Search Documents

Sort by

  • SME
    Cut-and-Fill Stoping - Introduction to Open Cut-and-Fill Stoping

    By Joel K. Waterland

    GENERAL DESCRIPTION Open cut-and-fill stoping for many years was prob¬ably the most widely used mining method in under¬ground metal mines. Then for a time this method was largely supplanted by the bl

    Jan 1, 1982

  • SME
    Cut-and-Fill Stoping at Star Mine

    By Gordon Miner

    GENERAL DESCRIPTION At the Star mine, Hecla Mining Co., located in Burke, Shoshone County, ID, the mining method is horizontal slicing (timbered or untimbered) cut-and-fill using hydraulic sand backf

    Jan 1, 1982

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • SME
    Cutoff Grade Optimization (PREPRINT NUMBER 93-247)

    By K. Dagdelen

    The definition and shortcomings of traditional cutoff grades are discussed. The concept of optimum cutoff grade policy which maximizes the Net Present Value (NPV) of annual cash flows coming from a mi

    Jan 1, 1993

  • SME
    Cutoff Grade Strategy - A Balancing Act

    By J. M. Marek

    The determination of the proper cutoff grade for an open pit metal mine is based on economic criteria and the operating philosophy of the mining company. Previous papers have dealt with the balance of

    Jan 1, 1985

  • IOM3
    Cutoff-grade decisions in relation to an Indian copper-mining complex

    By R. R. Tatiya

    The following procedure was used to determine cut-off grades: define the orebody profile; plan the stope layout and quantify the work involved; formulate equipment-performance norms; calculate unit co

    Jul 1, 1996

  • SME
    Cutter Mining – A Sustainable Technology For Mining Small Vertical Ore Bodies And Veins - SME Annual Meeting 2023

    By U. Schoepf

    Economic and at the same time environmentally acceptable mining of small vertical ore bodies and veins to great depths has always been a challenge for miners. The Bauer cutter system, widely used in c

    Feb 1, 2023

  • AUSIMM
    Cutter Mining – Crossover Technology from Civil Engineering to Mining

    By S K. Schwank

    Trench cutter systems have been used in civil engineering for the least 30 years for the installation of deep cut-off walls, retaining walls and foundation systems. The systems are constantly advanced

    Nov 4, 2015

  • SME
    Cutter Roof And Its Causes

    By Wen H. Su

    This paper examines the intrinsic mechanisms of cutter roof by combining field investigation, laboratory testings, underground instrumentations, and numerical modelling. Cutter roof developed during t

    Jan 1, 1985

  • SME
    Cutter Roof Initiation And Propagation In Multiple-Entry Development Subject To High Horizontal Stress

    By S. S. Peng

    High horizontal stress has been well recognized as a significant factor in roof control. It can adversely affect roof stability if the panel is designed improperly. Mining experience has shown that it

    Jan 1, 1996

  • DFI
    Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico

    By Justin Simmons, Michael Arnold, Bob Faulhaber

    "In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms

    Jan 1, 2017

  • DFI
    Cutter Soil Mixing Solutions at the Leixões Cruise Terminal

    By Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio

    "The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam

    Jan 1, 2015

  • SME
    Cutter Vibration Monitoring For Vertical Guidance Of Mining Machines

    By C. R. Peterson

    A cutter vibration monitoring system is described which would map seam strata non-uniformities to permit guidance within the seam. An extremely simple and rugged transducer is used which is compatible

    Jan 1, 1985

  • SME
    Cutterhead Inspection and Maintenance on the Coxwell Bypass Tunnel Project in Toronto, ON - NAT2022

    By William Hodder, Ehsan Alavi, Muhib Hussain

    Disc Cutter Wear is influenced by several geological and technical factors and excessive wear can have a major impact on the excavation efficiency of Tunnel Boring Machines (TBM). Disc cutter replacem

    Dec 1, 2022

  • SME
    Cutting Edge Conference Turns a Focus to Advances in Technology

    By William Gleason

    "On April 4, 2017, the largest earth-pressure-balance tunnel boring machine (TBM) ever built finally completed its 2.7-km (1.7-mile) journey beneath Seattle, WA, nearly four years after it began borin

    Jan 12, 2017

  • SME
    Cutting Edge Heads to Denver for Fourth Installment

    By William Gleason

    "In 2008, the world quietly hit a milestone that did not receive much fanfare or publicity, but it hit one that marked a turning point in the history of mankind and the way the planet is and will be i

    Jan 1, 2015

  • ABM
    Cutting Edge Technology For Hsm – Strip Steering Control

    By Michael Breuer, Christian Mengel, Luis Acainas Caballero, Olaf Jepsen

    Stability of the hot strip mill rolling process remains a main topic when it comes to processing thin and hard materials. Strip steering especially at the end of rolling and tail out rips are a main s

    Oct 1, 2019

  • SME
    Cutting Process Of Hard Rocks And Water Jet Assistance

    By A. W. Khair

    This paper deals with the evaluation of the interaction between rock and the cutting tool, and with methods for determination of workability, and abrasivity of rock. A description of instrumentation i

    Jan 1, 1995

  • SAIMM
    Cutting strong rock with a drag bit assisted by high-pressure water jets

    Cutting strong rock with a drag bit assisted by high-pressure water jets By M. HOOD. B.Sc. Hons. (Min. Eng.). B.Sc. (Mech. Eng.). A.M.I.M.M. (Visitor) Experiments are described that led to the discove

    Jan 11, 1976