Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Danieli Total Asset Management SystemBy Andrea Donadon
This article introduces the Danieli Total Asset Management System, which involves 360 degrees service methods and equipment. Danieli Condition Monitoring System and Danieli Torque Monitoring System ar
Aug 16, 2017
-
Danieli Universal Endless (Due) - The New Evolution Of Danieli Thin Slab Casting And Rolling PlantBy Alessandro Pigani
Over the last 25 years the thin slab casting and rolling process has been gaining a major market share in the production of hot rolled strip, progressively eroding the areas previously of exclusive do
Aug 16, 2017
-
Danieli?s Entry into Direct Reduction with its Danarex®By Alim Ullah
Danieli entered into the Direct Reduction (DR) field in order to offer its clients complete turnkey facilities for steelmaking?from processing of raw materials through finished products. The Danarex®
May 1, 2003
-
Daniel–Johnson Multiple Arch Dam, Québec, Canada - Rock Foundation Safety AssessmentBy Marco Quirion
The Daniel-Johnson dam, formerly named Manicouagan-5 (Manic-5), is located 800 km northeast of Montreal (Quebec) in Canada. This is the largest multiple-arch concrete dam in the world consisting in 13
Jan 1, 2015
-
Dashboards, data sources and a modern data platformBy D Bruce
OZ Minerals’ Carrapateena mine is a Sublevel cave mine located in South Australia, approximately 160 km north of the regional centre of Port Augusta. Carrapateena commenced underground development in
Mar 29, 2023
-
Data about Labor Employed in Various Bituminous Coal MinesBy Howard Eavenson
The data given in the paper were collected to furnish an idea of the amount required in various operations of bituminous mining to produce a ton of coal, the plants selected being well-managed ones. W
Jan 1, 1924
-
Data Acquisition and Management at Olympic Dam Mine OperationsThe Olympic Dam Mining Operation involves the supply of some 2.2 million tonnes per annum of ore feed for the metallurgical plant. To achieve this approximately 9 km of tunnels are developed per year
Jan 1, 1992
-
Data Acquisition during Ground Freezing at Thyssen Mining’s Newmont Leeville Turf #3 Ventilation Shaft ProjectBy G. A. Witwicki
"The Thyssen Mining Group of Companies has successfully applied ground freezing technology to numerous projects throughout Europe and North America for over 100 years. Recently, the aspect of data acq
Jan 1, 2015
-
Data Acquisition from an Industrial Zinc Flotation CircuitBy A. Wright, P. Lacombe, R. del Villar, D. Hodouin, C. Sepulveda
"The data acquisition from industrial plants is a fundamental step for process modelling in process optimization, process analysis and automatic control.The introduction, some years ago, of modern dis
Jan 1, 1991
-
Data analytics and machine learning methods applied to underground coalmine roof convergence dataBy I Canbulat, J Emery, L Yao and C Zhang
This paper documents a process of data analytics and machine learning applied to coalmine roof convergence data. It follows a publication documenting the formation of the database. For each set of ana
Nov 29, 2022
-
Data augmentation for image-based rock fragment recognition using StyleGANBy Y Tang, G Si
The analysis of rock fragment sizes plays a pivotal role in various stages of geotechnical and mining engineering. Traditional case-based methods often falter in addressing the variability in rock fra
Sep 1, 2024
-
Data Base-Oriented Planning Systems-- New Challenges And Opportunities In The Mineral IndustryBy Alfred Weiss
When I first received the announcement of this meeting I was pleased to see that this 14th APCOM Symposium had expanded its range of interest. One new topic to be considered this year is long range or
Jan 1, 1977
-
Data Center Para AutomaçãoBy Márcio Aurélio dos Santos
A Automação Industrial utiliza de forma intensiva os mesmos equipamentos e softwares de TI como servidores, historiadores, switches, firewall, dentre outros. No entanto, são poucas as áreas de automaç
Jul 30, 2018
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Data Collection and Analysis for the George Fisher Project, Mount Isa, QldBy S Versace, D Arnott, D Bojcevs, A Shaw
The George Fisher deposit is a significant sediment hosted silver-leadzinc resource located 2 km north of the Hilton Mine in NW Queensland. The George Fisher feasibility project involved the completio
Jan 1, 1998
-
Data Communication Manager for an Intelligent Excavation SystemBy Jeonghwan Kim
Intelligent Excavation System (IES) has been considered to be one of the desirable solutions to improve the productivity, quality and safety of the current earthwork processes. IES is composed of vari
Aug 1, 2013
-
Data Corrections in Two-Dimensional Liberation StudiesBy G. S. Hill
A large amount of the stereological error associated with liberation studies can he eliminated by assessing areas instead of linear intercepts. The presentation of a simple geometrical model as a ster
Jan 11, 2011
-
Data Driven Lean Mining Using Short Interval ControlBy Aaron Samuel Young, Hiago Antunes Amador de Oliveira, William Pratt Rogers
Low commodity prices and lack of new high-grade deposits are pushing the mining industry for innovation. Lean mining has been vastly discussed in the past decades as a way to continuously improve mini
Oct 3, 2019
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Data FilesBy Rudolf E. Greuer, Linneas W. Laage, Xinton Chang
Data or input files are used to describe the mine's ventilation system and physical characteristics necessary for ventilation calculations as well as the physical or mechanical disturbance to be
Jan 1, 1990