Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design Of Yieldable Tunnel Supports For Creeping Rocks (PRIPRINT 94-76)By N. D. Cristescu
The aim of the present paper is to show how a mathematical modeling of a creeping rock and that of an yieldable lining can allow us to obtain an optimization of the lining design and generally of the
Jan 1, 1994
-
Design Optimization Of Grasberg Block Cave HaulageBy D. Marsh
The feasibility study for the Grasberg Block Cave mine, finalized in May 2008, indicated a production capacity of 160,000 tonnes per day. A rail haulage system was an integral part of the mine design
Jan 1, 2010
-
Design Optimization of Longwall Chain PillarsBy Behdeen Oraee, Amirhossein Bangian, Kazem Oraee
"Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple
Jan 1, 2010
-
Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026By C. H. Stephenson, Z. White
This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio
Feb 22, 2026
-
Design Principles for Optimizing an Established Survey Slope Monitoring SystemBy N. Mphathiwa
When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th
Jan 1, 2014
-
Design Problems Associated With Port Handling FacilitiesBy Ian S. Ross
The emphasis in this paper is focussed on dry bulk car go or the same cargo converted to slurry form for ease of handling. It is this type of cargo which is of primary interest to the mining industry
Jan 1, 1972
-
Design Procedure and Results from a Field Test of Soil Freezing as Stabilisation of Bottom Slice FillBy P Andersson, P Marklund
Evaluation of different techniques for bottom fill stabilisation showed that frozen fill was the most economical method. In order to test the method a full-scale field test was performed in the Rehnst
Jan 1, 1998
-
Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall AreasBy Richard A. Allwes
A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano
Jan 1, 1986
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Design Selection for Large-Scale Grinding Operations ù AG/SAG or HPGR?By J Hudson
Autogenous (AG) and Semi Autogenous (SAG) grinding mills are the conventional selection for large-scale grinding circuits. It is accepted that these forms of comminution are not the most energy effici
Jan 1, 2006
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Design Spans ? Underhand Cut and Fill MiningBy Rimas Pakalnis
This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r
Apr 1, 2005
-
Design Strategies For Selective FlocculantsBy G. R. O?Neil
The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i
Jan 1, 1983
-
Design Trade-Off For Angle Roof DrillingBy James H. Fletcher
Much data and experience has been accumulated, especially in the last 5 or 6 years, to show that modern roof trusses, both of the Birmingham type and the bolt-and-channel type, perform well to support
Jan 1, 1982
-
Design, Commissioning and Operation of Elura's Larox Pressure FiltersBy Jagger ND
Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain
Jan 1, 1985
-
Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD FoundationsBy Stefano Pirrello
"Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t
Jan 1, 1900
-
Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? IntroductionBy M. D. Scott
Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972
Jan 1, 1976
-
Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil WaterwaysBy M D. Melville, B C. T Macdonald, T D. W
The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T
Jan 1, 2003
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022