Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tomorrow's Competency RequirementsThe undeniable fact of life in the next 25 years will be the increasing difficulty of the physical conditions of Australian orebodies facing future miners. We are all familiar with names such as the
Jan 1, 1994
-
Tomorrow's MetalsBy Pual M. Tyler
BLIZKRIEG tactics in the present war have consumed metals on such a profligate scale that some of the best-laid procurement plans for civilian and military needs of even a year ago seem in retrospect
Jan 1, 1942
-
Tomorrow's Mining, Its Methods and ToolsBy Augustus Locke
THE technical sessions at the Regional Meeting of the A.I.M.E. in San Francisco are to be de- voted LO changes, current or predictable, which may be expected to alter today's practices in mining
Jan 1, 1939
-
Tonnage Factor – A Matter of Some GravityBy I. S. Parrish
One of the most common errors uncovered while performing a reserve, or resource, audit is not in the geological modeling or grade problems due to poor sampling, prepartion or assaying. The error most
Jan 1, 1993
-
Tonnage Oxygen At Inco's Copper Cliff Smelter: S02 Abatement Energy Conservation And :ProductivityBy C. A. Landolt
Inco pioneered the use of tonnage oxygen in non ferrous metallurgy when it commissioned the first industrial oxygen f1ash smelting process for the treatment of copper concentrates in the ear 1y fiftie
Jan 1, 1992
-
Tonnage Oxygen at Inco's Copper Cliff Smelter: SO2 Abatement Energy Conservation and ProductivityBy C. A. Landolt
Inco pioneered the use of tonnage oxygen in non ferrous metallurgy when it commissioned the first .industrial oxygen flash smelting process for the treatment of copper concentrates in the early fiftie
Jan 1, 1992
-
Tonnage Uncertainty Assessment of Vein-Type Deposits Using Distance Functions and Location-Dependent CorrelogramsBy David F. Machuca-Mory
Modelling the geometry of a vein is a crucial step in resources estimation. The resulting models are used as mineralization domain boundaries and have a direct impact on the tonnage of estimated resou
Oct 1, 2009
-
Tonopah Extension Assay OfficeBy GEORGE L. CHRISTIAN
T HE Tonopah Extension assay office is a two- story, concrete structure on a solid foundation of andesite, situated about 100 yd. from the company's mill, so that it will not be affected by the s
Jan 1, 1921
-
Too Much Bituminous CoalBy F. S. Peabody
ANYTHING that may be said about "too much coal" must seem rather incongruous just at this time when two-thirds of the mines in the United States have been idle for nearly four months and a temporary c
Jan 8, 1922
-
Too Much Wasteful Bulk in the Raw Materials for the Iron Blast FurnaceBy Ralph H. Sweetser
OF SPECIAL importance in the design and construction of an iron blast-furnace plant are tile raw materials to be employed. Obviously the iron must come from some ore of that metal, but the many kinds
Jan 1, 1939
-
Toodoggone District, British Columbia - History Of The Discovery Of The Toodoggone District, North Central British ColumbiaBy Peter Tegart
The discovery of gold in the Toodoggone River area is credited to Charles McClair who mined placer deposits in 1925, reportedly valued at $17,500. After he and his partner went missing in 1927, effort
Jan 1, 1985
-
Tools For Coal Mine Reclamation - What Are The Practical Options? ? IntroductionBy W. A. Haley
As far back as 1939 state laws have required reclamation of mined lands. Reclamation has been the topic of many discussions and presentations, especially since the late 1960's. In the past ten ye
Jan 1, 1976
-
Tools for Friction Stir Welding and Processing: A ReviewBy Y. N. Zhang
Friction Stir Welding (F SW) is a novel "green" manufacturing technique due to its energy efficiency and environmental friendliness. This solid-state joining process involves a rotating tool consistin
Jan 1, 2011
-
Top Coal Movement Law of Dynamic Group Caving Method in LTCC with an Inclined Seam "Mining, Metallurgy & Exploration (2020)"By Weijie Wei, Jinwang Zhang, Shengli Yang
Due to the unbalanced top coal drawing process, the recovery ratio is low, and the equipment stability is poor in the longwall top coal caving mining (LTCC) with an inclined seam. Aimed at these probl
Jul 7, 2020
-
Top Executives Highly Paid In Nonferrous Metals IndustryBy S. Robinson Brainard
In 1957 the pay of chief executives in the nonferrous metals industry was well above average when compared with other major industries. Furthermore, it continued to rise last year while sales declined
Jan 10, 1958
-
Top Hammer Hydraulic Drilling Pushing the Practitioners' EnvelopeBy William Hissem
When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin
Jan 1, 2000
-
Top Slicing - Top Slicing in Old Fills at El Bordo Mine, MexicoBy R. J. Mechin
Top-slicing was introduced in the Pachuca district in 1917 by T. C. Baker, at that time mine superintendent of the Santa Gertmdis mine. There then existed 1200 ft. below the surface, lying between the
Jan 1, 1925
-
Top Slicing In Old Fills At El Bordo Mine, MexicoBy R. J. Mechin
TOP-SLICING was introduced in the Pachuca district in 1917 by T. C. Baker, at that time mine superintendent, of the Santa Gertrudis mine. There then existed 1200 ft. (365.7 m.) below the surface, lyin
Jan 10, 1925
-
Top Submerged Lance Furnace Lining Cooling System UpgradeBy Allan MacRae
Freeport-McMoRan Inc. operates an ISASMELTTM furnace for the smelting of copper concentrate at the Miami Smelter in Claypool, Arizona. In May 2017, the furnace was restarted after incorporating newly
-
Top Submerged Lancing for Recovery of Zinc From ISF SlagBy M. Waladan
The top submerged lancing Sirosmelt system has been developed through laborator.y scale testwork and pilot plant trials for recovery of zinc from ISF slag. The effects of the process variables of gas
Jan 1, 1990