Search Documents

  • TMS
    Optimization of Continuous Slag/Matte Separation in Mitsubishi Process by Using Numerical Heat and Fluid Flow Analysis

    By Akira Kaneda, Nozomu Hasegawa

    "In the Mitsubishi Continuous Copper Smelting and Converting Process, slag/matte mixture overflowed from the smelting furnace is separated continuously in an electric furnace (slag cleaning furnace, C

    Jan 1, 2000

  • SME
    Optimization of Costs for Trackless Mining Ventilation and Cooling Systems

    By C. A. Rawlins, P. Rostami

    "Ventilation systems are not only an integral part of any underground mine design but are a significant contributor to the mine’s capital and operating costs. The ventilation and cooling design system

    Jan 1, 2015

  • CIM
    Optimization of Cu SX by Control of the Acidity

    By B. Grinbaum

    The solvent extraction of Cu from acidic leach solutions is carried out using oxime extractants. The mechanism can be described as liquid ion exchange, where a labile H+ in the oxime replaces Cu++ ion

    Jan 1, 2007

  • SAIMM
    Optimization of Cut-Off Grades Considering Grade Uncertainty in Narrow, Tabular Gold Deposits

    By C. Birch

    "Mineral reserve statements as well as optimizing mine planning require a block model with grades for each mining block. A cut-off grade is determined by considering the mining costs as well as the ex

    Jan 1, 2017

  • SME
    Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit Mines

    By Qiong Wu, Qinghua Gu, Yichuan Lv, Jin Yuan, Caiwu Lu

    "The cut-off grade is one of the important parameters of mining production. Different material cut-off grade is directed to different destinations. Based on reasonable and optimal cut-off grade, long

    Jan 1, 2017

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASING

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Optimization Of Design Of Drilled Shaft Foundations By Lateral Load Testing

    By Donald R. Clark

    Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

  • DFI
    Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)

    By Donald R. Clark

    "Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

    Jan 1, 2017

  • ISEE
    Optimization of Development Drilling and Blasting in an Underground Mine

    By B Mohanty, G Ludwig

    A thorough assessment of development drilling and blasting practice was carried out at two underground mines at INCO operations in Thompson, Manitoba. The study showed that significant improvement in

    Jan 1, 1998

  • CIM
    Optimization of Die Cooling in the Aluminum Alloy Wheel Casting Process

    By Jianglan Duan, Steve L. Cockcroft, Andre B. Phillion, Carl Reilly, Daan M. Maijer

    "In the aluminum alloy wheel casting process, careful design of the cooling system in the die and its operation (cooling channel timing) are critical to achieve quality and productivity goals. The pro

    Jan 1, 2014

  • SAIMM
    Optimization Of Diesel Usage At Uitvlugt Mine - Synopsis

    By O. G. Motlogelwa

    Any company operating a fleet of trucks will be greatly advantaged if the associated fuel costs can be decreased. The optimal tonnage that trucks should be hauling to ensure minimum consumption of die

    Jan 1, 2013

  • SME
    Optimization Of Dispatching Criteria For Open-Pit Truck Haulage System Design Using Multiple Comparisons With The Best And Common Random Numbers

    By D. R. Kalasky, J. M. Mutmansky, B. Kolonja

    This paper considers simulation of truck dispatching systems using maximum expected production of the truck-shovel system as the measure of performance. Two analysis methods are utilized: multiple com

    Jan 1, 1995

  • SME
    Optimization Of Dispatching Criteria For Open-Pit Truck Haulage System Design Using Multiple Comparisons With The Best And Common Random Numbers (49716460-0398-4e41-bf3c-d300203bdff4)

    By B. Kolonja

    This paper considers simulation of truck dispatching system designs using maximum expected production of the truck-shovel system as the measure of performance. Two methods are utilized, multiple compa

    Jan 1, 1994

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • DFI
    Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test Results

    By John C. Niedzielski

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • SME
    Optimization of Drying and Preheating Temperatures During Pellet Induration for Utilizing Goethitic Iron Ores

    By Rameshwar Sah, Basavaraja Maribasappanavar, Sangamesh Desai, G. Balachandran, Ravi Kant Sagar

    The present research work deals with the effective utilization of hematite ore containing goethite, kaolinite and gibbsite losson- ignition (LOI) phases in pellet making without deteriorating product

    Jun 4, 2022

  • TMS
    Optimization of Ductile Iron Treatment by Computing the Refining Reactions in Liquid Irons

    By S. N. Lekakh

    Experimental work and thermodynamic simulations of cast iron refining were carried out using various additions of alkali and rare earth metals. The refining reactions for sulfur and oxygen removal wer

    Jan 1, 2009

  • TMS
    Optimization Of EAF Practices Based On Real Time Off-Gas Chemistry Analysis Using Goodfellow EFSOP?

    By Marshall Khan

    The Goodfellow Expert Furnace System Optimization Process (Goodfellow EFSOP?) is a proprietary process that uses real-time and continuous off-gas analysis, along with process monitoring to optimize th

    Jan 1, 2006