Search Documents

  • SME
    Optimum Drilling And Blasting Procedures

    In some 35 years in the explosive and construction industries, we have probably seen the extremes in drilling and blasting practices. All of you know that it is difficult if not impossible, to separat

    Jan 1, 1986

  • AIME
    Optimum Dump Planning In Rugged Terrain

    By Ernest L. Bohnet

    Jan 1, 1985

  • SME
    Optimum Duration For Bioheap Pretreatment Of Refractory Sulfidic Gold Ores

    By Robert W. Bartlett

    Pretreatment of sulfidic refractory gold ore by biooxidation in coarse-crushed ore heaps is a promising new technology, especially for low-grade ores that cannot afford pressure leaching or roasting.

    Jan 1, 1995

  • TMS
    Optimum Effect of Factors Influencing on Sacrificial Cathodic Protection for Steel Wall

    By Saad Elias Kaskah

    "The Box-Behnken Design (BBD) is used to model the sacrificial Cathodic Protection System (SCPS) to find the factors effectiveness behaviour. For protection potential assessment the BBD receives (resi

    Jan 1, 2013

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • TMS
    Optimum Feed Preparation for Sulfide Smelting

    By Jyri Talja, Shaolong Chen, Hannu Mansikkaviita

    "For optimum smelting results, proper treatment of the feed is needed to ensure favourable conditions for ignition characteristics, heat balance, mass balance with tolerable impurity levels, and overa

    Jan 1, 2012

  • SME
    Optimum Fragmentation In Underground Mining

    By Kai Nielsen

    In underground mining coarse muck and large boulders lead to ineffective utilization of costly mining equipment, and extra expenses and delays caused by secondary blasting. Cost analysis in some Norwe

    Jan 1, 1986

  • AIME
    Optimum Life of a Resource Depleting Project

    By J. A. Corbyn

    An analysts of mining investment from the point of view of financial optimization is presented. The method uses differential equations to describe financial performance rather than the more usual meth

    Jan 1, 1985

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • CIM
    Optimum Material Solutions for Industrial Hydrometallurgical Equipment

    By T. Johnson, D. Kelley, J. Graham

    "Hydrometallurgical processes can be exceptionally corrosive. Conditions associated with metal extraction and refining require materials of construction that can withstand process acids and acid chlor

    Jan 1, 2012

  • SME
    Optimum Methane Drainage In Gassy Coal Mines

    By P. C. Thakur

    In gassy coal mines, some methane drainage is essential for mine safety, but the ratio of total methane drained to total methane produced by the mine can vary from 10 to 70 percent. The volume of met

    Jan 1, 2003

  • SME
    Optimum Mine Designs to Minimize Coal Blimps: A Review of Past and Present U.S. Practices

    By Matthew J. DeMarco, Anthony T. Iannacchione

    Coal bumps have presented serious mining problems in the U.S. throughout the 20th Century. Fatalities and injuries have resulted when these destructive events occur at the working face. Persistent bum

    Jan 1, 1992

  • NIOSH
    Optimum Mine Designs To Minimize Coal Bumps: A Review Of Past And Present U. S. Practices

    By Matthew J. DeMarco, Anthony T. Iannacchione

    Coal bumps have presented serious mining problems in the U.S. throughout the 20th Century. Fatalities and injuries have resulted when these destructive events occur at the working face. Persistent bum

  • AIME
    Optimum Mining Plan For Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal properti

    Jan 1, 1984

  • SME
    Optimum Open Pit Mine Production Scheduling by Lagrangian Parameterization - Introduction

    By Kadri Dagdelen

    Production scheduling of an open pit mine is one of the most important steps in open pit mine planning. The production schedule of a mine defines the distribution of cash flows and as a result directl

    Jan 1, 1986

  • SME
    Optimum Open Pit Production Sequencing-The Current State Of The Art

    By Y. C. Kim

    For the past quarter of century, much more effort and research have been expended in developing the "optimum" ultimate pit limit design algorithms and much less to solving the "optimum" open pit produ

    Jan 1, 1994

  • AIME
    Optimum Open- Pit Mine Production Scheduling

    By Thys B. Johnson

    Traditional mine planning concepts are discussed and suggestions for improvement through use of the developed model are proposed. The approach developed in this paper allows optimal planning of the co

    Jan 1, 1969

  • SME
    Optimum Open-Pit Mine Scheduling Considering Multivariate Grade Uncertainty Using Deep Q-Learning

    By Sebastian Avalos, Julian M. Ortiz

    The long-term mine scheduling is the optimal decision on how to extract and process the mining reserves. The resulting plan is mainly driven by economic, metallurgical, and geological factors. Account

    Jun 25, 2023