Search Documents

Sort by

  • AIME
    Drilling–Equipment, Methods and Materials - Theory of Formation Cutting Using the Sand Erosion Process

    By R. W. Brown, J. L. Loper

    The process of sand erosion has been harnessed to perform a useful function—the directed perforating of oilfield tubular goods and formation rock. In this process the sand is carried by a liquid mediu

  • AIME
    Drilling–Equipment, Methods and Materials - Thermal Stresses Around a Wellbore and Their Small Effect on Velocity Logging

    By V. S. Tuman

    In the first part of this paper, an estimate is made of the magnitude and extent of the thermal stresses which result from mud circulation. Our study is made for the period of relaxation, i.e., when t

  • AUSIMM
    Drillling Patterns and Ore Reserve Assessments

    By Watson D. F

    Armstrong's (1983) criticisms of PhiIip and Watson's (1982b) note on optimal drilling patterns are based on misinterpretation, supported by errors in geometry. Furthermore, Armstrong argues

    Jan 1, 1984

  • SME
    Drive and Brake Control Considerations When Using Fluid Couplings on Regenerative Conveyors

    By Derek G. Cieplinski

    Regenerative conveyors with complex conveyor profiles place unusually stringent demands on the starting drive control. Depending on the nature of the conveyor loading, the drive must either provide a

    Jan 1, 1993

  • SME
    Drive Options For Belt and Apron Feeders

    By Laszlo Toth

    A feeder is used to control the gravity flow of bulk solids from storage areas, like a bin or a stockpile. For this type of application, it is important to select a proper drive that can fulfill all

    Jan 1, 2003

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • DFI
    Driven Piles In Central Texas Expansive Soils

    By Clayton A. Signor

    Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl

  • IMPC
    Drivers And Barriers In The Supply Chain ? The Importance Of Understanding The Complexity Of Recycling In The Industrial System

    By N. Pajunen

    The basic objectives of current EU waste policy are to prevent waste and promote re-use, recycling and recovery to reduce negative environmental impact (2008/98/EC). In this paper, we focus on drivers

    Sep 1, 2012

  • SME
    Drivers of impact assessments: Human health, safety and the environment

    By Gary MacDonald

    What is the primary function of an impact assessment? Many people at the International Association of Impact Assessment?s (IAIA) annual conference said that it is time to return to the fundamentals an

    Aug 1, 2013

  • AIME
    Driving A 540-Foot Raise At Nivloc, Nevada

    By R. K. Matheson

    THE Nivloc mine is 9 miles west of Silver Peak, Esmeralda County, Nevada. It has been operated by Desert Silver, Inc., since the summer of 1937. The cyanide mill treats 19o tons of silver-gold ore per

    Jan 1, 1942

  • AIME
    Driving A Tunnel In Fractured Rock Formation Carrying Water Under High Static Pressure

    By P. S. Miller, S. H. Ash

    EXTENSIVE and diversified resources justify large populations and great industries. To carry on the business of commerce and meet the demands of large populations, the utilization of tunnels in some f

    Jan 1, 1942

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • DFI
    Driving And Extraction Of Steel Pipe Piles In Nearshore Environment

    By Nihal Bohra

    A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • SME
    Driving Down Haulage Costs

    By P. Holman

    I would like to start this paper by looking back about twenty years to see where we have been in the mining industry. We will also look forward a bit and talk about what lies ahead. Here is what has

    Jan 1, 1993

  • AUSIMM
    Driving Future Tunnels with Mechanical or Explosion Energy - A Blasting Engineer's View

    The current drill-and-blast method of tunnelling is cyclic and, for this reason above all others, has a future application potential which is lower than that of continuous methods. There is scope

    Jan 1, 1987

  • AIME
    Driving Headings In Rock Tunnels.

    By W. L. Saunders

    (New Haven Meeting, February, 1909.) This paper deals specifically with heading-driving as distinguished from the broader term tunnel-driving. A heading is a pilot or path-finder for the main tunnel.

    Apr 1, 1909

  • AUSIMM
    Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic Dam

    By J Taylor, M Smith, A Tunnadine, D Nikolakopoulos

    As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground

    Mar 22, 2022

  • CIM
    Driving Methods at the Myrtle Group

    By E. E. Mason

    THE Myrtle group of mining claims is situated on Barkerville mountain in the Cariboo mining district of British Columbia, west of the old mining town of Barkerville. An 1,800-foot adit, known as the S

    Jan 1, 1942