Search Documents

Sort by

  • SAIMM
    Improving performance at Rustenburg Base Metals Refiners copper tankhouse: Operational review and embracing fundamentals

    By K. Naidoo, M. Pelser, J. Hagemann, K. C. Sole

    The copper tankhouse at Rustenburg Base Metals Refinery is an essential component of the Anglo American Platinum value chain. The tankhouse uses starter-sheet technology that was adopted in the 1980s,

    Jun 27, 2025

  • SME
    Improving Performance By Drilling And Blasting Of Gold Heap Leach Pads

    By D. J. Turk

    Faced with decreasing production from the gold heap leach operation, Robinson implemented a drilling and blasting program on the leach pads in 1993. This program offset some of the negative effects of

    Jan 1, 1995

  • SME
    Improving Performance Of Dust Controls For Continuous Miners

    Laboratory tests were conducted in a full-scale continuous miner test gallery to evaluate resulting dust levels for changes in face airflow, spray water quantity and pressure, and mining height. The m

    Jan 1, 1994

  • IMPC
    Improving performance of the Gol-E-Gohar iron ore concentration plant thickener

    By S. Banisi, E. Arghavani, Gh. Parsapour, S. Mousavi

    Maximization of water recovery in thickeners is an essential step in the mineral processing industries. The Gol-E-Gohar iorn ore processing plant uses a center pier thickener with a diameter of 38 m a

    Jan 1, 2014

  • IMPC
    Improving Performance of the Sarcheshmeh Copper Complex Cu-Mo Thickener

    By F. Molhem, S. Banisi, H. R. Montazari, E. Arghavani, Gh. R. Biniyaz, Gh. A. Parsapour

    "Water plays a key role in mineral processing plants and to process one ton of ore 2.5 ton water is needed. Thickeners are commonly used for dewatering and recovering water in most processing plants.

    Jan 1, 2018

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • CIM
    Improving productivity and efficiency in the mining industry: tile challenge of the 80s

    By G. R. Tostengard

    "The paper identifies functional areas which frequently can yield significant productivity improvement. Emphasis is placed on the repair and maintenance, material supply and training functions. Succes

    Jan 1, 1983

  • SAIMM
    Improving productivity at an open-pit mine through enhanced short-term mine planning

    By T. J. Otto, G. C. Lindeque

    Productivity is improved by increasing the ratio of output to input. In an operating open-pit mine, improving the productivity of heavy mining equipment (HME) enables the unit cost of production to be

    Nov 1, 2021

  • CIM
    Improving Productivity for Polish Hard Coal Mining

    By M. Turek

    Cost management in the conditions of increasing competition and unforeseen market turbulence constitutes one of the key areas of the enterprise?s activity. In the last two years the demand for hard co

    Aug 1, 2013

  • SME
    Improving Productivity In Thin Seam Continuous Mining Systems Through Management And Technology Changes

    By S. G. Britton

    Thin seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges are increased depending upon the presence of various ext

    Jan 1, 1991

  • SME
    Improving Productivity in Thin-Seam Continuous Mining at Tanoma

    By Scott G. Britton

    Thin-seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges can be further amplified depending on such factors as la

    Jan 1, 1991

  • SME
    Improving Productivity Through Better Blasting Control

    By Richard L. Ash

    Less than optimum production in mining always results when poorly blasted material is provided at loading points. More often than not the cause is due to blasting founds that fail to fully control and

    Jan 1, 1975

  • IMPC
    Improving Profitability, Sustainability and the Overall Operating Efficiency from Mine to Process in Russian Operations

    By I. Yelkin, Erico Tabosa, Alex Jankovic, R. Hayashida, R. Faveere

    "The mining industry faces growing challenges from more complex and lower grade deposits, rising costs, limited energy and water availability, and increasing societal pressure to operate more sustaina

    Jan 1, 2018

  • SME
    Improving Protection against Respirable Dust at an Underground Crusher Booth

    By J. R. Patts, J. P. Rider, J. A. Organiscak, A. B. Cecala

    "The U.S. National Institute for Occupational Safety and Health completed a 15-month study at an underground limestone mine crusher booth that evaluated three research parameters: (1) the effectivenes

    Jan 1, 2018

  • CIM
    Improving Pumping Capacity And Reliability In The Mcclean Lake Leach Circuit

    By J. Aydt, W. McCombe, H. McLaughlin, L. Nightingale-Mercer

    The McClean Lake mill is located approximately 850 kilometers north of Saskatoon, Saskatchewan, Canada and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uranium

    Jan 1, 2020

  • AUSIMM
    Improving Rehabilitation Outcomes using Biocrusts

    By S Doudle

    The Iluka Resources Ltd Jacinth-Ambrosia heavy mineral sand mine (South Australia) is located in an undisturbed semi-arid landscape consisting of sparse trees, shrubs and grasses. The soil interspaces

    Oct 5, 2011

  • SME
    Improving Reliability, Cost & Safety with Fluid Power Systems

    By T. R. Ley

    "RELIABILITY & SAFETY – TOGETHER. REALLY? I was starkly reminded of the challenges facing by the coal industry while talking with a number of senior mining executives. One said to me: “Safety is the #

    Jan 1, 2016

  • TMS
    Improving Resistance Spot Weld Quality Through Statistical Experiments and Digital Process Control

    By Stephen J. Hales

    State-of-the-art Resistance Spot Welding (RSW) equipment has the potential to permit adaptive feedback through recent advances in computerized process control. The initial step toward achieving this g

    Jan 1, 1992

  • CIM
    Improving Rockbolting Efficiency And Performance With The Jumbolt At Cannington Mine

    By Geoffrey C. Streeton

    A continual objective of mine operations is to reduce ground control costs without compromising the overall safety or performance of the installed ground support. Any change in the ground support regi

    May 1, 2001

  • SME
    Improving Roof Bolter Safety - Preprint 09-024

    By A. Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970's. During roof bolting, many injuries have occurred from large pieces of draw rock falling

    Jan 1, 2009