Search Documents

Sort by

  • AUSIMM
    Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, Australia

    By L Bertoss, D Carvalho

    In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil

    May 24, 2023

  • SME
    Overcoming Preconceptions For A Successful launch Of Autonomous Haulage

    By James Humphrey

    There is a natural resistance to change in any form. When it comes to implementing a game-changing technology like autonomous haulage on an operating mine site, the resistance can at times appear insu

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • TMS
    Overcoming The Challenges Of Plantwide Control

    By John A. Herbst

    Plantwide control of mineral processing operations has long been sought for its potential benefits. These benefits include minute-to-minute optimization, reacting to disturbances in ore characteristic

    Jan 1, 1996

  • TMS
    Overcoming the Challenges of Plantwide Control (1c61443a-08dc-4d11-b2ac-b217ab4e12e7)

    By John A. Herbst, William T. Pate

    "Plantwide control of mineral processing operations has long been sought for its potential benefits. These benefits include minute-to-minute optimization, reacting to disturbances in ore characteristi

    Jan 1, 1996

  • ABM
    Overcoming The Conflict Between Long Bof Refractory Lifetime And Efficient Bottom Stirring: A Case Study At Meishan Steel In China

    By Rainer Hüsken

    Over the last decades long BOF campaign lives have successfully been established due to improved quality of the refractory material and due to intensive use of slag splashing. On the other hand, steel

    Jul 30, 2018

  • CIM
    Overcoming the Geotechnical Challenges of Drift Development at the Unconformity in the Athabasca Basin

    By Theophile Yameogo

    The rock mechanics literature has documented the challenges, failures and successes of tunneling through weak rocks. Cases usually deal with low RMR rock masses or high stresses in a fractured zone. W

    Aug 1, 2010

  • SAIMM
    Overcoming The Limitations Of The Use Of Corrosion/ Temperature Tables In Designing For Transport Applications

    By A E. Paterson

    General aluminium corrosion charts based on 1100 alloy listing product and temperature have been developed by AFSA, mainly from available sources. The categories of corrosion expectation are fairly

    Jan 1, 2006

  • SME
    Overcoming Underground Mining Space Constraints

    When most people think of coal mining, they envision men in soot-covered clothes and hard hats digging at deposits in deep underground caverns. These mental images commonly include coal cars rumbling

  • CIM
    Overdrilling of Open-Pit Blast Holes

    By A. Galibois, H. Monette, J. L. Collins

    This paper deals with the problem of caving, which occurs in varying degrees in blast holes before loading. It is shown that the distribution of the amount of caving in materials may be described by a

    Jan 1, 1971

  • SME
    Overestimation Of Acid Generating Potential (AGP) In Alunite-Bearing Waste Rock

    By A. S. Hall

    Significant pyrite often does not dissolve in the Sobek (1978) nitric acid extraction; therefore, the standard conservative approach is to estimate pyrite using sulfur present in the sum of the nitric

    Jan 1, 1999

  • SME
    Overexcavation Risk Management During Pressurized Face Tunneling in the Pacific Northwest - RETC2023

    By Ulf Georg Gwildis

    Overexcavation and ground loss events during pressurized-face TBMadvance in soft ground can result in unplanned deformations above the tunnel and damage to existing infrastructure. Successfully managi

    Jun 13, 2023

  • SME
    Overflow Ball Mill Sizing: A Shared-Time Computer Program ? Introduction

    By Duncan M. Lamb

    Commercial computer "time-sharing" is a new and powerful tool for the engineer. It is a system of virtually simultaneous use of a digital computer by several individuals. Access to the computer is by

    Jan 1, 1969

  • AIME
    Overflow Crowd at Coal Division Sessions Takes Part in Lively Discussions

    By D. R. Mitchell

    MEETING for the thirteenth time in New York as part of the five-ring circus known as the Annual Meeting A.I.M.E., the Coal Division experienced a wartime boom in attendance. Technical sessions were cr

    Jan 1, 1943

  • CIM
    Overhead Protection Systems (OPS): Some Recent Applications

    By M. C. Walton, W. Roelofs

    ABSTRACT: In most cases, a refractory repair involves dealing with used refractory linings above shoulder height, defining these as overhead refractories. This paper details a method of personnel prot

    Jan 1, 2012

  • CIM
    Overland conveyor systems

    By Donald C. Craighead

    "Overland conveyor systems to transport bulk materials from mines to processing plants or load-out stations have to be seriously considered as the viable alternative to truck and train haulage systems

    Jan 1, 1982

  • ISEE
    Overlapping Timing Analysis for a Single Blast Hole

    By Joshua Micah Hoffman, Lifeng Li, Jhon Silva-Castro

    Since millisecond detonators were first introduced, at least two variables among others have been more closely considered when timing a mining blast; the accuracy and the precision of the initiation s

    Jan 1, 2015

  • SAIMM
    Overmining low factor of safety coal pillars using an enhanced monitoring system

    By W. J. van Wyk, W. I. Mahne, G. Priest, C. du Toit, W. A. Liebenberg

    Prior to the Coalbrook disaster in 1960, bord-and-pillar mining of the number two seam in the Witbank coalfields often resulted in small pillars with low factors of safety. At the Goedehoop Colliery,

    May 8, 2026

  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • SME
    Overseas Private Investment Corporation Minerals Program

    By Richard H. Lindgren

    I appreciate this opportunity to discuss with you OPIC's new policies designed to assist U.S. minerals companies in developing new sources of minerals overseas. A comparison of recent figures on

    Jan 1, 1978