Search Documents

Sort by

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • CIM
    Optimisation of Cake Moisture at the Leached Sludge Filter Press

    By P. Belley

    Prior to 2006, the filtration unit for leached sludge treatment (filter press) permitted the filtration, washing and drying of cake to 17% (w/w) moisture. That year saw moisture content abruptly incre

    Jan 1, 2007

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • ABM
    Optimisation Of Cold Rolling Mills

    By J. N. Stevens, M. Tulwin, P. J. Lawlor

    All metals producers are on an unending search for a competitive advantage. They need to produce in the most cost effective way. Sometimes a new mill might be considered but in this paper we present e

    Oct 1, 2019

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailings

    By D J. Williams, S Islam

    Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad

    Jul 23, 2018

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Optimisation of Excavator Performance When Mining Complex Polymetallic Ores

    By U Dzharlkaganov, B Bekmurzayevand M

    The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of

    Jan 1, 2003

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • IMPC
    Optimisation of Grinding Process in a Magnetite Ore Beneficiation Plant

    By M. D. Vilarinho, W. Xuan, F. Vasconcelos Guimarães

    "This article summarises the efforts to reduce the energy consumption in grinding in a magnetite ore beneficiation plant. ArcelorMittal Kryvyi Rih ore beneficiation plant produces magnetite concentrat

    Jan 1, 2018

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • IMPC
    Optimisation of Mill Feed by LIF-Techniques (cbc3fba8-2d89-4297-b837-793bda5fb340)

    By Heribert F. Broicher, Arne Volland

    The application of remote sensing techniques combined with fluorescence spectroscopy is realised in analytical devices called LIF Analysers. The analysis of laser-induced fluorescence facilitates non-

    Jan 1, 2003

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of Cyanicides

    By B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon

    Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The

    Sep 26, 2013

  • TMS
    Optimisation of Pellet Reduction in a Phosphorus Furnace

    By C. Dresen

    This paper discussed the reaction kinetics of the reduction of industrial phosphate pellets for P4 production. In the reduction process of various phosphate ores, the following parameters were investi

    Jan 1, 2002

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021