Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of Fiber-Reinforced Soil Improvement Using CSM MethodBy Toshio Yonezawa, Helmut Florian, Herbert Kuh, Masamichi Aoki, Takao Koono, Franz-Werner Gerressen
"To increase the bearing capacity of the ground, soil improvement technique is often adopted. One advantage of soil improvement techniques is the fact, that the impact to the environment is low, as th
Jan 1, 2015
-
Development Of Fine Ore Production At Cape Lambert - History Of The ProjectBy G. J. Gersbach
The Robe River Iron Ore Project began in 1962 when Cliffs International acquired mining leases in Western Australia's Pilbara Region. Initial reserves were proven and bulk ore samples sent to the
Jan 1, 1983
-
Development of Flowsheet for a Low Grade Chromite Ore in TurkeyBy Ö. Y. Gulsoy, L. Ergün, I. B. Celik
"In this study, the studies to develop a flowsheet for a low grade chromite ore are presented. The existing concentrator had to be suspended due to the decreasing metal prices. The study commenced wit
Jan 1, 2017
-
Development of Geometallurgical Comminution Mapping and ModellingBy Luke Keeney, Stephen Walters
"The start up of a new mining and metallurgical facility is a crucial step in the life of any mining project. The mining industries record is poor when evaluating processing plant operation relative t
Jan 1, 2009
-
Development of geometallurgical laboratory tests to characterize metal preconcentration by sizeBy C. Carrasco
"Over the last 30 years the average grade of mined ore bodies has significantly decreased while the proportion of waste removal has in many cases more than doubled. This has been identified as prime r
Jan 1, 2014
-
Development of Goaf Gas Drainage and Inertisation Strategiesin 1.0-km- and 3.0-km-Long Panels Mining, Metallurgy and ExplorationBy Rao Balusu, Bharath Belle, Krishna Tanguturi
A collaborative research project is undertaken by Anglo American Coal and CSIRO to develop appropriate strategies for gas and spontaneous combustion management of longer panels. Extensive computationa
-
Development of Goaf Gas Drainage Strategies for Start-up Areas of Highly Gassy Longwall PanelsBy K Tanguturi, B Belle, R Balusu
Management of high rates of goaf gas emissions between 4000 and 6000 L/s of methane gas in longwall panels is a challenging issue, particularly in start-up areas of the panels. There is a need for inv
Aug 31, 2015
-
Development Of Grain Boundaries In Heat-Treated Alloy Steels- DiscussionJ. A. MATHEWS, * Syracuse, N. Y. (written discussion?).-The reagent described by Mr. Archer seems to be a selective reagent, useful in one particular field. Nevertheless, the field is one in which it
Jan 5, 1919
-
Development of Green Rust/Ferrite Process for Treating Selenium Contaminated GroundwaterBy Tomoya Nihei, Hiroshi Hayashi
"A novel selenium removal process called Recycled Green rust/Ferrite Process is developed by MMC. In this process, a mixed Fe2+-Fe3+ hydroxide compound, green rust (GR), reduces selenate to elemental
Jan 1, 2008
-
Development of Gypsum Deposits 1n Southern NewfoundlandBy D. M. Baird
"Enormous deposits of gypsum of exceptionally high grade are readily accessible in southwestern Newfoundland. Coming large-scale production from one of these is resulting in renewed interest in deposi
Jan 1, 1959
-
Development of Heat Recovery System from Steelmaking slagBy Yuuki Hagio, Hiroyuki Tobo, Michihiro Kuwayama, Yasutaka Ta
"Reduction of CO2 emission is necessary to remedy global warming, however, promising approaches of CO2 separation require a large amount of energy. Molten slag, which is generated as by-product of ste
Jan 1, 2012
-
Development Of High Productivity Shotcreting At The Cannon MineBy J. Baz-Dresch
A custom-designed shotcrete system, consisting of an 8-m3 (10-cu-yd) transit mixer and a shotcrete spray boon carrier, is used by a two-man crew to transport and place up to 25 m3 (32 cu-yd) of steel
Jan 1, 1992
-
Development Of High Quality Grades Production Techniques Using A Vod Plant At Voestalpine Giesserei LinzBy Andrea Pezza
The steel market is experiencing a difficult conjuncture: on the one hand steel producers minimize their investments while optimizing their over- production, on the other hand suppliers reduce their i
Oct 30, 2017
-
Development of High Quality Steel Slab for Oil and Gas Line Pipe ApplicationBy W. Basuki, B. Setyotomo, L. Hakim, R. Hendrajaya
Due to high crack sensitivity of slab product of gas and oil line pipe application, its steel making process and alloy composition were evaluated and then improved to overcome its critical solidificat
Jan 1, 2005
-
Development Of High Resolution 3D Vertical Seismic Profiles - SynopsisBy C. C. Pretorius
3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit
Jan 1, 2011
-
Development of High-Strength and High-Toughness Plates for API X-100 and X-120 Linepipe Steels for the 21st CenturyBy C. I. Garcia, G. Zhou, W. Gao, A. J. DeArdo
The development of X-100 and X-120 linepipe steels was investigated using a series of low-carbon Mo-Nb-B steels. The laboratory steels were vacuum melted and processed using advanced thermomechanical
Jan 1, 2005
-
Development Of Hindered-Settling Apparatus.*By Robert H. Richards
(Pittsburg Meeting, March, 1910.) THIS is in part a review paper, indicating the various steps that have been taken in developing hindered-settling apparatus, some of the standard data that have been
Feb 1, 1911
-
Development Of Hookers Prairie Mine And PlantBy Charles H. Greene
This paper will describe briefly the steps taken in the development of a Central Florida phosphate ore deposit from acquisition to mining. Further, the design and early operation of the mining and ben
Jan 1, 1977
-
Development of Hot Backward Extrusion on an Uranium Alloy using Finite Element CalculationBy W. Geslin
Backward extrusion process is a metal forming process, which limits the manufacturing?s extra thickness when compared with classical die forging technique. Because of a lack of alloy?s mechanical beha
Aug 1, 2010
-
Development of HPGR Circuit Based on the Operating Parameters and Material CharacteristicsBy V. Sheikhzadeh, M. Saghaeian, R. Hejazi, P. Ghobadi
Design and selection of equipment for a grinding circuit strongly depends on the mill function, ore properties and requirements of the down-stream circuit. Primary mills usually work in open circuit a
Jan 1, 2016