Search Documents

Sort by

  • SME
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation - Mining, Metallurgy & Exploration (2024)

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is the most popular and practiced mining method in underground hard rock mines. Proper planning and its execution is the key requirement for stope extraction using this method. The st

    Dec 22, 2023

  • ISEE
    Optimization of Blast Evacuation Zones using the "Exclusion Zone" Module

    By C. Morel, P. Fredes, L. Rojas

    This article presents a comprehensive study on the development and application of the specific module called "Exclusion Zone" created by Orica to determine blast evacuation exclusion zones. This modul

    Jan 1, 2024

  • SME
    Optimization Of Block Height At The Luossavaara Mine ? Introduction

    By Dan Nilsson

    The Luossavaara "Research Mine" is the First large, offensive effort in mining research conducted by the Swedish state. Over a 5-year period, 1981-1985, the Swedish Mining Research Foundation works in

    Jan 1, 1985

  • SME
    Optimization of Borehole Layout in Upwards Medium‑Deep Hole Cut Blasting - Mining, Metallurgy & Exploration (2023)

    By Xianyang Qiu, Xiuzhi Shi, Chen Xie, Xiaofeng Huo, Yanhai Wang

    In upwards medium-deep hole cut blasting, many confinement effects exist due to the small number of free surfaces, which is mainly provided by an empty hole. If the cut blasting effect cannot meet exp

    Sep 7, 2023

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • SME
    Optimization of Cable Bolting Strategies at a Canadian Underground Mine

    By Efstratios Karampinos, John Hadjigeorgiou, Philippe Morissette

    "Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explore ground supp

    Jan 4, 2018

  • SME
    Optimization of Cable Bolting Strategies at an Underground Mine

    By E. Karampinos, P. Morissette

    "INTRODUCTION Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explor

    Jan 1, 2018

  • CIM
    Optimization of Cemented Rockfill Practices for Sublevel Stoping Mining System

    By Muhammad Zaka Emad

    ABSTRACT: Sublevel stoping mining methods with delayed backfill employs cemented rockfill (CRF) as a backfill material. It is used in underground mines to achieve ground control and reduce wall slough

    May 1, 2013

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • SME
    Optimization Of Coal Mine Ventilation Systems

    By G Luxbacher

    Computer simulation of mine ventilation systems is rapidly becoming an essential tool in mine planning and design. This paper examines the utilization of ventilation simulation techniques to evaluate

    Jan 1, 1977

  • TMS
    Optimization of Coke Rate and Sinter Quality by Genetic Algorithm for Two-Layer Sintering of Iron Ore

    By Niloy K. Nath

    Two layer sintering by charging green sinter mix with normal coke rate in the upper layer and reduced coke rate in the lower layer, can substantially reduce the coke rate and also improve the sinter q

    Jan 1, 2003

  • SAIMM
    Optimization of Conditions for the Preparation of Activated Carbon from Olive Stones for Application in Gold Recovery

    By M. Louarrat, G. Enaime, A. Yaacoubi, A. Baçaoui, J. Blin

    "The purpose of this study is to prepare a new activated carbon from olive stones for use in gold recovery by carbon-in-leach (CIL) and carbon-inpulp (CIP). The preparation method chosen was physical

    Mar 1, 2019

  • TMS
    Optimization of Continuous Slag/Matte Separation in Mitsubishi Process by Using Numerical Heat and Fluid Flow Analysis

    By Akira Kaneda, Nozomu Hasegawa

    "In the Mitsubishi Continuous Copper Smelting and Converting Process, slag/matte mixture overflowed from the smelting furnace is separated continuously in an electric furnace (slag cleaning furnace, C

    Jan 1, 2000

  • SME
    Optimization of Costs for Trackless Mining Ventilation and Cooling Systems

    By C. A. Rawlins, P. Rostami

    "Ventilation systems are not only an integral part of any underground mine design but are a significant contributor to the mine’s capital and operating costs. The ventilation and cooling design system

    Jan 1, 2015

  • SAIMM
    Optimization of Cut-Off Grades Considering Grade Uncertainty in Narrow, Tabular Gold Deposits

    By C. Birch

    "Mineral reserve statements as well as optimizing mine planning require a block model with grades for each mining block. A cut-off grade is determined by considering the mining costs as well as the ex

    Jan 1, 2017

  • SAIMM
    Optimization Of Diesel Usage At Uitvlugt Mine - Synopsis

    By O. G. Motlogelwa

    Any company operating a fleet of trucks will be greatly advantaged if the associated fuel costs can be decreased. The optimal tonnage that trucks should be hauling to ensure minimum consumption of die

    Jan 1, 2013

  • SME
    Optimization Of Dispatching Criteria For Open-Pit Truck Haulage System Design Using Multiple Comparisons With The Best And Common Random Numbers (49716460-0398-4e41-bf3c-d300203bdff4)

    By B. Kolonja

    This paper considers simulation of truck dispatching system designs using maximum expected production of the truck-shovel system as the measure of performance. Two methods are utilized, multiple compa

    Jan 1, 1994

  • DFI
    Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test Results

    By John C. Niedzielski

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017