Search Documents

Sort by

  • AUSIMM
    Predicting Iron Ore Losses and Dilution Factors Using Conditional Simulations

    By D Roldpo, M Vidigal, J F. C L Costa

    The local cumulative distribution function (lcdf) of a selective mine unit (SMU) can be estimated by conditional simulations using the statistics derived from the sample points, generating multiple eq

    Jan 1, 2009

  • CIM
    Predicting Locked Cycle Flotation Test Results from Batch Data

    By G. E. Agar

    This paper deals with the prediction of locked cycle flotation results from data developed from individual batch tests. A postulate is made that the distribution of material in a separation stage is d

    Jan 1, 1978

  • SME
    Predicting Long-Term Seepage From Waste-Rock Facilities In Dry Climates

    By D. A. Swanson

    Predicting when and at what rate seepage will occur from waste-rock facilities is becoming an integral part of permitting and closure at mines situated in dry climates. Such predictions require develo

    Jan 1, 1998

  • AUSIMM
    Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head Grade

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled

    Jan 1, 2009

  • SME
    Predicting Metal Prices From A State-Space Analysis Of The Economy

    By J. Hilgers

    Metal prices are often predicted by relying on time trend projections of various economic indicators or even the trend in price itself Thus, time is the underlying explanatory variable acting through

    Jan 1, 1995

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • SME
    Predicting Mine-Wide Seismogenic Hazard with Confidence Using Calibrated Numerical Models - RASIM 2022

    By Kathy Kalenchuk

    To develop strategic and tactical strategies to manage seismic hazard in a safe and economic manner, it is necessary to understand the spatial and temporal distribution of mine wide seismogenic behavi

    Apr 26, 2022

  • CIM
    Predicting Misruns in LPPM Casting of Light Metal Parts (Aluminum A356 and Magnesium AZ91E)

    By F. Chiesa

    Experimental results on thin and thick castings poured in aluminum A356 and magnesium AZ91E by the low pressure permanent mold process have been compared to the result of filling simulations for thin

    Jan 1, 2011

  • SAIMM
    Predicting open stope performance at an octree resolution using multivariate models

    By K. Woodward, Y. Potvin, B. McFadyen, M. Grenon

    Open stoping has become a popular mining method in hard rock mines, not only due to the safety of the method as a non-entry approach, but also because of the high extraction rate and low costs. At min

    Jun 5, 2023

  • SME
    Predicting Oxygen Run-Out Times Of Self-Contained Self-Rescuers

    The recent mine disasters in Australian coal mines have initiated an introduction of Self-Contained Self-Rescuer (SCSR) as component in the development of new escape strategies for miners. These self-

    Jan 1, 1997

  • CIM
    Predicting Patterns of Slurry Flow within and Discharge from a 3D Pilot SAG Mill

    Slurry flow, including flow through the charge, through the discharge grates, along the pulp lifters and its discharge from the mill is an important contributor to the efficiency of the grinding proce

    Jan 1, 2012

  • NIOSH
    Predicting Probable Roof Fall Areas In Advance Of Mining By Geological Analysis

    By W. K. Overbey

    Surface fracture trace density, changes in roof rock type, and topographic unloading due to drainage were mapped for the mining areas located in the Blacksville-Osage, W. Va., quadrangles to investiga

    Jan 1, 1973

  • SAIMM
    Predicting rock fragmentation based on drill monitoring: A case study from Malmberget mine, Sweden

    By H. Schunnesson, H. Fredriksson, D. Johansson, E. Söderström, S. Manzoor, A. Gustafson, M. Danielsson

    Fragmentation analysis is an essential part of the optimization process in any mining operation. The costs of loading, hauling, and crushing the rock are strongly influenced by the size distribution o

    Mar 2, 2022

  • ISEE
    Predicting Rotary Drill Performance

    By George P. Jr Schivley

    Looking at the process of drilling rock from the standpoint of the power required, yields an equation that relates Force-on-the-Bit; Torque, to rotate the bit; and bit Angular Speed to the Penetration

    Jan 1, 1994

  • SME
    Predicting Run-Of-Mine Ore Grades For Large-Scale Sublevel Caving At LKAB's Kiruna Mine

    By M. E. Kuchta

    LKAB's Kiruna mine, located above the Arctic Circle in northern Sweden, is one of the world's largest underground mines, and it is one of the most modern. The Kiruna orebody is a high-grade

    Jan 1, 2003

  • SME
    Predicting Size Distributions of Pulverized Coal

    By L. G. Austin, R. S. C. Rogers

    INTRODUCTION Coal is geologically a sedimentary rock with distinct bedding planes containing a mixture of petrographic constituents. Yet. because of its chemical nature, it also has some of the ch

    Jan 1, 1988

  • SME
    Predicting Spontaneous Heating in Coal Mine Pillars

    By Robert J. Timko, Lincoln Derick

    This work is a follow-up to previous research that attempted to predict the location of spontaneous heating episodes in underground coal mine pillars. The objective of the original work was to see if

    Jan 1, 1995

  • SAIMM
    Predicting standard threshold shifts for occupational hearing loss among miners at a large-scale platinum minen in South Africa

    By L. Ntlhakana, K. Khoza-Shangase, G. Nelson, I. Maposa

    Occupational noise-induced hearing loss (ONIHL) is associated with various risk factors in South African mines. We investigated the association between standard threshold shifts (STSs) and exposure to

    Aug 1, 2021

  • NIOSH
    Predicting System Interactions in the Design Process ? Introduction

    By Lisa Steiner

    Almost every process has a predecessor, and studying the predecessor helps to define needs and shortcomings to be addressed in the new design. It also suggests what information is needed by the users

    Jan 1, 2005

  • AUSIMM
    Predicting the Benefit of Gravity Recovery Prior to Flotation

    Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit

    Aug 1, 2010