  • DFI
    Development of Fiber-Reinforced Soil Improvement Using CSM Method

    By Toshio Yonezawa, Helmut Florian, Herbert Kuh, Masamichi Aoki, Takao Koono, Franz-Werner Gerressen

    "To increase the bearing capacity of the ground, soil improvement technique is often adopted. One advantage of soil improvement techniques is the fact, that the impact to the environment is low, as th

    Jan 1, 2015

  • SME
    Development Of Fine Ore Production At Cape Lambert - History Of The Project

    By G. J. Gersbach

    The Robe River Iron Ore Project began in 1962 when Cliffs International acquired mining leases in Western Australia's Pilbara Region. Initial reserves were proven and bulk ore samples sent to the

    Jan 1, 1983

  • SME
    Development of Flowsheet for a Low Grade Chromite Ore in Turkey

    By Ö. Y. Gulsoy, L. Ergün, I. B. Celik

    "In this study, the studies to develop a flowsheet for a low grade chromite ore are presented. The existing concentrator had to be suspended due to the decreasing metal prices. The study commenced wit

    Jan 1, 2017

  • CIM
    Development of Geometallurgical Comminution Mapping and Modelling

    By Luke Keeney, Stephen Walters

    "The start up of a new mining and metallurgical facility is a crucial step in the life of any mining project. The mining industries record is poor when evaluating processing plant operation relative t

    Jan 1, 2009

  • IMPC
    Development of geometallurgical laboratory tests to characterize metal preconcentration by size

    By C. Carrasco

    "Over the last 30 years the average grade of mined ore bodies has significantly decreased while the proportion of waste removal has in many cases more than doubled. This has been identified as prime r

    Jan 1, 2014

  • SME
    Development of Goaf Gas Drainage and Inertisation Strategiesin 1.0-km- and 3.0-km-Long Panels Mining, Metallurgy and Exploration

    By Rao Balusu, Bharath Belle, Krishna Tanguturi

    A collaborative research project is undertaken by Anglo American Coal and CSIRO to develop appropriate strategies for gas and spontaneous combustion management of longer panels. Extensive computationa

  • AUSIMM
    Development of Goaf Gas Drainage Strategies for Start-up Areas of Highly Gassy Longwall Panels

    By K Tanguturi, B Belle, R Balusu

    Management of high rates of goaf gas emissions between 4000 and 6000 L/s of methane gas in longwall panels is a challenging issue, particularly in start-up areas of the panels. There is a need for inv

    Aug 31, 2015

  • AIME
    Development Of Grain Boundaries In Heat-Treated Alloy Steels- Discussion

    J. A. MATHEWS, * Syracuse, N. Y. (written discussion?).-The reagent described by Mr. Archer seems to be a selective reagent, useful in one particular field. Nevertheless, the field is one in which it

    Jan 5, 1919

  • TMS
    Development of Green Rust/Ferrite Process for Treating Selenium Contaminated Groundwater

    By Tomoya Nihei, Hiroshi Hayashi

    "A novel selenium removal process called Recycled Green rust/Ferrite Process is developed by MMC. In this process, a mixed Fe2+-Fe3+ hydroxide compound, green rust (GR), reduces selenate to elemental

    Jan 1, 2008

  • CIM
    Development of Gypsum Deposits 1n Southern Newfoundland

    By D. M. Baird

    "Enormous deposits of gypsum of exceptionally high grade are readily accessible in southwestern Newfoundland. Coming large-scale production from one of these is resulting in renewed interest in deposi

    Jan 1, 1959

  • TMS
    Development of Heat Recovery System from Steelmaking slag

    By Yuuki Hagio, Hiroyuki Tobo, Michihiro Kuwayama, Yasutaka Ta

    "Reduction of CO2 emission is necessary to remedy global warming, however, promising approaches of CO2 separation require a large amount of energy. Molten slag, which is generated as by-product of ste

    Jan 1, 2012

  • SME
    Development Of High Productivity Shotcreting At The Cannon Mine

    By J. Baz-Dresch

    A custom-designed shotcrete system, consisting of an 8-m3 (10-cu-yd) transit mixer and a shotcrete spray boon carrier, is used by a two-man crew to transport and place up to 25 m3 (32 cu-yd) of steel

    Jan 1, 1992

  • ABM
    Development Of High Quality Grades Production Techniques Using A Vod Plant At Voestalpine Giesserei Linz

    By Andrea Pezza

    The steel market is experiencing a difficult conjuncture: on the one hand steel producers minimize their investments while optimizing their over- production, on the other hand suppliers reduce their i

    Oct 30, 2017

  • CIM
    Development of High Quality Steel Slab for Oil and Gas Line Pipe Application

    By W. Basuki, B. Setyotomo, L. Hakim, R. Hendrajaya

    Due to high crack sensitivity of slab product of gas and oil line pipe application, its steel making process and alloy composition were evaluated and then improved to overcome its critical solidificat

    Jan 1, 2005

  • SAIMM
    Development Of High Resolution 3D Vertical Seismic Profiles - Synopsis

    By C. C. Pretorius

    3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit

    Jan 1, 2011

  • CIM
    Development of High-Strength and High-Toughness Plates for API X-100 and X-120 Linepipe Steels for the 21st Century

    By C. I. Garcia, G. Zhou, W. Gao, A. J. DeArdo

    The development of X-100 and X-120 linepipe steels was investigated using a series of low-carbon Mo-Nb-B steels. The laboratory steels were vacuum melted and processed using advanced thermomechanical

    Jan 1, 2005

  • AIME
    Development Of Hindered-Settling Apparatus.*

    By Robert H. Richards

    (Pittsburg Meeting, March, 1910.) THIS is in part a review paper, indicating the various steps that have been taken in developing hindered-settling apparatus, some of the standard data that have been

    Feb 1, 1911

  • SME
    Development Of Hookers Prairie Mine And Plant

    By Charles H. Greene

    This paper will describe briefly the steps taken in the development of a Central Florida phosphate ore deposit from acquisition to mining. Further, the design and early operation of the mining and ben

    Jan 1, 1977

  • CIM
    Development of Hot Backward Extrusion on an Uranium Alloy using Finite Element Calculation

    By W. Geslin

    Backward extrusion process is a metal forming process, which limits the manufacturing?s extra thickness when compared with classical die forging technique. Because of a lack of alloy?s mechanical beha

    Aug 1, 2010

  • CIM
    Development of HPGR Circuit Based on the Operating Parameters and Material Characteristics

    By V. Sheikhzadeh, M. Saghaeian, R. Hejazi, P. Ghobadi

    Design and selection of equipment for a grinding circuit strongly depends on the mill function, ore properties and requirements of the down-stream circuit. Primary mills usually work in open circuit a

    Jan 1, 2016