Search Documents

Sort by

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Carrapateena Vent Rise Performance – Geotechnical Design and Calibration

    By G Balog, T Ormerod, D Sidea

    Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro

    Mar 15, 2021

  • SME
    Carrier Flotation For The Removal Of Radionuclides From Contaminated Soils (PREPRINT NUMBER 96-14)

    By E. H. Cho

    A current environmental concern is the cleanup and restoration of soil contaminated with low-level radionuclides at DOE sites including the Nevada Test Site. At the present, there is no applicable pro

    Jan 1, 1996

  • CIM
    Carrier flotation of hematite

    By John A. Meech, Irene E. Cristoveanu

    "The separation of hematite fines (100% - 38 um) from quartz fines (100% -75 um) was investigated using coarse hematite (-212 + 150 um) as a carrier in an oleic acid collector system. Oleic acid addit

    Jan 1, 1985

  • CIM
    Carrier-Microencapsulation for Suppressing Flotability and Oxidation of Pyrite in Copper Mineral Processing

    By J. Satur

    In copper mineral processing, pyrite coexisting with copper sulfide minerals like chalcopyrite is separated by flotation as tailings and its oxidation in tailing dams causes the formation of acid mine

    Jan 1, 2007

  • AIME
    Carroll A. Garner, Director, A.I.M.E

    By AIME AIME

    Few men in the coal-mining industry have had experience in metal mining as well, as has Carroll A. Garner. He went to the Arizona copper country immediately after graduating from Penn State in mining

    Jan 1, 1942

  • SME
    Carrying Capacity In A Pilot Flotation Column (c455c347-57bd-4dda-bdf0-0cf485eb7e53)

    By M. T. Ityokumbul

    Concentrate flowrates have been measured for the flotation of -100 mesh Lower Kittaning coal in a computer controlled 0.076 m x 3.5 m pilot flotation column. The variables studied were recovery zone h

    Jan 1, 1997

  • SME
    Carrying Coal To The 21st Century: The ICG/Hoosier Energy Contract

    By Robert J. Neubauer

    I was asked here today to discuss the first long-term freight rate contract ever signed by a U.S. railroad and shipper. That was ICG's contract with the hoosier energy company to haul coal from s

    Jan 1, 1981

  • AIME
    Cartels-Their Significance for American Business

    By AIME AIME

    FREE competition, long the controlling ideal of domestic trade within the United States, has had the fundamental geographical advantage of functioning in the world's largest area of unrestricted

    Jan 1, 1944

  • AIME
    Case Against a Copper Tariff

    By AIME AIME

    THAT the copper industry is in serious straits is admitted. So are the lead and zinc industries, and both lead and zinc are tariff protected. Conditions in the Western lead, zinc and silver mining dis

    Jan 1, 1932

  • AIME
    Case Examples of Underground Mine Stability Investigations

    By Kenneth E. Mathews, Ross D. Hammett, S. Byron Stewart

    Theoretical models have been important throughout the history of engineering as a means of understanding past experiences and predicting future performance. Most modelling involves assumptions and a d

    Jan 1, 1983

  • DFI
    Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)

    By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa

    "Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low

    Jan 1, 2015

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • SME
    Case Histories Of Plant Modification

    By A. T. Yu

    As a nation, we have been known as perhaps the most wasteful in history. From the perspective of engineers and builders on the other hand, planned obsolescence and demolition did beneficially pave way

    Jan 1, 1985

  • SME
    Case Histories of the Application of the STG Integrated Grouting Method

    By Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams

    The integrated grouting method, as developed in the USSR, can be applied to multi-purpose operations that in¬clude the construction of shafts, drifts, and tunnels. In the USSR it has been used extensi

    Jan 1, 1993

  • DFI
    Case Histories On The Applications Of Colloidal Silica For Permeation Grouting

    By Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden

    Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject

    May 1, 2022

  • AUSIMM
    Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude

    By R McIlwraith, B Breul

    Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities

    Jul 27, 2015

  • DFI
    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • CIM
    Case History of a Gravity Drainage Type Reservoir

    By R. E. Martin

    "The Westerose Leduc (D-3) pool, a Devonian reef reservoir situated in Central Alberta, Canada, has now been producing for over seven years. As a unit operation, the pool pro-vides an interesting exam

    Jan 1, 1960