Search Documents

Sort by

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah

    By Rick Deschamps

    The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake

    Jan 1, 2009

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Designing A Final Wall Blast To Improve Stability (PRIPRINT 86-50)

    By James P. Savely

    This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b

    Jan 1, 1986

  • SME
    Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024

    By Sean Warren, JOSEF BOURGEOIS

    The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute

    Feb 1, 2024

  • CIM
    Designing and developing an integrated cave management system

    By A. van As, J. McGaughey, M. J. Mol, R. Tosen

    Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la

    Jan 1, 2014

  • ISEE
    Designing Blasts by Simulation Rather than Solely by Trial/Error

    By Roger Favreau, Patrice Favreau

    Without blasting there can be no roads, no hospitals, no factories, not even foundations for homes. Yet in 1960 the only way to design a blast was by trial/error. By comparison, bridges were already d

    Jan 1, 2013

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008

  • SAIMM
    Designing exploitation and dumping processes in brown coal mines using information technology techniques

    By R. Chryst, R. Kus

    In the Integrated IT Systems proposed by Przedsie? biorstwo Robót Geologiczno-Wiertniczych—Geological and Drilling Company (PRGW) a network connects a database with all of the departments of a mining

    Jan 1, 2003

  • SAIMM
    Designing for Extreme Events in Open Pit Slope Stabilty

    By L. Lorig

    "Two types of extreme event, earthquakes and rainfall, potentially affect open pit slope stability. In the case of earthquakes, there are rather well-developed analysis procedures and acceptability cr

    Jan 1, 2016

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • SME
    Designing For Upper Seam Stability In Multi-Seam Mining

    Research has determined that ground control interaction problems in mining over a previously mined seam occur primarily in the tension zone created at the edge of the subsidence trough, and in areas a

    Jan 1, 1988

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • CIM
    Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant

    By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam

    At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale

    Jan 1, 2016

  • TMS
    Designing Novel CRIMSON Running System through Numerical Simulation Method for the Purpose of Reducing the Energy Content of Aluminium Investment Casting

    By Binxu Zeng, Mark Jolly, Xiaojun Dai

    "The traditional investment casting foundries use batch melting and chunky running systems to produce casting components. This method leaves the energy saving issue as subsidiary one. In our research

    Jan 1, 2013