Search Documents

Sort by

  • AIME
    Dimensions And Changing Patterns Of Supply And Demand

    By Richard H. Mote, W. C. Schroeder

    The endlessly changing pattern of mineral supply and demand offers opportunity to the alert and can bring disaster to the unwary. The discovery of ore bodies, the invention of extractive processes, th

    Jan 1, 1959

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    Dinner Address

    While I contemplate the formidable catalogue of bodies and organisations participating in this Conference and the impressive array of qualifications chalked up after the names of the representativ

    Jan 1, 1986

  • AIME
    Dip Chart

    Discussion of the paper of HOWLAND BANCROFT, presented at the Salt Lake meeting, August, 1914, and printed in Bulletin No. 91, July, 1914, pp. 1767 to 1769. THEODORE SIMONS, Butte, Mont. (communicati

    Jan 12, 1914

  • AUSIMM
    Dip Sampling Cyanide Gold Bullion at the Sons of Gwalia Gold Mine, Gwalia, Western Australia

    The difficulty of accurately sampling cyanide gold bullion for valuation is well known, and nothing new or original is claimed in presenting this paper, but it was thought that a record of differences

    Jan 1, 1931

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • CIM
    Diplomat Mine

    By J. Keith Haddock

    "Introduction The Luscar company, Forestburg Collieries Ltd., operates the Diplomat Mine located 14 km south of Forestburg, Alberta. Production is now at a declining rate from the 1 million tonnes ach

    Jan 1, 1985

  • AUSIMM
    Dipmeter Interpretation of Intra-Latrobe Group Fluvial Sand Bodies, Basker/manta Block, Gippsland Basin

    By Rayner B

    Five wells have been drilled in the Basker/Manta Block of VIC/P19, Gippsland Basin, resulting in sub-economic Intra-Latrobe Group oil and gas discoveries at Basker-1 and Manta-1. A total of 21 indiv

    Jan 1, 1992

  • SME
    Direct Acid Elution Of Anionic Exchange Resins For Uranium Recovery

    By T. Y. Yan

    An effective elution technique has been developed for recovering uranium from ion exchange resins loaded in the carbonate leaching process. The procedure employs direct elution with acid. In compari

    Jan 1, 1988

  • SME
    Direct And Indirect Determination Of Shear Strength Of Rock Mass

    By B. Ladanyi

    An adequate knowledge of the overall behavior of a rock mass at a given site is fundamental to the satisfactory design of a rock slope. The be- havior is controlled by a variety of factors, in- cludi

    Jan 1, 1980

  • TMS
    Direct Atmospheric Leaching of Saprolitic Nickel Laterite Ores with Sulphuric Acid

    By Walter Curlook

    An atmospheric acid leaching process for leaching nickel and cobalt from highly-serpentinized saprolitic fractions of nickel laterite deposits has been developed and patented [I]. The process involves

    Jan 1, 2004

  • SAIMM
    Direct Block-Support Simulation of Grades in Multi-Element Deposits: Application to Recoverable Mineral Resource Estimation at Sungun Porphyry Copper-Molybdenum Deposit

    By S. A. Hosseini, O. Asghari

    "Recoverable mineral resources assessment has become a standard geostatistical application in the mining industry, with various geostatistical techniques currently available. This investigation aimed

    Jan 1, 2017

  • AUSIMM
    Direct Chill Casting of Aluminium and its Application at Comalco Aluminium (Bell Bay) Limited

    Over half of the molten aluminium produced at the 52,000 tons/ year eapacity plant operated by Comalco Aluminium (Bell Bay) Limited in Tasmania is cast into saleable produets by the direct chill proce

    Jan 1, 1967

  • TMS
    Direct Chlorination of llmenite by Carbon Tetrachloride in a Fixed Bed Reactor

    By M. H. Staia

    A Venezuelan ilmenite concentrate has been chlorinated at a temperature of 700" C by carbon tetrachloride. In the experimental rig, built at laboratory level, the direct chlorination process yielded a

    Jan 1, 1995

  • CIM
    Direct Contact Heat Transfer between Steam and Aqueous Slurries

    By D. T. White

    "Metallurgical extraction processes often call for the heating of aqueous slurries. Indirect heat exchangers are generally not feasible for service with high yield stress slurries because of low heat

    Jan 1, 2012

  • SME
    Direct Cyanidation and Roasting Combination of a Semi-Refractory Massive Sulfide Ore

    By P. Karimi, A. Akcil, A. Amini, H. Abdollahi

    "In this study, cyanidation experiments were carried out on a massive sulfide ore sample, whose grades of the precious metals gold and silver were found to be 4.2 g/t and 311.9 g/t, respectively. Othe

    Jan 1, 2015

  • AUSIMM
    Direct Determination of Washing Parameters to Maximize Yield at a Given Ash

    An algorithm is described which leads directly to a unique set of coal washing parameters which, in two or more parallel streams, will give maximum yield of product at a given ash. This occurs when al

    Jan 1, 1987

  • SME
    Direct Digital Control Applied To Dynamic Processes

    By Robert J. Gorney

    This paper deals with the actual application of a direct digital control to simple as well as complex industrial process control loops, Fundamental descriptions of preliminary research and design are

    Jan 1, 1965

  • TMS
    Direct Electrowinning Copper from Dilute Leach Solutions

    Direct electrowinning is an electrochemical process which has been developed for the extractive recovery of copper from dilute, acidic leach solutions. In passing through a thin particulate coke catho

    Jan 1, 1976