Search Documents

Sort by

  • AUSIMM
    Optimising Assessment and Selection with Indigenous People in Remote Communities

    By P Davidson

    For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig

    Jan 1, 2006

  • SAIMM
    Optimising blend ratios, grinds, and reagent schemes to recover platinum group metals from lower group reef spiral tailings

    By J. Sehata, J. Tshilongo, I. Govender, S. Pikinini, T. L. Moodley, M. Raedani

    In the face of dwindling Merensky ore reserves in the early 1990s, Mintek developed the MF2 flotation circuit to economically recover platinum group metals from the shallow upper group-2 chromitite re

    Mar 6, 2026

  • AUSIMM
    Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon Scout

    By T D. H McGrath, O Baker, W P. Staunton, C Ypelaan

    "The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir

    Oct 10, 2016

  • CIM
    Optimising Chemical Cost in Fine Coal Flotation at Bhelatand Coal Preparation Plant

    By Atul Bhatnagar, M. P. Sinha, Md Zahid Ahmad, Pallav Garg, Sanjay Kumar Singh, Shashi Ranjan, An Ecolab Company Nalco Water

    "Froth Flotation is undoubtedly one of the most critical processes in coking coal washing plants. This work was carried out at Bhelatand Coal Preparation Plant of Tata Steel was with an objective of c

    Jan 1, 2016

  • CIM
    Optimising Circuit Design for Gravity Gold Recovery

    To determine the optimal circuit configuration for gravity gold recovery consideration should be given to a range of factors in addition to the efficiency of the gravity circuit, including capital cos

    Jan 1, 2011

  • IMPC
    Optimising Flotation Innovations and the Role of Plant Testwork

    Optimising flotation designs and innovations is a complex process involving many parameters, one of which is ensuring sufficient testwork is carried out at plant level before these innovations are lau

    Jan 1, 2014

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • IMPC
    Optimising Froth Stability of Copper Flotation Tailings

    By A. R. Videla, P. R. Brito-Parada, I. Mackay

    "Linking results from laboratory scale experiments to industrial flotation behaviour is challenging. Typically, such experiments involve batch tests in which the system does not operate at steady-stat

    Jan 1, 2018

  • AUSIMM
    Optimising Land for Beneficial Use During and After Mining

    By J Purandare, D Murdoch

    The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev

    Jun 28, 2016

  • AUSIMM
    Optimising Mine Ventilation Through the Use of Life-Cycle Production Models

    By C Kocsis, G Baiden, Y Bissiri

    CANMET-MMSL and Penguin Automation Systems Inc have been exploring how process simulation and ventilation modelling software, when combined, can be used to optimise hard-rock/metal mine ventilation sy

    Jan 1, 2005

  • AUSIMM
    Optimising Mining Data, With Emphasis on Rock Quality Designation, to Improve Groundwater Modelling of Fractured Rock Aquifers, (Pasminco Rosebery Mine, Tasmania)

    By R Willis, D Cooke, G J. Davidson

    Mine-groundwater interaction at the Pasminco Rosebery Mine (PRM), western Tasmania, deserves special attention due to the unique climate and mining environment present. High rainfall and low evapotran

    Jan 1, 2003

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Optimising multivariate variographic analysis with information from multivariate process data modelling (partial least squares regression)

    By L O. Filippov, Q Dehaine

    Variographic analysis, a classical tool from the Theory of Sampling (TOS), can address practical situations with multiple variables; however, its application has very often been limited to one variabl

    May 9, 2017

  • AUSIMM
    Optimising Project Value and Robustness

    By W Stange, N Hanson

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • CIM
    Optimising the Management of CIP/CIL Circuits

    By K. Barbetti

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe

    Jan 1, 2017

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018

  • CIM
    Optimising the Operation of Paste Thickening at the Yara Siilinjärvi Plant (8a3674cf-2785-43be-b17f-05be124f63bf)

    "Yara Siilinjärvi in Finland is the Western Europe's only apatite mine. Annually it produces one million tons of apatite concentrate, which creates 10 million tons of tailings. At the beginning of 201

    Jan 1, 2019

  • AUSIMM
    Optimising the Production Chain from Resource to Product

    By P Cameron

    Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are a

    Jan 1, 2002