Search Documents

  • SME
    Preliminary Evaluation Of The Effect Of Coal Cleaning On Trace Element Removal

    By Charles T. Ford

    In 1971, Bituminous Coal Research, Inc~ established a program to provide the coal industry with the necessary information and technical capability to investigate and evaluate potential problems concer

    Jan 1, 1977

  • SME
    Preliminary Evaluation Of The Factors Affecting The Use Potential Of Clays And Shales In Pennsylvania

    By David M. Lapham

    In Pennsylvania, 310 sampled sites of clay and shale have been evaluated for: potential use, chiefly as structural clay products, refractories, and lightweight aggregate; lithology; physical propertie

    Jan 1, 1971

  • AIME
    Preliminary Evaluation of the Factors Affecting the Use Potential of Clays and Shales in Pennsylvania (8dc09d8f-305e-443d-9ceb-6e141e41a393)

    By K. V. Hoover, D. M. Lapham

    In Pennsylvania, 310 sampled sites of clay and shale have been studied with regard to potential use, lithology, physical properties, fired properties, major-element chemical analyses, and quantitative

    Jan 1, 1972

  • CIM
    Preliminary evaluation of the methane production potential of coal seants at Greenltills Mine, Elkford, British Columbia

    By R. Augsten, K. K. Feng, K. C. Cheng

    "Methane emission and the desorption characteristics of vertical borehole coal samples of Greenhills multiple seams in the vicinity of Elkford, British Columbia were investigated. Three vertical boreh

    Jan 1, 1984

  • NIOSH
    Preliminary Evaluation Of Underground Coal Gasification At Hanna, Wyo.

    By G. G. Campbell

    The Bureau of Mines initiated a field test of underground coal gasitication to investigate the technologic feasibility of gasifying a subbituminous coal. The test site is near the town of Hanna, Wyo.,

    Jan 1, 1974

  • AIME
    Preliminary Evaluations Of Surface Mine Prospects

    By Stanley W. Sundeen

    2.3-1. Introduction. The subject-"Preliminary Evaluation of Coal, Metallic and Industrial Mineral Deposits for Surface Mining'-seems at first glance to be definitive and not likely to be misinter

    Jan 1, 1968

  • TMS
    Preliminary Experimental Study of the Thermal Stability and Chemical Reactivity of the Phosphate-Based Binder Used in Al2O3-Based Ceramic Foam Filters (CFFs)

    By K. W. Cathrine Solem

    Filtration of liquid aluminium is widely used in the industry for the removal of inclusions, and Ceramic Foam Filters (CFFs) are often the filtration media of choice. It is known that PH3 (phosphine)

  • ISEE
    Preliminary Experiments in the Use of Small Explosive Charges to Develop Unidirectional Forces for Seismic Purposes

    By Richard G. Burdick

    The use of explosive charges for generating seismic energy has been around for a long time. For oil-field work or crustal studies, when the target of interest is many thousands of feet deep, the surfa

    Jan 1, 1981

  • CIM
    Preliminary Findings on the Health and Well-Being of the Long Distance Commuting Workforce in the Australian Resources Industry

    Mineral resource development activities impact the health and well-being of many people, from workers, to families and surrounding communities. In the decade up to 2010, mining revenues increased from

    Aug 1, 2013

  • AIME
    Preliminary Foundation Studies For Raising A Gravity-Arch Dam

    By Karl J. Dreher, Charles C. Hennig, Gregg A. Scott

    INTRODUCTION Theodore Roosevelt Dam is a cyclopean-masonry, gravity-arch dam located on the Salt River northeast of Phoenix, Arizona. Construction of the dam began in 1903 and was completed in 191

    Jan 1, 1982

  • SME
    Preliminary Geology And Molybdenum Deposits At Questa, New Mexico

    By R. W. Leonardson

    Tectonic activity in northern New Mexico during late Oligocene and early Miocene time presaged events which led to the development of molybdenite deposits at Questa. East-northeast directed crustal ex

    Jan 1, 2013

  • SME
    Preliminary Ground Characterization for the Mokelumne Aqueducts Resiliency Project (MARP) Tunnel - NAT2024

    By S. Klein, M. McLeod, S. Gambino, K. Johnson, E. O’Hara

    The Mokelumne Aqueducts Resiliency Project (MARP) involves construction of a 16.5-mile tunnel across the Sacramento-San Joaquin Delta (Delta) to replace the existing surface aqueduct pipelines with mo

    Jun 23, 2024

  • SME
    Preliminary Groundwater Inflow Estimates To A Proposed High-Level Radioactive Waste Repository In Basalt

    By R. Michael Craig

    The flood basalts of the Columbia Plateau in eastern Washington State are under investigation for suitability in siting a deep geologic repository for high-level radioactive waste. To support safety a

    Jan 1, 1986

  • SME
    Preliminary Guidelines For Construction Of Large, Deep Underground Caverns

    By W. G. Pariseau

    Introduction Caverns of 50 m in linear dimension at depths below 2300 m with a life of more than 25 years are proposed for the next generation of water-filled neutrino detectors. Little precedent ex

    Jan 1, 2006

  • CIM
    Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro Stations

    By M. Vaccarini

    In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil

    Aug 1, 2013

  • SME
    Preliminary Indications of Repeatability and Reproducibility of the ASTM 5744-96 Kinetic Test for Drainage pH and Sulfate Release Rate

    By Kim A. Lapakko, William W. III White

    The ASTM standard method D 5744-96 was developed to provide a well-defined kinetic test protocol, conducted under controlled reaction conditions, with the intent of generating reproducible results. Th

    Jan 1, 2000

  • CIM
    Preliminary Investigation for the Development of a Leaching Technology for Gold Extraction from the Buzwagi Copper Sulphide Ores

    By G. Deschênes

    Located in North West Tanzania, Buzwagi is an underground narrow-vein gold mine owned by Barrick Gold. The plant was commissioned in 2000. The reserves are estimated to be more than 25 years. The ore,

    Jan 1, 2012

  • TMS
    Preliminary Investigation Into the Effect of Composite Reinforcement Particle Size on the Sintering of Titanium-Titanium Boride Dual Matrix Composites

    By K. Morsi

    Titanium-titanium boride whisker (TiBw) composites are emerging as strong candidate materials for advanced applications within the automotive, aerospace and defense industries. Although increasing TiB

    Jan 1, 2008

  • TMS
    Preliminary Investigation Of Fluid Mixing Chracteristics In Bath During Side And Top Combined Blowing AOD Refining Process Of Stainless Steel

    By Ji-He Wei

    Keywords: stainless steel, AOD refining, side and top combined blowing, mixing characteristics, water modeling The fluid mixing characteristics in the bath during the side and top combined blowin

    Jan 1, 2005

  • CIM
    Preliminary Investigation of Rockmass Response to Undercut Blasting in a Block Cave Mining System Using VRSV

    "Block caving is the preferred underground mining method to profitably extract massive, low-grade orebodies; however, lack of cave access inhibits understanding the rockmass response to mining, which

    Jan 1, 2016