Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Design-By-Analysis of Water-Cooled Gas Handling DuctsBy T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani
"Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,
Jan 1, 2017
-
Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in SaskatchewanBy Witold J. S. Ostrowski
Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with
Jan 1, 1967
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case HistoryBy Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Designer Tailings – An Integrated Model for Tailings ManagementBy T Baumgartl, T Huynh, K Tungpalan, E Wightman, M Edraki, M Tayebi-Khorami, L Huang, S Palaniandy, E Manlapig
With the increasing rate of tailing production worldwide there is a growing concern about the hazards of tailings storage facilities (TSF). Past and current mining, processing and waste disposal strat
Jul 16, 2014
-
Designing a Collaborative System for Socio-Environmental Management of Industrial WasteBy F. Baldini, M. S. Borges
"The proposed method emphasizes the optimization of waste management with regard to the exploitation of raw materials incorporated in the remains of industry, as well as the economics of natural resou
Jan 1, 2011
-
Designing a Geostatistical-Based U-Spatial Statistics Algorithm for the Separation of the Anomaly Area: Application at Baghqloom Porphyry Copper System, Southeastern Iran - Mining, Metallurgy & Exploration (2021)By Omid Asghari, Seyed Reza Ghavami-Riabi, Sajjad Talesh Hosseini
Separation of geochemical anomalies from the background using various methods for identifying areas of higher mineral potential is a critical first step in Greenfield and Brownfield programs. There ar
May 3, 2021
-
Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024By Sean Warren, JOSEF BOURGEOIS
The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute
Feb 1, 2024
-
Designing An Information Management System For Mineral Processing PlantsBy G. A. Kosick, L. Kuehn
The design of an information management system (IMS) for a mineral processing plant requires prior consideration of many factors, which can be broadly categorized into two domains, process plant consi
Jan 1, 1993
-
Designing An Oil Shale Mine Ventilation System ? IntroductionBy Floyd C. Bossard
In underground mining operations, the over- riding issue has to be protection of worker health and safety. The employees underground, making a living in a dangerous occupation, know these are major is
Jan 1, 1983
-
Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction MethodsBy Matthew Anderson, David Day, Paul Smith
"The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me
Jan 1, 2016
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Designing and developing an integrated cave management systemBy A. van As, J. McGaughey, M. J. Mol, R. Tosen
Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la
Jan 1, 2014
-
Designing And Implementing Of Noise Control Method Due To Ball Charge In Primary Ball Mills Of Sarcheshmeh Copper ComplexBy E. Esmaeilzadeh
There arc 8 primary ball mills in the concentrator plant and their task is material crushing. At the time of balls charge to mills, a lot of noise is produced. This noise would affect all grinding are
Jan 1, 2007
-
Designing and modeling mesh communications in underground coal minesBy Michael E. Karmis
New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer
Jun 1, 2010
-
Designing And Modeling Wireless Mesh Communications In Underground Coal MinesBy K. R. Griffin
New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen
Jan 1, 2010
-
Designing and Operating Backfill Systems on a South African Gold MineFor effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,
Jan 1, 1998
-
Designing and Planning for Maximum Grinding Mill Availability - A Team ApproachThe mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d
Jan 1, 2008