Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Design and Construction of Intersection in Situ Tunnel Openings in the Murl ProjectThe four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include
Jan 1, 1981
-
The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, LondonBy J. A. Yeats
This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to
Jan 1, 1989
-
The Design and Construction of Multiple Closely Spaced Tunnels in Soft Ground–A Case History of the Mac Storm Tunnel ProjectBy Mohamed A. Younis, Robert J. F. Goodfellow
This paper investigates the design approaches taken and the philosophy employed during the construction of the Metropolitan Airport Commission (MAC) storm tunnels, part of the Phase 4 Segment of the M
Jan 1, 2003
-
The Design and Construction of the Excavation for the Hoppers Crossing Pump WellsBy Nichol R
- PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour
Jan 1, 1987
-
The Design and Construction of the Excavation for the Underground Works at the Rocky Mountain Pumped Storage ProjectBy C. M. Lundell, F. S. Kendorski, R. D. Prager
The criteria for the design of the shaft/tunnel system excavation at the Rocky Mountain Project was to provide a stable opening during and after construction to receive the concrete lining and to mini
Jan 1, 1986
-
The Design And Cost Of A Fragmentation System For In Situ Extraction Of CopperBy A. Aly Selim
A computer model was developed to calculate the fragmentation cost for in situ leaching operations as a function of the blast design and deposit parameters. The model is based on blasting an ore zone
Jan 1, 1977
-
The Design and Development of a Laboratory Scale Solvent Extraction ApparatusBy Brady KT, Pattenden G
A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u
Jan 1, 1984
-
The Design and Development of a Rockcutting Machine for Gold MiningBy J. P. M. Hojem, C. Dimitriou, N. C. Joughin
This paper describes the design and construction of the first experimental underground rockcutting machine from measurements of cutting forces determined in tests on small rock specimens in the worksh
-
The Design and Evaluation of a Large Direct-Contact Ice-Air Cooler for Vaal Reefs Gold MineBy Bluhm S. J, Feio L, Ramsden R
A new mining area at the Vaal Reefs gold mine is to have a shaft. system which will extend to a depth of 4 200 m and will require 130 MW of cooling. A novel feature of the proposed cooling system
Jan 1, 1988
-
The Design And Evaluation Of A Reactor To Contact Resin And PulpBy Gregory Owen Lewis, Mark William Johns
The use of resin-in-pulp (RIP) to recover dissolved metal ions from slurries is receiving increasing attention. A number of engineering aspects have been identified as crucial if a RIP system is to o
Jan 1, 1996
-
The Design and Evaluation of Acid Pickling InhibitorsThe treatment of steels with acid solutions for the removal of oxide products represents possibly the largest outlet for chemicals in steel processing. Organic pickling inhibitors are required to prev
Jan 1, 1980
-
The Design And Formation Of Bored Displacement Piles - A United Kingdom PerspectiveBy David J. Baxter
Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo
Jan 1, 2006
-
The Design And Implementation Of The Field Test Plots At BHP Iron Ore, Mt. Whaleback-A Cover System For An Arid ClimateBy M. Kane, O&apos
BHP Iron Ore initiated research programs in January of 1995 to develop long term plans for decommissioning of the waste rock material at their Mt. Whaleback operation. More than 2 billion tonnes of wa
Jan 1, 1998
-
The design and implementation of the Kibali gold mine off-shaft developmentBy T Peters
The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with
Mar 29, 2023
-
The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)By V. Mathebula
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv
Jan 1, 2004
-
The Design and Installation of a Booster Fan at Tahmoor CollieryBy M Ogle
"Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the
Jun 1, 2012
-
The design and installation of a mine monitoring and control systemBy D. Lauzon, H. de Ruiter
"In 1988a decision was taken to design and install a computerized mine monitoring and control system. This system had to monitor and control all pumping and ventilation underground. The operation of t
Jan 1, 1991
-
The Design and Management of Wide Roadways in Australian Coal MinesBy Rob Thomas
"In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi
Jan 1, 2010
-
The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental LiningBy Christopher Hebert, Michael R. King, Mehdi Ghazi
The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650
Jan 1, 2003
-
The design and operation of a continuous ion exchange demonstration plant for the recovery of uraniumBy M. E. E. Douglas, A. K. Haines, D. I. Nicol, C. M. Olëm, W. M. Craig, G. D. Louw
A description is given of the design of the continuous ion-exchange demonstration plant at Blyvooruitzicht Gold Mine, including details of the process design, the column construction, and the control
Jan 1, 1978