Description of the Shear Stree Distribution around and Excavation at WIPPThe estimation of the shear stress distribution around an excavation is important to the design of the excavation since shear stresses can generate cracks, loosen grain boundaries or otherwise degrade
Jan 1, 1998
-
Desenvolvimento De Metodologia De Controle De Vazão De Ar Primário Para Combustão E De Resfriamento Das Queimadores Na Samarco MineraçãoBy Maycon Athayde
A Samarco Mineração utiliza combustível gasoso para geração de energia térmica para o endurecimento pelotas de minério de ferro. O balanceamento térmico do forno ocorre através do controle das malhas
Aug 1, 2018
-
Deserado Mine Computer Monitoring And Control System EvaluationBy R. H. King
The Deserado Mine of Western Fuels- Utah Inc. installed a micro-computer based mine wide monitoring and control system for mine environment, beltway fire protection, belt operating parameters, and equ
Jan 1, 1987
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Design & Development of the Barmac RotopactorBy Bryan A. Bartley
"Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla
Jan 1, 1985
-
Design and Commissioning of the Ridgeway ConcentratorBy B Clemen, D Gordon, F Cesnik, P Griffin
In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm
Jan 1, 2003
-
Design And Construction Challenges At The Gualcamayo Mine ? IntroductionBy N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re
Jan 1, 2011
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing TechnologyBy J. Ouellet
The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr
Aug 1, 2013
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021
-
Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO ProjectBy J. Chae, D. Pecha, R. Andrews
The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro
Jan 1, 2005
-
Design And Construction Of The Deep Stations For The Copenhagen Metro - SynopsisBy David R. Beadman
This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj
Jan 1, 2000
-
Design and Construction of the Shoal Creek Raw Water Intake at Lake LanierBy D. Rendini, R. D. Gutridge
INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr
Jan 1, 2005
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2005
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014