  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • DFI
    The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, London

    By J. A. Yeats

    This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to

    Jan 1, 1989

  • SME
    The Design and Construction of Multiple Closely Spaced Tunnels in Soft Ground–A Case History of the Mac Storm Tunnel Project

    By Mohamed A. Younis, Robert J. F. Goodfellow

    This paper investigates the design approaches taken and the philosophy employed during the construction of the Metropolitan Airport Commission (MAC) storm tunnels, part of the Phase 4 Segment of the M

    Jan 1, 2003

  • AUSIMM
    The Design and Construction of the Excavation for the Hoppers Crossing Pump Wells

    By Nichol R

    - PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour

    Jan 1, 1987

  • SME
    The Design and Construction of the Excavation for the Underground Works at the Rocky Mountain Pumped Storage Project

    By C. M. Lundell, F. S. Kendorski, R. D. Prager

    The criteria for the design of the shaft/tunnel system excavation at the Rocky Mountain Project was to provide a stable opening during and after construction to receive the concrete lining and to mini

    Jan 1, 1986

  • AIME
    The Design And Cost Of A Fragmentation System For In Situ Extraction Of Copper

    By A. Aly Selim

    A computer model was developed to calculate the fragmentation cost for in situ leaching operations as a function of the blast design and deposit parameters. The model is based on blasting an ore zone

    Jan 1, 1977

  • AUSIMM
    The Design and Development of a Laboratory Scale Solvent Extraction Apparatus

    By Brady KT, Pattenden G

    A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u

    Jan 1, 1984

  • SAIMM
    The Design and Development of a Rockcutting Machine for Gold Mining

    By J. P. M. Hojem, C. Dimitriou, N. C. Joughin

    This paper describes the design and construction of the first experimental underground rockcutting machine from measurements of cutting forces determined in tests on small rock specimens in the worksh

  • AUSIMM
    The Design and Evaluation of a Large Direct-Contact Ice-Air Cooler for Vaal Reefs Gold Mine

    By Bluhm S. J, Feio L, Ramsden R

    A new mining area at the Vaal Reefs gold mine is to have a shaft. system which will extend to a depth of 4 200 m and will require 130 MW of cooling. A novel feature of the proposed cooling system

    Jan 1, 1988

  • SME
    The Design And Evaluation Of A Reactor To Contact Resin And Pulp

    By Gregory Owen Lewis, Mark William Johns

    The use of resin-in-pulp (RIP) to recover dissolved metal ions from slurries is receiving increasing attention. A number of engineering aspects have been identified as crucial if a RIP sys­tem is to o

    Jan 1, 1996

  • AUSIMM
    The Design and Evaluation of Acid Pickling Inhibitors

    The treatment of steels with acid solutions for the removal of oxide products represents possibly the largest outlet for chemicals in steel processing. Organic pickling inhibitors are required to prev

    Jan 1, 1980

  • DFI
    The Design And Formation Of Bored Displacement Piles - A United Kingdom Perspective

    By David J. Baxter

    Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo

    Jan 1, 2006

  • SME
    The Design And Implementation Of The Field Test Plots At BHP Iron Ore, Mt. Whaleback-A Cover System For An Arid Climate

    By M. Kane, O&apos

    BHP Iron Ore initiated research programs in January of 1995 to develop long term plans for decommissioning of the waste rock material at their Mt. Whaleback operation. More than 2 billion tonnes of wa

    Jan 1, 1998

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • SAIMM
    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • CIM
    The design and installation of a mine monitoring and control system

    By D. Lauzon, H. de Ruiter

    "In 1988a decision was taken to design and install a computerized mine monitoring and control system. This system had to monitor and control all pumping and ventilation underground. The operation of t

    Jan 1, 1991

  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME
    The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining

    By Christopher Hebert, Michael R. King, Mehdi Ghazi

    The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650

    Jan 1, 2003

  • SAIMM
    The design and operation of a continuous ion exchange demonstration plant for the recovery of uranium

    By M. E. E. Douglas, A. K. Haines, D. I. Nicol, C. M. Olëm, W. M. Craig, G. D. Louw

    A description is given of the design of the continuous ion-exchange demonstration plant at Blyvooruitzicht Gold Mine, including details of the process design, the column construction, and the control

    Jan 1, 1978