Search Documents

Sort by

  • SME
    Process Controlling, Understanding, And Optimization In A Solution Salt Mine Through The Data Acquisition System.

    By V. de Ruiter

    In the northwestern part of the Netherlands lies the deepest solution salt mine in the world. The company operating the mine is Frisia Zout bv (part of the K+S group). Extracting the NaCl from caver

    Jan 1, 2008

  • CIM
    Process Costs: From Conventional Accounting to ABC

    By O. Schnake, M. Isakson, C. A. Landolt

    The paper presents the conceptual basis for the development of an Activity Based Costing system (ABC) for the analysis and estimation of process costs in mining and metallurgy. In particular, it discu

    Jan 1, 2007

  • SAIMM
    Process Description And Abbreviated History Of Anglo Platinum?s Waterval Smelter

    By M. Jacobs

    Keywords: Smelting, converting, sulphide, sulphide smelting, platinum, platinum group metals, PGM, base metals, nickel, copper, matte, slag, furnace, electric furnace, Söderberg, electrode, granulatio

    Jan 1, 2006

  • CIM
    Process Description and Aerosol Exposures at Vale Canada’s (Inco’s) Copper Cliff Nickel Refinery

    "As part of a series describing the nickel operations of Vale Canada (formerly known as Inco), this paper focuses on the 1973 to current operations of the Copper Cliff nickel refinery in Ontario, Cana

    Jan 1, 2015

  • SAIMM
    Process Description And Optimization Of The Flash Dryers At Polokwane Smelter

    By P. K. Van Manen

    Anglo Platinum's Polokwane Smelter is situated outside Polokwane, in the Limpopo Province of South Africa. Wet concentrate is received from various concentrators along the Eastern Bushveld Comple

    Jan 1, 2006

  • SAIMM
    Process Description And Short History Of Polokwane Smelter

    By J. Ndlovu, R. Hundermark

    Keywords: Anglo Platinum, Polokwane Smelter, pyrometallurgy, metallurgy, platinum, platinum group metals, PGM, base metals, nickel, copper, sulphide smelting, electric furnace, Söderberg, electrode, m

    Jan 1, 2006

  • CIM
    Process Design and Change Management for Successful Deployment of Technology in Mining

    By Laura Mottola

    Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.

    May 1, 2010

  • AUSIMM
    Process design and commissioning of the Goedehoop coal processing plant

    By Swann CA

    In order to meet export sales requirements from 1983 onwards, Amcoal developed a new underground mine in the Witbank area of the Transvaal. The mine was required to produce 5 million tons of run o

    Jan 1, 1986

  • SME
    Process Design And Implementation Techniques For Secondary Crushing To Increase Milling Capacity

    By understanding the ore breakage characteristics and utilising comminution circuit modelling, the benefits of SAG mill feed size manipulation can be readily assessed. This paper looks at the benefits

    Jan 1, 2007

  • SME
    Process Design And Operation At The Alligator Ridge Mine*

    By R. J. Sawyer

    *An earlier version of this paper was presented at the IMM meeting, "Use of Cultivated Carbon in Extraction of Gold and Other Metals," held in London in January, 1983, and was subsequently published i

    Jan 1, 1984

  • TMS
    Process Design and Optimization for High-Temperature Vacuum Carburizing

    By X. Jay Gao

    A fast high-temperature carburizing process integrated with materials design and optimization via a systems design approach was developed to significantly reduce process cycle time. Process experimen

    Jan 1, 2003

  • AUSIMM
    Process Design Aspects at Bendigo Mining's Gold Operations

    By T E. Hayward, D H. English, S J. Smith

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • SAIMM
    Process Design Aspects At Bendigo Mining?s Gold Operations

    By E. J. McLean

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • CIM
    Process Design Consideration for a Small Gold Mill in the Northwest Territories

    By A. M. Childs, R. F. Mather, K. R. Rawling

    "The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn

    Jan 1, 1983

  • CIM
    Process design considerations for the fluidized bed technology applications in the nickel industry

    By K. Adham, C. Lee

    Over the last forty years, a number of specific fluidized bed applications in nickel extraction have been developed for commercial use. Five important processes have gained particular acceptance, name

    Jan 1, 2004

  • SME
    Process Design For Control Of Sludge Production From Wet Phosphoric Acid Processing ? I. Introduction

    By Paul L. Bearden

    The accumulation, handling, and utilization of sludges formed from wet process phosphoric acid is one of the major problems in the industry. The purpose of this paper is to explain some of the cons

    Jan 1, 1966

  • AUSIMM
    Process Design for Flocculation, Clarification and Thickening of Fine-Particle Suspensions

    The effects of process variables such as solution chemistry, flocculent type and dosage, intensity and duration of mixing, and solids type and concentration, on the performance of flocculation/clari

    Jan 1, 1993

  • AUSIMM
    Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery

    By K E. Barns, P J. Sharman, S A. Thomas and

    This paper presents the development of a regrind facility design at BHP BillitonÆs Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of pl

    Jan 1, 2007

  • SAIMM
    Process Design Of A Regrind Facility At The Leinster Nickel Operations To Improve Concentrator Recovery (730f9c77-ea3f-4530-b6a8-5498efccd480)

    This paper presents the development of a regrind facility design at BHP Billiton's Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis

    Jan 1, 2007

  • SAIMM
    Process design of the Phola coal preparation plant - Synopsis

    By G. M. Cresswell

    The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing

    Jan 1, 2010