Search Documents

Sort by

  • ABM
    O Estudo Da Remoção Do Co2+, Cu2+ E Ni2+ De Uma Solução Aquosa Pela Resina Quelante Purolite S950 Sob O Efeito Da Variação Do Ph

    By Isadora Dias Perez

    Com a preocupação ambiental, econômica e social perante o descarte de metais oriundos da mineração, busca-se por métodos alternativos e sustentáveis de tratamento e recuperação. Dessa forma, o process

    Oct 30, 2017

  • ABM
    O Uso Do Cromo Duro Na Laminação De Cobre Para Aumento Da Campanha Do Cilindro De Trabalho A Frio

    By Antonio Fabiano de Oliveira

    Estudos de laminação com revestimento de cromo e influência nas propriedades foram realizados com o objetivo de aumentar a produtividade dos cilindros. Para tal, foram utilizados cilindros cromados pa

    Oct 30, 2017

  • CIM
    O'Brien Mine

    By Robert A. Brown

    "The O'Brien mine is in the west-central part of Cadillac township along the Cadillac 'break', which extends for 7,500 feet from west to east across the property.The ground was staked in 1924 by A. Du

    Jan 1, 1954

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • SME
    O-Alkyl-N-Allyl Thionocarbamates: New Oily Collectors For Sulfide Ores

    By M. E. Lewellyn

    A new class of thionocarbamates, O-alkyl-N-allyl thionocarbamate (III), has been found to give better metallurgy than 0-isopropyl-N-ethyl thionocarbamate (I) for a number of sulfide ores containing co

    Jan 1, 1985

  • SME
    O.S.H.A. Standards For Underground Construction - The Contractor's Viewpoint

    By Francis X. McCullough

    After OSHA published a Notice of Proposed Rulemaking on August 5, 1983, to revise its standards for Underground Construction, many contractors and their representative associations became concerned by

    Jan 1, 1985

  • DFI
    Oakland Airport Roadway Project - Synopsis

    By David S. Yang

    The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc

    Jan 1, 2001

  • SME
    Oal-gold Agglomeration -a Novelapproach To Gold Recovery

    By C. F. Bonney

    Spherical or oil agglomeration has been recognised for many years as a possible process for the recovery of mineraVmetal values. BP has investigated the potential of spherical agglomeration for a numb

    Jan 1, 1998

  • AUSIMM
    Objective Geological Logging using Geochemical Multi-Element Data - Plutonic Gold Mine, Western Australia

    By M D. Taylor, G Duclaux, K Atkinson, L A. Fisher, A R. Latham, M F. Gazley, S J. de Beer, C M. Tutt

    Geological logging by mine and exploration geologists involves the application of a logging code that requires a geologist to make a subjective decision to classify a particular rock unit. This will m

    Sep 26, 2013

  • SME
    Objective-Driven Simulation: A New Approach To Improving The Efficiency And Usefulness Of Steady-State Simulators In Mineral Processing Plants

    By J. Villeneuve

    Steady-state simulation has proved to be a very useful aid in designing new plants and optimizing existing ones. The algorithms and data definitions of existing simulators often, however, require a gr

    Jan 1, 1992

  • NIOSH
    Objectives And Constraints Of Through - The-Earth Electromagnetic Communication Systems

    By Howard E. Parkinson

    In 1969, new coal mine health and safety legislation was enacted in the United States. As a result of this legislation, the Department of Interior, Bureau of Mines has carried out communications resea

    Jan 1, 1973

  • AIME
    Objectives of Mineral Education

    By AIME AIME

    MEMBERS of the Engineering Education Committee held two meetings at Joplin preliminary to the opening of the main meeting there. The first was held on Sunday afternoon. It was attended by all who had

    Jan 1, 1931

  • CIM
    Objectives of the Canadian Carbonization Research Association

    By C. W. Drake, J. H. Walsh

    "The Canadian Carbonization Re-search Association was formed during 1965, with seven founding members representing four integrated steel companies, two coal companies and one high-temperature tar proc

    Jan 1, 1967

  • TMS
    Observation and Calculation of Marangoni Convection Induced Thermally in a Molten Salt

    By H. Itou, J. M. Toguri, T. Takasu

    "Marangoni convection has a large effect on materials processing since it remarkably enhances heat and mass transport near a free interface. To have a better understanding of the behavior of Marangoni

    Jan 1, 1997

  • TMS
    Observation and Identification of Dross Phases Precipitated from Lead Bullion

    By Musa Karakus

    In an attempt to explain the phenomena of lead entrainment during Cu drossing of lead bullion, two different synthetic lead bullions were heated to 1050°C, cooled slowly to various temperatures, and t

    Jan 1, 1989

  • SME
    Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel Project

    By B. Caro Vargas

    The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • CIM
    Observation of ore pass system performance at Brunswick mine (56ecacd0-ce74-4364-ac15-e3875a5d4671)

    By R. Harrisson, K. Esmaieli

    Brunswick mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance of ore pass systems at the mine. It presents the range of selected configura

    Jan 1, 2008

  • DFI
    Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation Support

    By Paul J. Sabatini

    Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.

  • DFI
    Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)

    By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey

    "Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility

    Jan 1, 2017

  • CIM
    Observations and Numerical Back Analysis of an Excavation in the Queenston Mudstone

    By M. A. Perras, M. S. Diederichs

    "The Niagara Tunnel Project (NTP) is a 10.1 km long water-diversion tunnel in Niagara Falls, Ontario, which was excavated by a 14.4 m diameter tunnel boring machine. The excavated rock types included

    Jan 1, 2015