Search Documents

  • SME
    Mine Planning And Evaluation With A Dedicated Computer Graphics System - Introduction

    By Edward L. Mooney

    The past 15 years has .seen a dramatic increase in the use of computers in the mining industry. Sanford (1) has provided a comprehensive listing of available programs by application within the mining

    Jan 1, 1979

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Mine Planning and Grade Control - Goldsworthy

    By Newman H. A

    Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi

    Jan 1, 1973

  • IIMP
    Mine planning and ore control data integration

    By Pabel Alvarado

    Mineral deposits with large data uses different block dimensions in Long term planning (LTP), short term planning (STP), and ore control (OC). Using applications can Re-block, Krige, Compute variable,

    Sep 1, 2017

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • AUSIMM
    Mine Planning and Scheduling at Ranger Uranium Mine-Environmental Requirements and Economics

    Ranger Uranium Mines (RUM) operates an open cut located in the Top End of the North- ern Territory. Strict environmental controls govern all operations and the water management requirements have th

    Jan 1, 1984

  • AUSIMM
    Mine Planning at Murrin-Murrin ù Modelling to Determine the Optimum Path

    The process of mine planning at AnacondaÆs nickel and cobalt laterite operation located at Murrin-Murrin in the Northern Goldfields of Western Australia is carried out in a number of stages in an ende

    Jan 1, 2003

  • SME
    Mine Planning At Newmont Gold

    By S. P. Winkelmann

    The expansion in gold production in the Carlin 'Trend over the last few years has been one of staggering proportion. To increase gold production while minimizing capital requirements and providin

    Jan 1, 1990

  • SME
    Mine Planning at Newmont’s Nevada Operations

    By Steven Hoerger

    Newmont Mining has a large, integrated gold-mining operation in northern Nevada with several mines, stockpiles and processing facilities. There are more than 90 defined metallurgical ore types and mo

    Jan 1, 1999

  • SME
    Mine Planning At Round Mountain Gold Corporation

    By Stephen J. Brower

    Located in Central Nevada, The Round Mountain Gold deposit has been continuously mined since 1977. Present proven and probable reserves are 226 Mt (250 million short tons) at 1.1 g/t (.032 oz per shor

    Jan 1, 1989

  • AUSIMM
    Mine Planning at the Mae Moh Lignite Mine Thailand

    The Electricity Generating Authority of Thailand own and operate an opencut mine supplying coal to on-site power stations at Mae Moh, 600 km North of Bangkok. The mine is being expanded from an an

    Jan 1, 1986

  • SME
    Mine Planning At The McKinley Mine

    By M. G. Premo

    The McKinley Mine is located in the northwest New Mexico, in McKinley County, approximately 25 miles from Gallup. The mine is operated by The Pittsburg & Midway Coal Mining Co. (P&M), a wholly owned s

    Jan 1, 1992

  • AUSIMM
    Mine Planning by Quarters

    By B Ascott, J Kennedy, A White

    At mines with low tonnes per vertical metre, like the Jundee Mine in Western Australia, operated by Newmont Asia Pacific, high development rates across multiple mining areas are critical to achieving

    Jan 1, 2008

  • SME
    Mine Planning Considerations In Analyzing Alternative Materials Handling Systems For Surface Mines

    By James E. Lonergan

    To determine the best materials handling system for surface mined materials, one must develop a mine plan for each candidate system based on the most efficient use of that system. This is essential fo

    Jan 1, 1985

  • CIM
    Mine Planning Efficiency: A Quest for Improvement

    By Alan D. Curtis

    A standard planning block model for Phelps Dodge North America Operations has been developed to improve mine planning efficiency and performance in a skill starved environment. The model saves time on

    May 1, 2007

  • AUSIMM
    Mine Planning for Coal Project Development

    By Westcott PC

    The development of a coal project must pass through a number of phases, taking it from a preliminary evaluation through to detailed mine planning. For each phase the cost of data acquisition and a

    Jan 1, 1983

  • NIOSH
    Mine Planning For Hazard Evasion - The Objective:

    To provide a means for rapidly evaluating proposed mine layouts in order to avoid potential hazards while minimizing loss of coal. The Approach: Development of a computer program that will com

    Jan 1, 1974

  • SME-ICGCM
    Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects

    By Thomas L. Vandergrift

    Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine

    Jan 1, 2000

  • AIME
    Mine Planning For Maximum Production

    By Milton C. Head, Aulton E. Roland, William E. Hawes

    INTRODUCTION Uranium mining in the Grants Mineral Belt has undergone changes from methods pioneered during the 1950's and has now become fairly standardized throughout the district. The orebo

    Jan 1, 1982

  • CIM
    Mine Planning for Ore Dilution

    By John G. Henning

    Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents results of a study on the influence of a

    May 1, 2007