Search Documents

Sort by

  • SAIMM
    Optimising the ramp design in an open pit mine APCOM 2021

    By I. Kaabachi, F. Meunier, N. Morales

    In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp

    Sep 1, 2021

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • IIMP
    Optimización del proceso de voladura con el empleo de fotogrametría 3D en una cantera del sur de Brasil

    La voladura es la herramienta económica más efectiva para fragmentar y mover rocas. Sin embargo, no puede ser empleado cuando un patron de voladura mal diseñado, ya que se genera un descontrol sobre l

    Apr 1, 2013

  • AUSIMM
    Optimization and Control of Laboratory Sulphidization of Oxidized Copper Ores with an Ion Selective Electrode

    By Woodcock J. T

    A sulphide ion selective electrode (ISE) is suitable for control of sodium sulphide additions in flotation because it has a rapid response to changeS in S2- concentrations, can indicate -low concentra

    Jan 1, 1978

  • TMS
    Optimization And Management Of Byproduct Gas Distribution In Steel Mills Under Time-Of-Use (Tou) Electricity Price

    By Xiancong Zhao, Hao Bai, Qi Shi, Zhancheng Guo

    Reducing electricity cost is important for energy intensive industries such as the iron and steel industry. With the implementation of time-of-use (TOU) electricity price, plenty of attention has been

    Jan 1, 2016

  • IMPC
    Optimization And Modeling On Acidic Leaching Of Low Grade Copper Oxide Ore Using D-Optimal

    By D. Moradkhani

    Copper metal has important role in the basic industrials, as if it did not exist, modern human life would not develop! Copper leaching, as the first step, is important step in copper production proces

    Sep 1, 2012

  • ISEE
    Optimization and Precision in Mining, The Simfrag Model

    By Jorge Cárdenas, Alejandro Luna

    In mining simulation for fragmentation results prediction is of utmost importance to study feasibility, ensure safety, and estimate the correct use of resources in drilling an explosive to meet requir

    Jan 21, 2025

  • SME
    Optimization Of A Flotation Mill

    By Ronald J. Roman

    A mathematical model was developed for the grinding and flotation section of Union Carbide's Bishop mill and this model was used to indicate how variations in grind, retention time, and calcite a

    Jan 1, 1969

  • SME
    Optimization Of A Thickener Performance

    By A. Ghalambor

    The objective of this investigation was to determine the sensitivity of three selected input parameters in the operational control of continuous bottom-fed thickeners used for the treatment of coal re

    Jan 1, 1989

  • TMS
    Optimization of a Tin-Lead-Smelting Furnace with the Aid of Statistical Modelling Techniques

    By S. C. Grund

    In secondary copper smelting as it is performed at Hüttenwerke Kayser plant in Lünen, tin-and lead-containing flue dusts are produced as intermediate products. These flue dusts are further processed i

    Jan 1, 1999

  • CIM
    Optimization of Acid Addition in High Pressure Acid Leaching at Ambatovy

    By R. Holmwood, M. Faris, P. Holloway, M. Collins

    Sulphuric acid addition is a major driver of the economics in the processing of nickel laterite ores by high pressure acid leaching (HPAL). Understanding the optimal acid addition rate is essential fo

    Jan 1, 2017

  • CIM
    Optimization of Acid Consumption for Copper Heap Leaching

    By Anand Raman, Steve Dixon

    "Industry practice for defining acid consumption is based on column tests. Freeport-McMoRan (FCX) has adopted a practice of leach operation using a defined pH or gpl acid in the raffinate based on the

    Jan 1, 2008

  • SME
    Optimization of Air-Injection Spargers for Column Flotation Applications

    By V. Ramirez, M. Mankosa, G. Luttrell, E. Wasmund

    "The performance of column flotation is strongly influenced by the effectiveness of the gas sparging system. Unfortunately, field studies suggest that gas injector systems used for column sparging are

    Jan 1, 2016

  • SME
    Optimization of Airflow Distribution in Mine Ventilation Networks Using the Modified Sooty Tern Optimization Algorithm - Mining, Metallurgy & Exploration (2024)

    By Lixue Wen, Jun Xiao, Dongping Shi, Yan Xue, Jinmiao Wang

    Mine ventilation energy consumption is one of the main sources of energy consumption in mining production, accounting for about one-third to one-half of the total energy consumption. Therefore, reduci

    Dec 20, 2023

  • SME
    Optimization Of An Iron Ore Flotation System

    By M. E. Volin

    Reagent control for optimum concentrate yield was studied by laboratory batch flotation tests simulating the Groveland plant flotation circuit in which a rougher concentrate is cleaned twice. The reag

    Jan 1, 1965

  • IMPC
    Optimization of ball mill and magnetic separators at 4th Iron ore production plant in Golgohar mining and industrial company

    By M. Amani, A. Akbarinasab, M. Bazmandeh

    The fourth iron ore production plant at Golgohar mining and industrial company consists a ball mill and wet medium intensity magnetic separators (3500 Guss). The ball mill product applies directly int

    Jan 1, 2014

  • ISEE
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b

    Feb 6, 2023