Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Setting Priorities For Mine Safety And Health Research (17bdcc28-13d2-43f2-85ce-af4e84701498)By R. L. Grayson
In 1995, Congress abolished the Bureau of Mines in the Department of Interior but preserved the safety and health research functions being performed at the Pittsburgh and Spokane Research Centers. The
Jan 1, 1998
-
Setting Processing Plant Projects up for Success in AustraliaBy R Young
Independent Project Analysis (IPA) is in the business of benchmarking the performance of capital projects on behalf of owner companies in the processing and extractive industries. IPA assesses between
Aug 8, 2011
-
Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest AustraliaBy E J. B van Etten
Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys
Oct 5, 2011
-
Setting the basis of big-data in impact crushing, S. Lange and H. LieberwirthBy S. Langea, H. Lieberwirth
Impact crushers are common machines in comminution plants. Their high size-reduction ratio and relatively simple design, make them a preferred tool even when subjected to harsh wear, and producing a l
Jan 1, 2020
-
Setting the Record StraightBy Don Thompson
It isn?t a lie if you don?t tell the whole truth The pictures National Geographic didn?t print Other photos National Geographic didn?t print?
May 1, 2009
-
Setting the Record Straight (1e43186a-ec2a-4801-b2d8-fe8de2f5f8ed)By Don Thompson
Canada’s oil sands are a controversial topic and virtually every newsmaker and layperson seems to have an opinion about this 179 billion barrel resource. The oil sands represent 97 per cent of Canada’
Jan 1, 2010
-
Setting The Scene: Rockpass Accident Statistics And General Guidelines For The Design Of RockpassesRecords over the past ten years indicate that there is potential for serious multiple accidents due to engulfing associated with rockpasses. Significant attention is not usually given to the design of
Jan 1, 2005
-
Setting Time of Concrete Material; Laboratory Measurements versus Field ApplicationsBy Samir N. Shoukry, Mourad Y. Riad, Gergis W. William
"Setting of concrete material is defined as the transitional period between states of true fluidity and true rigidity. Initial and final setting times are measured in the laboratory on the mortar siev
Jan 1, 2012
-
Setting Up A Project Organization For Efficient Mill Or Plant Design ? IntroductionBy R. K. Young
Producing a sound plant design for a major project requires hundreds of engineers and many drawings. Economical accomplishment of this task is based upon careful and orderly organization of the design
Jan 1, 1960
-
Settings and Styles of High-Sulphidation Gold Deposits in the Cajamarca Region, Northern Per·The Yanacocha district hosts the largest and most significant acid-sulphate, high-sulphidation deposits in Per· with total production, reserves and resources of over 27 million ounces of gold. Several
Jan 1, 1999
-
Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case HistoryBy R. Heath Forbes
The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted
Jan 1, 2011
-
Settlement Behaviour Of Pile Foundation ? SynopsisBy W. Y. Xu
In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe
Jan 1, 2010
-
Settlement Control Of A Road Embankment Using Vertical DrainsBy Wei Tu
A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that
Jan 1, 2009
-
Settlement Evaluation of Large Water Storage Tanks Under Challenging ConditionsBy Ben M. Lewis, Yogesh Prashar
"The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal
Jan 1, 2016
-
Settlement Monitoring Of A Building Underpinned With Micropiles And Soil NailsBy Bill Zietlow
A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn
Jan 1, 2008
-
Settlement Of A Building After Cutting Off Pile Tips Due To TunnellingBy Richard A. Forth
During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor
Jan 1, 2002
-
Settlement of Tailings Slurries by Creep CompressionBy J. Don Scott
Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating
May 1, 2004
-
Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USABy Rudolph P. Frizzi
This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary
Jan 1, 2003
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
Settlements Due to Blasting VibrationsBy Werner Bilfinger, Claudio Nahas, Marcelo Waimberg
"INTRODUCTION The so called Porto Maravilha Project consists of the re-urbanization of a 500 ha area in the Rio de Janeiro port region. Several changes in local infrastructure are being implemented, i
Jan 1, 2016