Search Documents

Sort by

  • AUSIMM
    Qualitative Simulation of Continuous-Flow Technology and Working Face Complexes for Underground Mining of Hard Ores

    By G A. Streltsova

    In the paper the main concept of qualitative simulation is determined when computer-aided designing and forecasting of designs of robotised continuous-flow working face complexes for underground minin

    Jan 1, 2003

  • AIME
    Qualities of Pig iron

    By Ralph Sweetser

    THE Round Table. on Qualities of Pig Iron, under the auspices of the Joint Committee on Qualities of Pig Iron, which is made up of members of the American Institute of Mining and Metallurgical Enginee

    Jan 1, 1936

  • ISEE
    Qualitir Software Suite, Computer Aided Blast Design

    By M Thierry Bernart

    The software QUALITIR is a software developed by CNSIDCI, framework on five research and experimentation years. This conceived tool by specialists for professionals is a decision aided design tool con

    Jan 1, 1997

  • SME
    Quality And Reliability In Rock Bolting

    By Gene Mattila

    Each installed rock bolt costs in excess of 520.00. High cost in conjunction with the primary purpose of safety makes it only logical to install the highest quality anchors possible. Each bolt has de

    Jan 1, 1985

  • ISEE
    Quality Assessment of Blast-induced Rockmass Damage for Underground Excavations

    By Surinder Singh, Vassilios Kazakidis, Damian Gregory

    Safety, stability, and functionality of mine excavations depend on the structural integrity of the surrounding rock mass. Various explosives and perimeter control blasting techniques have been develop

    Jan 1, 2008

  • IMPC
    Quality Assessment Of Demolition Waste Using Innovative Sensing Devices And Architectures Based On Hyperspectral Imaging

    By S. Serranti

    The recycling of end-of-life concrete into new concrete is one of the most interesting options for reducing worldwide natural resources use and emissions associated with the building materials sector.

    Sep 1, 2012

  • DFI
    Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange

    By Travis Coleman, Elvis Ishimwe

    Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic

  • DFI
    Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST

    By Gerald Verbeek, Erick Baziw

    "Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit

    Jan 1, 2017

  • DFI
    Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test

    By Liqun Liang

    Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and

    Jan 1, 2011

  • CIM
    Quality Assessment/Quality Control (QA/QC) for Resource Estimation at Inco Technical Services Limited

    By Christopher R. Davis

    Resource modelling is the basis for any economic appraisal of a mining project and includes a number of steps from data acquisition and validation to resource reporting and classification. At each s

    May 1, 2001

  • AUSIMM
    Quality Assurance

    Quality Assurance has become a buzzword amongst governments and industry. Notwithstanding the world class work done by its committees in developing codes of ethics and of practice in field geological

    Jan 1, 1994

  • AUSIMM
    Quality Assurance and Quality Control of the Interpretation of the Geological Economic Commodity Concentrations is Important in Getting a Mineral Resource Estimate Right

    The mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla

    Jan 1, 2007

  • SAIMM
    Quality Assurance And Quality Control Of The Interpretation Of The Geological Economic Commodity Concentrations Is Important In Getting A Mineral Resource Estimate Right (1395cc34-aa17-41b7-adb8-39a965a3d5e4)

    By T. Lee

    The mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla

    Jan 1, 2007

  • IMPC
    Quality Assurance and Sampling Methods Regarding Municipal Solid Waste

    By Thomas Pretz, Alexandra Pehlken

    Sampling of municipal solid waste is known to be difficult to sample if it has to be representative. When dealing with municipal solid waste, the usual method is to study separately waste material bel

    Jan 1, 2003

  • CIM
    Quality Assurance in Capital Projects, Opportunities and Challenges

    By Wilson Pascheto

    One of the main outcomes of a capital project is the reliability of a new plant, system or equipment. During 20 years of experience working in various capital projects for the mining industry, the aut

    Jan 1, 2015

  • DFI
    Quality Assurance In Jet Grouting For A Deep Seated Slab In Amsterdam

    By Thomas Passlick

    By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as

    Jan 1, 2006

  • SME-ICGCM
    Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry

    By Peter Fischer

    Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi

    Jan 1, 2006

  • DFI
    Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary

    By Bill Starke

    The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c

    Jan 1, 1997

  • AUSIMM
    Quality Assurance of Sampling and Assaying in the Evaluation of Gold Resources

    The financing of mineral ventures is usually supported by the valuation of a mineral asset, the physical size and composition of which have been determined within quantified limits of accuracy in o

    Jan 1, 1990

  • CIM
    Quality Assurance Programs for Fabrication of Specialised Vessels and Exotic Alloy Piping

    By M. Pearson, W. Bristowe, A. Hanson

    "There&apos;s no such thing as quality assurance; only quality control ... by inspection. "(1) A common misunderstanding in the procurement and construction of custom designed, fabricated pressure ves

    Jan 1, 2004