction and Maintenance of Underground Mine Roads

    By Seedsman R. W

    Good roads are essential in moving men and materials to and from the underground workplace. Coffey Partners International Pty Ltd (Coffey) has recently completed a underground coal industry funded p

    Jan 1, 1995

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • SME
    Construction And Operation Of A Series Of Biological Leaching Tests Dumps

    By A. Bruynesteyn

    Many papers 'have been publihed on the role of the bacterium.Thiobacillus ferrooxidans in the oxidation of reduced sulfur compounds, and years of research have established the following environme

    Jan 1, 1972

  • NIOSH
    Construction And Preliminary Evaluation Of A Die El Exhaust Particulate Filter For Underground Use

    By Robert W. Freedman

    In the Bureau of Mines study, a filter with a 20-by 20-inch-square cross section was inserted into the exhaust ducting of a 4-stroke-cycle, 90-hp diesel engine, and the efficiency of removal of total

    Jan 1, 1979

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • NIOSH
    Construction And Testing Of A Junk Auto Incinerator

    By C. J. Chindgren

    A refractory-lined, garage-type automobile incinerator with a natural gas afterburner for air pollution control was cooperatively constructed and tested by the Bureau of Mines and the Wasatch Metal &

    Jan 1, 1970

  • CIM
    Construction and Utilization of a Field Data Sheet for Consideration of Rock Engineering Problems in Underground Hard Rock Mining.

    By Radford B. Langston

    Mining Methods Majority of Production Ramp and Fill at Stillwater, Sub-level Becoming More Important Production at East Boulder from Sub-level l Majority JM REEF ROCK TYPES NORITE - plagioclase

    May 1, 2002

  • SME
    Construction Challenges of the Anderson Dam Tunnel Project - NAT2022

    By Ron Drake

    The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An

    Dec 1, 2022

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997