Search Documents

Sort by

  • CIM
    Pre-Reduction of Blast Furnace Burdens Using the S-L Process

    By F J. Pearce

    The Steel Company of Canada, utilizing the S-L process, has produced partially and highly reduced pellets for use in the blast furnace. Experimental blast furnace tests, using reduced pellet burdens,

    Jan 1, 1964

  • AIME
    Pre-Reinforcement by Cable Bolting at Outokumpu Oy Mines

    By Juhani Pulkkinen, Pekka Lappalainen

    Preplaced cable bolts - fully grouted old hoisting cables or stress relieved steel strands - have been used succesfully to pre- reinforce ore contact zones and pillars in sublevel stoping at Outo- kum

    Jan 1, 1983

  • AUSIMM
    Pre-Set Delay Electronic Detonators: Merits Opposite Programmable Systems

    By C Robertson, J Campos

    The South African mining industry first experienced en-masse use of electronic detonators in the Narrow Reef environment using AELÆs ElectrodetÖ pre-set delay system. In recent years, programmable sys

    Jan 1, 2001

  • AIME
    Pre-Show Report: 1979 SME-AIME Fall Meeting and Exhibit

    SME-AIME Fall Meeting and Exhibit

    Jan 9, 1979

  • SME
    Pre-Split Blasting Research - Introduction

    By Adrian J. Mathias

    For many years excavations were made in rock exclusively by conventional blasting methods, and without concern for damage to the rock surfaces which remained after the excavation was completed. Recent

    Jan 1, 1965

  • SME
    Pre-Split Blasting: Theory And Practice

    By Calvin J. Konya

    An investigation was performed to determine conditions which optimize fracture formation between blastholes used for purposes of pre-splitting. Experiments-involved high-speed photography in Plexiglas

    Jan 1, 1980

  • ISEE
    Pre-Splitting With The New AIRDEK Technique

    By David G. Borg, John Bussey

    The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application

    Jan 1, 1988

  • AUSIMM
    Pre-Strip-Mining by Bucket Wheel Excavators

    Dragline performance drops considerably when chop-down and double handling of material is needed due to increasing overburden thick- ness or total pit depth. Beyond a certain pit depth the dragline

    Jan 1, 1981

  • IMPC
    Pre-Treated Seawater with Sodium Hydroxide and Carbon Dioxide to Improve Chalcopyrite Floatability with High Kaoline Presence

    By L. A. Cisternas, R. I. Jeldres, C. Cruz, P. A. Robles

    "Previous studies have shown that the floatability of chalcopyrite in seawater at highly alkaline conditions is significantly affected by the presence of clays. The reason is that the species of calci

    Jan 1, 2018

  • SAIMM
    Pre-treatment investigation of lithium bearing granite ore using high voltage electric pulse, L.O. Filippov, S.K.Tripathy, I. Filippova, and F. Diot

    By F. Diot, S. K. Tripathy, L. O. Filippov, I. Filippova

    Among different pre-treatment methods, a high voltage electric pulse was recently developed and is gaining popularity due to multi-benefits such as pre-weakening along the grain boundaries, as well as

    Jan 1, 2020

  • ISEE
    Preblast Surveys and a Look at Today's Seismographs: A General Look

    By Randall M. Wheeler

    Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a

    Jan 1, 1992

  • SME
    Precalculation Of Subsidences Over Longwall Panels In The Northern Appalachian Coal Field

    By V. Adamek

    The specific lithological conditions over the Pittsburgh coalbed, highly resistive limestone and sandstone units with relatively shallow overburden, prevent the use of any predictive method as develop

    Jan 1, 1985

  • SME
    Precambrian Shield Gold Exploration Trends Detailed

    By James W. Stewart, A. C. Colvine

    Introduction Precambrian shield terrains the world over are experiencing an unprecedented level of concerted exploration for lode gold deposits. Reasons for this include: • The increase in the price

    Jan 12, 1984

  • SME
    Precast Concrete Segmental Linings - Practical Considerations

    By Henry R. Tiedemann, William H. Hansmire, Harvey W. Parker

    Although the use of precast concrete segments for tunnel linings has been common for many years in Europe, acceptance of this type of lining has been slow in the United States. This paper explores the

    Jan 1, 1987

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AIME
    Precautions That Must Be Observed In Parting With Aqua Fortis.

    IN order that you may be expert in every phase of this art of parting, I wish to caution you upon twelve points, all necessary, so that you may know beforehand what may happen to you and what provisio

    Jan 1, 1942

  • AUSIMM
    Precharging in previously preconditioned ground

    By E Hawkins, S Sheldon

    Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi

    Mar 15, 2021

  • AUSIMM
    Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting Systems

    By B Crowdey, J Wall

    The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react

    Mar 24, 2014

  • AIME
    Precious and Semiprecious Stones in Industry

    By Sydney H. Ball

    AMERICAN consumption of industrial diamonds has increased five fold in the past 25 years and today accounts for 15 to 20 percent of the world's sale of rough diamonds. In another decade the value

    Jan 1, 1941

  • SME
    Precious Metal Deposits Of The Refugio Area, Northern Chile

    By R. Flores V.

    The Refugio Project is located in the Andes mountains of northern Chile, in the Maricunga Hineral Belt. The Verde, Pancho and Guanaco Au ore bodies have been recognized and are Early Miocene in age. M

    Jan 1, 1994