Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific RimBy J M. Totterdell
The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early
Jan 1, 1995
-
Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific Rim (89cff146-d60b-4074-bb84-62f6785f9161)By Totterdell JM
The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early
Jan 1, 1995
-
Permian Sedimentation in the Newcastle Coalfield, N.S.W.Factual data about the sedimentation in the Newcastle Coal Measures are presented. Data concerning the total coal measure sequence (isopachs, sand/shale ratio, and total coal thickness variation), dat
Jan 1, 1970
-
Permissible Limits Of Toxic And Noxious Gases In Mine And Tunnel VentilationBy R. R. Sayers
VENTILATION may be defined as the process by which vitiated air of an inclosed or partly inclosed space is continuously replaced by fresh air. Fresh air has been defined as invigorating pure air. Pure
Jan 7, 1926
-
Permissible Limits Of Toxic And Noxious Gases In Mine And Tunnel Ventilation (262188d5-7836-4a0e-a28b-04726ba5c937)By R. R. Sayers
VENTILATION may be defined as the process by which vitiated air of an inclosed or partly inclosed space is continuously replaced by fresh air. Fresh air has been defined as invigorating pure air. Pure
Jan 7, 1926
-
Permissible Wireless Real Time Survey Tool - ObjectiveProvide the mining industry with a wireless surveying system for increasing efficiency in the drilling of methane drainage or exploration boreholes. Approach The Bureau of Mines has pioneered th
Jan 1, 1984
-
Permissible-Type Dust Counter For Coal MinesBy Sabert Oglesby, Albert L. Thomas
Until recently, probably the best means of sampling airborne dusts has been the impinger method. Dust-laden air is drawn into a sampling tube, and the particulate matters separated from the air and co
Jan 3, 1959
-
Permit Exemption Strategies For Onsite Waste Processing FacilitiesBy Rolf R. von Oppenfeld
Onsite hazardous waste processors often find obtaining a Treatment Storage and Disposal (TSD) permit one of their first major challenges. Some processors may spend the time and money required by the p
Jan 1, 1996
-
Permitiing A Heap Leach Operation In South Dakotathe Iddden CostsBy Luther J. Russell
Mineral development in South Dakota is aggressively encouraged by both state statute and county ordinances. Yet, an increasingly conservative philosophy is taking hold, resulting in expanded regulator
Jan 1, 1998
-
Permitted Explosives for the 21st CenturyBy D Chalmers
Drill and blast mining techniques are used to mine coal outburst prone and high gas content coals in Australia. As the risk of an outburst is increased in high gas content coal, it is considered that
Jan 1, 2007
-
Permitted Explosives Research work in AustraliaBy Duncan Chalmers, Rob Nowell, Miguel Araos
Australian underground mines produce in excess of 60 mtpa of coal. Most of these use the longwall method, and they require the use permitted explosives (which are called “permissible” in other countri
Jan 21, 2025
-
Permitting A High Profile MineBy R. E. Nelson
The Alton Coal project, located in south-central Utah, lies at one point just over six miles from Bryce Canyon National Park. This region of the southwestern United States has been called the "Golden
Jan 1, 1988
-
Permitting and compliance procedures outlined for Consol’s Bailey coal mineBy Jonathan M. Pachter
Introduction The Bailey mining complex is located in Greene County, PA, in the Talley Run valley. It includes two Pittsburgh No. 8 seam deep mines (Bailey and Bailey No. 2), a coal preparation plant,
Jan 9, 1985
-
Permitting in mining projects and their challenges in PerúBy Miguel Gutiérrez
This paper will seek to provide an awareness of the challenges the permitting process presents to the engineering design for open pit mining projects in Perú. This awareness will create a better under
Sep 21, 2013
-
Permitting in the face of uncertainty – how to deliver confidence to regulators and investorsBy R L. Grogan
Mining is currently undergoing a progressive expansion into novel environments (such as the deep ocean), commodities (such as tantalum, rare earths, and other ‘green economy minerals’), and new method
Jul 25, 2018
-
Permitting New Tunnels in Southern Ontario, Canada—Panacea, Pragmatism, and ProfessionalismBy Adrian Coombs, Paul Magowan, Derek Zoldy
Continued development and intensification are fuelling the urgent need for new trunk infrastructure within The Regional Municipality of York and throughout the Greater Toronto Area. Permitting of thes
Jan 1, 2007
-
Permitting Process For Coal Mining - Federal And StateBy Lyle D. Randen
With the environmental movement beginning in the late 1960's came a deluge of permit requirements for the mining industry. Coal mining has been one of, if not the most, severely impacted of the m
Jan 1, 1983
-
Permitting the Grey River DredgeBy E Breese
The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite
Jan 1, 1989
-
Permitting, Construction and Commissioning of a New Slag Landfill at Boliden HarjavaltaBy Esa Peuraniemi, Hanna-Leena Heikkilä
Boliden Harjavalta has been operating a copper flash smelter since 1949. Thus, in 2019, the smelter is celebrating its 70th anniversary of flash smelting. Slag formation is an integral part of the sme
Jan 1, 2019
-
Permitting, Construction and Commissioning of the Gosowong Gold Mine, Halmahera, IndonesiaBy D J. Corp
The Halmahera Contract of Work is a sixth generation contract held 82.5 per cent by Newcrest Mining Limited and 17.5 per cent by PT Aneka Tambang and takes in the Gosowong Project area. In 1991 Newcre
Jan 1, 1999