Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Planning and Construction of the Metro Gold Line Eastside Extension Tunnels, Los Angeles, CaliforniaBy Jim Richards, Eli Choueiry, Brett Robinson, Amanda Elioff
The Los Angeles Metro Gold Line Eastside Extension (MGLEE) extends Metro’s light rail system to the densely populated and growing East Los Angeles communities. Much of the 6 mile alignment consists of
Jan 1, 2007
-
Planning And Construction Of The Tohoku Shinkansen Ueno Shield Tunnel, Diameter Of 13MBy Hisakazu Matsushita, Yoshio Yamaguchi
INTRODUCTION Shinkansen, operating 1,176km between Tokyo and Hakata, transports 340,000 passengers a day. Presently, the 466km Tohoku Shinkansen linking Tokyo and Morioka and the 270km Jyoetsu Shin
Jan 1, 1981
-
Planning and construction of the Tumbler Ridge Branch LineBy V. W. Shtenko, B. J. Ennis, P. H. Bridge
"The northeastern region of British Columbia contains large quantities of high-quality metallurgical coal. To market the coal, it was necessary to provide the required infrastructure which included ra
Jan 1, 1983
-
Planning and Construction of Tunnels below the Suez Canal in Very Soft Soil Conditions under Complex CircumstancesBy Roland Trunk, Marcel Imbach, Yves Boissonnas, Jan Vesely
"INTRODUCTION The expansion of the Suez Canal, which runs between the Mediterranean and Red Sea, is at the top of Egypt’s economic agenda. The £8 billion development plan includes a new channel alongs
Jan 1, 2016
-
Planning and Cost Criteria for Mining InfrastructureBy Mahony BK
This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans
Jan 1, 1983
-
Planning And Design - A Crucial Phase In Open Pits And Quarries - Pit Planning And LayoutKey elements of open-pit design fixing the ultimate pit limits are stripping ratio, pit slope angle, and grade cutoff. Results of exploratory and development drilling should be reduced to horizontal s
Jan 10, 1967
-
Planning and Design Considerations for Shay Gap Township Built by Goldsworthy Mining LimitedBy Ellson I. G
Advantage has been taken of the need to build the new mining town of Shay Gap to incorporate a new standard of living in an isolated area, which suffers from climatic extremes. The various problems
Jan 1, 1973
-
Planning And Design Features Of The Waller Creek Tunnel, Austin, TexasBy Gary Jackson
Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, w
-
Planning And Design For Barrier Pillar Recovery Three Case HistoriesBy David A. Newman
Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu
Jan 1, 1995
-
Planning and Design for Rehabilitation of a Long Road Tunnel in Himalayan Ranges, IndiaBy R K. Dayal
Many transport tunnels show distress after few decades of construction. Owing to exorbitant cost of replacement, rehabilitation of tunnels has become inevitable and rapidly gaining attention/significa
Jan 1, 1999
-
Planning and Design for the Westside Light Rail Project Tunnels and Deep Underground Station in Portland, OregonBy D. S. McAllister, P. M. Rice, M. E. Fowler
The Westside Light Rail Project, a major 19.3-km (12-mile) extension of Portland, Oregon's light rail system, includes 4.6 km (2.8 miles) of twin 5.8-m (19-ft) diameter running tunnels, a binocul
Jan 1, 1995
-
Planning and Design of the A3 Hindhead Tunnel, Surrey, United KingdomBy Tom Ireland, Tony Rock
The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons
Jan 1, 2007
-
Planning and Design of the Bay TunnelBy Johanna I. Wong, R. John Caulfield, Victor S. Romero
The existing Hetch Hetchy water system, owned and operated by the San Francisco Public Utilities Commission (SFPUC), serves 2.4 million people within the San Francisco Bay Area. The system has existin
Jan 1, 2007
-
Planning and Designing Cavities for Underground Power House in HimalayasBy Garg R. K
Himalayan ranges on the northern border of India are source of many perennial rivers and suitable sites for large dams have been located therein. However, Himalayas are young mountains and compris
Jan 1, 1987
-
Planning and Designing For Mining ConservationBy David B. Brooks, Roger L. Williams
Control of the environment is as old as mining. Engineers have always had to consider how best to deal with the surface, and the character of the surface environment always affects mining method in so
Jan 1, 1973
-
Planning and Developing a New Mine in the Old Stawell GoldfieldThe history of potential large scale development at Stawell in northwestern Victoria dates back to 1914, when Great Boulder Mines Limited, of Kalgoorlie, Western Australia, took up options on some of
Jan 1, 1984
-
Planning and Development of Newstan Colliery, Newcastle, N.S.WIn preparing a paper such as this it was thought that the Newstan Colliery Company Ltd., being comparatively new, would need some introduction to mining people in general.The Newstan Company was forme
Jan 1, 1954
-
Planning and development of Syncrude's new truck and shovel oilsands mine"Syncrude Canada Ltd. operates one of the largest surface mines in the world. The mining operation has two distinct phases: (1) the removal of the overburden, utilizing trucks and shovels; and (2) the
Jan 1, 1993
-
Planning And Development Of The Deserado Mine - Rangely, ColoradoBy Don L. Deardorff
The Deserado Mine and transportation system is the fuel supply portion of the Bonanza Power Plant project. Deserado Mine con¬sists of an underground mine with a capacity of 1,224,700 tonnes (1,350,000
Jan 1, 1984
-
Planning and Development of the Lake Dufault MineBy J. R. Smith
"The Lake Dufault orebodies were discovered by deep surface diamond drilling. When a reasonable amount of outline drilling had been completed, the decision to go into production was made. The fact tha
Jan 1, 1966