Constructing the Airside Road Tunnel, Heathrow AirportBy John Corcoran
INTRODUCTION Content of this Report The 1300m long twin-bore 8.1m diameter Airside Road Tunnels (ART) were excavated beneath the busy taxiways and stands of Heathrow Airport between 2002and 20
Jan 1, 2005
-
ConstructionBy T. A. Rickard
The writing that is effective is woven with a fine texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it
Jan 1, 1931
-
Construction Aggregates Industry Trends Inspire InnovationBy Bruce W. Woolpert
During the SME Board of Directors’ midyear meeting in Monterey, CA Aug. 25, I discussed trends in the construction aggregates industry. Many construction-material suppliers may not have yet fully int
Jan 1, 2002
-
Construction And Instrumentation Of A Deep Foundation ? SynopsisBy Y. K. Wong
This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment
Jan 1, 2010
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Construction Considerations For Ground Modification Projects ? SynopsisBy J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Construction Control Instrumentation Used During Tunnel EnlargementBy Raymond P. Miller, David L. Monson, Robert A. Robinson
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p
Jan 1, 1976
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector FacilityBy Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of AntwerpBy Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Construction Of A TBM Launch Box In A Complex Urban EnvironmentBy Vincent Tirolo
The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F
Jan 1, 2013
-
Construction of an Underpass Crossing in Proximity of a Railway TrackBy Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi
"1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is
Jan 1, 2016
-
Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, OregonBy Yves St-Amour, Vince Luongo
This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately
Jan 1, 2005
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Construction Of First 20-Foot Diameter Machine-Bored Raised ShaftsBy R. A. Pond
Two 6.17 m (20 ft 3 in.) diameter raises, concrete-lined to 5.49 m (18 ft) inside diameter, were completed in 1978 at the Monterey Coal Company Number One Mine near Carlinville, Illinois, by Frontier-
Jan 1, 1979
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box JackingBy Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Construction Of Large Underground Openings And Use Of Grouts ? SynopsisBy E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Construction Of Port Huron, Michigan Intake ShaftBy D. E. Piggott, B. E. Hartmann
The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise
Jan 1, 1974