Search Documents

Sort by

  • NIOSH
    Processing The Plastics From Urban Refuse

    By J. L. Holman

    In conjunction with its research program on separation, recovery, and recycling of metal, mineral, and energy-based materials in urban refuse, the U.S. Bureau of Mines is developing means to reuse and

    Jan 1, 1972

  • IMPC
    Processing Ultramafic Low-grade Nickel Ores by Desliming-flotation

    By Z. F. Dai

    The Thompson Nickel Belt, located in Northern Manitoba, Canada, contains more than 400 million tonnes of ultramafic low-grade nickel mineralization in 9 deposits. One of these, the Pipe deposit, was m

    Jan 1, 2014

  • TMS
    Processing Unpretreated Dirty Aluminum Waste In An Environmentally Friendly Furnace

    By J. S. Becker

    Technology developed and first implemented in the United Kingdom enables very low grade aluminum scraps containing oils, organics, plastics and ferrous metals to be directly charged, without pretreatm

    Jan 1, 1996

  • CIM
    Prochem's NITROX process

    By K. J. Fair, G. Van Weert, J. E. Schneider

    "IntroductionCyanidation is the principal process for extracting gold from ores . Many primary gold ores, however, are partially or totally refractory in the conventional cyanidation process.Considera

    Jan 1, 1986

  • SME
    Procurement, Program Management, Risk, and Financing of Underground Projects: Changing the Paradigm

    By William W. Edgerton, Moussa Wone, David H. Corkum, Carlton M. Ray

    "The DC Clean Rivers (DCCR) Project is a 25 year, $2.6 Billion court ordered project to reduce combined sewer overflows (CSOs) discharging into the Potomac and Anacostia Rivers and Rock Creek, and als

    Jan 1, 2016

  • AUSIMM
    Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising Value

    By G M. Taylor

    The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past

    Sep 17, 2014

  • AIME
    Producing - Equipment, Methods and Materials - A Computer Study of Horizontal Fracture Treatment Design

    By J. L. Huitt, B. B. McGlothlin, D. K. Lowe

    Published correlations for the principal aspects of hydraulic fracturing were combined into a digital computer program to facilitate the study of interrelated variables. The computer program includes

  • AIME
    Producing - Equipment, Methods and Materials - A Study of Induced Fracturing Using an Instrumental Approach

    By T. O. Anderson, E. J. Stahl

    Tests to increase knowledge concerning the process of hydraulic fracturing have been performed on three wells in the Allegheny field in western New York. The fracture orientation and its physical appe

  • AIME
    Producing - Equipment, Methods and Materials - An Analytical Description of Liquid Slug Flow in Small-Diameter Vertical Conduits

    By K. E. Brown, J. P. Brill, T. C. Doerr

    A wide range of intermittent gas-lift tests way conducted in a 1,500-ft experimental well through 11/4- and 11/2-in, nominal size tubing. The well was equipped with two gas-lift valves, four Maihak el

  • AIME
    Producing - Equipment, Methods and Materials - Behavior of Casing Subjected to Salt Loading

    By J. B. Cheatham, J. W. McEver

    A laboratory investigation of the behavior of casing subjected to salt loading indicates that it is not economically feasible to design casing for the most severe situations of nonuniform loading. Whe

    Jan 1, 1965

  • AIME
    Producing - Equipment, Methods and Materials - Cementing Geothermal Steam Wells

    By G. W. Ostroot, S. Shryock

    Cementing deep, high-temperature oil wells where static temperatures range from 350 to 400F has become routine in the part decade. In the United States there were 271 wells drilled deeper than 15,000

    Jan 1, 1965

  • AIME
    Producing - Equipment, Methods and Materials - Computer Calculations of Pressure and Temperature Effects on Length of Tubular Goods During Deep Well Stimulation

    By B. G. Matson, M. A. Whitfield, G. R. Dysart

    This paper describes the development of u computer program to calculate changes that occur in the length of tubular goods due to temperature and pressure changes during stimulation operations. Due to

  • AIME
    Producing - Equipment, Methods and Materials - Displacement Mechanics in Primary Cementing

    By W. W. Whitaker, C. W. Manry, R. H. McLean

    In an eccentric annulus, cement may favor the widest side and bypass slower-moving mud in the narrowest side. Tendency of the cement to bypass mud is a function of the geometry of the annulus, the den

  • AIME
    Producing - Equipment, Methods and Materials - Effect of Isolated Vertical Fractures Existing in the Reservoir on Fluid Displacement Response

    By J. W. Givens, P. B. Crawford

    A potentiometric model study has been made of the effect of vertical fractures existing in the matrix of the reservoir on the flooding or cycling performance. Fractures can have unusual flow character

    Jan 1, 1967

  • AIME
    Producing - Equipment, Methods and Materials - Evaluation of a Stabilizer Charged Gas Lift Valve for Multiple-Phase Flow Using Graphical Techniques: Discussion I

    By E. P. Whittemore

    Experience with the ASC multipoint gas lift system was obtained in Colonia zone of the West Montalvo field near Oxnard, Calif. The wells in this pool produce from depths varying from 10,500 to 12,000

    Jan 1, 1965

  • AIME
    Producing - Equipment, Methods and Materials - Evaluation of a Stabilizer Charged Gas Lift Valve for Multiple-Phase Flow Using Graphical Techniques: Discussion II

    By G. W. White

    Over the past several years, the steady progress of gas lift from a mysterious art into a developing science has been traceable through the many fine papers that have appeared in Journal of Petroleum

    Jan 1, 1965

  • AIME
    Producing - Equipment, Methods and Materials - Laboratory Study of Rock Softening and Means of Prevention During Steam or Hot Water Injection

    By J. L. Huitt, B. B. McGlothlin, J. J. Day

    Laboratory tests were made with pure minerals and actual reservoir rock samples to study the effects of hydrothermal (steam m hot water) treatments on reservoir rock properties. These tests showed tha

  • AIME
    Producing - Equipment, Methods and Materials - Productivity of Wells in Vertically Fractured, Damaged Formations

    By L. R. Raymond, G. G. Binder

    One primary purpose of hydraulic fracturing as a well stimulation technique is to overcome formation damage. The literature provides ways of designing fracture treatments and evaluating their results

  • AIME
    Producing - Equipment, Methods and Materials - Relation of Formation Rock Strength to Propping Agent Strength in Hydraulic Fracturing

    By J. L. Huitt, B. B. McGlothlin

    The introduction of new fracture propping agents that are brittle but much stronger than sand created the problem of what loading strength is required for a propping agent to be effective in a given f

    Jan 1, 1967

  • AIME
    Producing - Equipment, Methods and Materials - The Effect of Liquid Viscosity in Two-Phase Vertical Flow

    By K. E. Brown, A. R. Hagedorn

    Continuous, two phase flow tests have been conducted during which four liquids of widely differing viscosities were produced by means of air-lift through 1%-in. tubing in a 1,500-ft. experimental well

    Jan 1, 1965