Search Documents

Sort by

  • TMS
    Defect Formation And Mechanism Of ZA Alloy Made In Continuous Casting By Heated Mold (dfb97a6f-5441-4d04-a177-969ef90fc109)

    By Ma Ying

    The continuous directional solidification technique of five kinds of special ZA alloys with eutectic, peritectic and eutectoid transfonnation under the condition of continuous casting by heated mold w

    Jan 1, 2003

  • ABM
    Defects Characterization Of Chromium Carbide Overlay’s Deposited By Submerged Arc Welding

    By Márcio Corrêa de Carvalho

    Welded deposited chromium carbide overlay’s has been widely used in various branches of welding overlay’s industry related to wear. Characterization techniques are an important tool in the development

    Aug 16, 2017

  • NIOSH
    Deferoxamine Inhibition of Cr(V)-Mediated Radical Generation and Deoxyguanine Hydroxylation: ESR and HPLC Evidence

    By N. S. Dalal, X. Shi, P. M. Gannett

    "Chromates are known to induce tumors (1, 2), mutations (3), and DNA damage (4-6). However, the underlying biochemical mechanism(s) is (are) not fully understood (6). Recent studies have indicated tha

    Mar 1, 1992

  • AUSIMM
    Defining a Sampling Strategy for a Continuous Flow Supported by Geostatistical Simulations

    By D M. Marques, J F. C L Costa

    The estimation of process plant head grade is not trivial and is a source of constant dispute within the mining industry. Grade estimates informed by the short term mine planning are frequently not re

    Aug 21, 2012

  • ISEE
    Defining and controlling the environmental impacts of blasting at a major opencast coal mine

    By D. Mason, W. J. Birch

    Blasting operations are arguably one of the most contentious areas of surface mining.Many operators carry out outine monitoring as required by Mineral Planning Authorities. However in so doing they on

    Jan 1, 2011

  • SME
    Defining Blending Classes to Solve Open Pit Scheduling Problems

    By J. Gonzales

    For this paper, blending is conceived as a linear process that takes a proportion from one stockpile or location and mixes it with another proportion from another stockpile or location, with the aim o

    Jan 1, 2019

  • SME
    Defining hazard from the mine worker’s perspective

    By C. L. Kosmoski, B. M. Eiter, B. P. Connor

    "In the recent past, the mining industry has witnessed a substantial increase in the numbers of fatalities occurring at metal and nonmetal mine sites, but it is unclear why this is occurring. One poss

    Nov 1, 2016

  • CIM
    Defining in-situ block size

    By M. Grenon

    "The presence, size, orientation, nature, and persistence of geological discontinuities dictate the behaviour of a rock mass. Block size, which is defined by discontinuity spacing, by the number of jo

    Jan 1, 1998

  • SAIMM
    Defining optimal drill-hole spacing: A novel integrated analysis from exploration to ore control

    By V. Miguel-Silva, B. C. Afonseca

    Drill-hole spacing analysis (DHSA) and optimization are becoming commonplace for uncertainty assessment and management in the mining industry. However, there is no standardized DHSA workflow, and the

    Jun 2, 2022

  • IOM3
    Defining overload conditions for 7.6 cm Knelson concentrator by use of synthetic feeds

    By G. B. Harris, A. R. Laplante

    Fine tungsten was used to mimic gold and fine and coarse silica and magnetite to mimic gangue. The optimum flow rate of fluidisation water varied from 1.7 l/min for fine silica to 5.6 l/min for coarse

    Jun 18, 1905

  • AUSIMM
    Defining Residual Risk for Successful Mine Closure – a Geochemical Perspective

    By T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham

    Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a

    Jun 28, 2016

  • AUSIMM
    Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion

    By H Bateman, I Cawrse, G Carnes, S Cawrse

    In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro

    Jan 1, 2009

  • CIM
    Defining the Operating Conditions of the Attrition-Leaching Process Using Thermodynamic Process Modelling

    By Imane Benhamed, Jaouher Diouani, Laurent Cassayre, Florent Bourgeois, Carine Julcour-Lebigue, Université de Carthage

    The attrition-leaching process aims at improving leaching performance when formation of passivation layers at the surface of leached particles is a severe limiting factor, as discussed recently by Jul

    Jan 1, 2016

  • DFI
    Definition of Drilling-Activity Patterns Based on Production Data Profiles

    By Diego Bellato

    Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th

    Jan 1, 2019

  • ABM
    Definição Das Variáveis Operacionais E Seus Valores Na Fabricação De Tubos Aletados De Cobre Por Colaminação

    By Estevesson Ferreira Miqueletti

    Neste trabalho, tiras de cobre foram laminadas para se obter tubos aletados. As variáveis importantes ao sucesso do projeto foram: a) a temperatura de tratamento térmico e b) a largura da tira. Tiras

    Aug 16, 2017

  • CIM
    Deflection Diamond Drilling at Wahana Mines

    By The Staff

    "THE Wabana iron ore mines, owned and operated by the Dominion Steel and Coal Corporation, Limited, .are on Bell Island in Conception bay, on the east coast of Newfoundland. Mining began on surface in

    Jan 1, 1960

  • SME
    Deformation and Failure Characteristics and Bearing Mechanism of a Pillar Group in Stage Open Stope Mining - Mining, Metallurgy & Exploration (2023)

    By Long An, Chao Wu, Yuanhui Li, Xing Sun, Shuai Xu, Changyu Jin

    Stage open stope mining (SOSM) maintains the stability of excavation openings by leaving a large number of rib pillars. Affected by the strong unloading due to stage mining and the low width-to-height

    Mar 8, 2023

  • SAIMM
    Deformation and fracture behaviour of the g-TiAl based intermetallic alloys

    By M. N. Mathabathe, A. S. Bolokang, C. W. Siyasiya, R. J. Mostert, G. Govender

    The b-solidifying g-TiAl intermetallic alloys of nominal composition Ti-48Al (binary alloy), Ti-48Al-2Nb (ternary alloy), Ti-48Al-2Nb-0.7Cr (quaternary alloy), and Ti-48Al-2Nb-0.7Cr-0.3Si (quinary all

    Apr 1, 2021

  • CIM
    Deformation and Structural Controls on Gold Mineralization in the Clarence Stream Shear Zone, Southwestern New Brunswick, Canada

    By K. G. Thorne, D. R. Lentz, A. F. Park

    "The Main zone of the Clarence Stream gold deposit is hosted by a shear zone adjacent to the Saint George batholith in southwestern New Brunswick. The mineralization history relates to progressive def

    Jan 1, 2008

  • SAIMM
    Deformation Behaviour of Aluminium Low-Micron MMCs and MMNCs at Warm Working Temperatures (0.3—0.5 Tm)

    By Z. Gxowa, L. H. Chown, U. Curle, G. Govender

    This work evaluates the deformation behaviour, at warm working temperatures, of green particle-reinforced aluminium composites produced by powder blending in a high-energy ball mill. The work focuses

    Jan 1, 2016