Search Documents

Sort by

  • NIOSH
    Discharge Water Handling And Treatment: Problems And Solutions At A Large Pittsburgh Seam Coal Mine

    By R. L. Zick, J. D. Byars, T. P. Mucho

    Recently, a large Pittsburgh seam longwall mine was nearing depletion of a major portion of its current reserves and had begun to develop in a different direction from its original portal area to acce

  • DFI
    Disconnected Piled Raft Foundations Performance (DCPRF) With Cushion

    By Saeed Salehi Malekshah

    In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen

    Jan 1, 2011

  • IOM3
    Discount rates and risk assessment in mineral project evaluations; Risk assessment in reserve estimation and open-pit planning; Inclusion of risk assessment in open-pit design and scheduling: contributed remarks

    By H. K. Taylor, B. Denby, L. D. Smith

    Contributions by H.K. Taylor and G.A. Davis discuss the three papers published in Transactions IMM A, vols. 103 and 104, with responses by Smith and Dowd

    Dec 1, 1995

  • CIM
    Discounted Cash Flow Analysis Methodology and Discount Rates

    By Lawrence Devon Smith

    "This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of

    Jan 1, 2003

  • CIM
    Discounted cash flow analysis — Methodology and discount rates

    By L. D. Smith

    "This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of

    Jan 1, 2002

  • AUSIMM
    Discovery and Evaluation of the Weda Bay Nickel/Cobalt Deposits Central Halmahera, Indonesia

    By J E. Lynch

    The Weda Bay nickel and cobalt laterite deposits on Halmahera Island, Republic of Indonesia were first drilled in May 1996 by Strand Minerals Pte Ltd (Strand). Subsequent exploration has delineated fo

    Jan 1, 1999

  • SME
    Discovery And Exploration Of The Deep Seated Porphyry Mountain Cu-Mo Deposit, Murdochville, Quebec, Canada

    Since 1955 Gaspe Mines has produced 144 million tonnes of ore, averaging 0.87% Cu, mined from two open pits and underground workings. In 1994, four exploration drill holes discovered a buried porphyry

    Jan 1, 1998

  • CIM
    Discovery and technological change: the origins of steelmaking at Sydney, Nova Scotia

    By Kris Inwood

    "In 1879, when the Dominion government initiated its controversial program of industrial promotion, iron smelting in Canada was limited to one company producing coke iron on the mainland of Nova Scoti

    Jan 1, 1999

  • AUSIMM
    Discovery of the Basangka Gold Prospect, Eastern Highlands Province

    In late 1989, first-pass reconnaissance exploration delineated a 4km x 6km geochem- ically anomalous area centred 10km WNW of Kainantu in the Eastern Highlands Province at 6¦13'S and 145047&ap

    Jan 1, 1991

  • AUSIMM
    Discovery of the Hamersley Iron Deposits

    By Burns W. G, Muceniekas E, Whitcher I. G, Hughes F. E

    No iron ore deposits were reported before 1961 from the Hamersley Ranges, Western Australia, although low-grade bedded iron formations, associated with ferruginous jaspers and cherts, were known to oc

    Jan 1, 1964

  • AUSIMM
    Discovery of Uranium Mineralization in the Manyingee Channel, Onslow Region of Western Australia

    By Morabito J, Harrop D. W

    Uranium exploration was commenced in 1973 and carried out at a regional scale over a wide area of the northern part of the Camarvon Basin of Western Australia by Minatome Australia Pty Limited and the

    Jan 1, 1981

  • AUSIMM
    Discovery, Geology and Structural Setting of the Nyidinghu Iron Ore Deposit, Hamersley Province, Western Australia

    By D Kepert, M Absalom, N Nitschke, C Fowers

    The discovery of the Nyidinghu Iron Ore Deposit totalling 2.46 Bt of resource continues FortescueÆs highly successful exploration record of discovering multi-billion tonne deposits under cover with li

    Aug 12, 2013

  • AUSIMM
    Discrete Element Method - Computational Fluid Dynamics Modelling of Flow Behaviour in a Stirred Mill - Effect of Operation Conditions

    Discrete Element Method - Computational Fluid Dynamics Modelling of Flow Behaviour in a Stirred Mill - Effect of Operation Conditions

    Sep 13, 2010

  • SME
    Discrete Fracture Network Modeling In Support Of In Situ Leach Mining

    By Bill Dershowitz

    Consider a deep gold orebody with grade of 4 g/t (0.11 oz/st). At the time of this writing, with gold prices at historic highs, it could be a good, but not great, prospect. But if it is a vein deposit

    Jan 1, 2011

  • CIM
    Discrete-Event Simulation in the Primary Metals Industry using Simul8

    By K. H. Concannon, K. I. Hindle

    "The use of simulation modeling in the primary metals industry (including mining, smelting, and metals processing) is expanding as significant cost-benefits can be realized by companies employing capi

    Jan 1, 2007

  • RMCMI
    Discussion

    PRESIDENT LITTLEJOHN: The paper of Mr. Emrick will now be open for discussion for about twenty minutes. The meeting is now open for discussion. MR. EMRICK: There is some question that may have occurr

    Jan 1, 1925

  • AIME
    Discussion

    The Role of the Drilling Contractor BY FERRIS E. SAINSBURY Ron Haxby, Occidental Minerals What is the best method for drilling a 12-in. diam hole to a depth of 1200 ft and maintaining the deflecti

    Jan 1, 1979

  • RMCMI
    Discussion (COAL MINING INSTITUTE)

    T. T. READ, BUREAU OF MINES: Mr. McAuliffe has asked a very practical question. Expressed in another way, the question is: If we have decided to use rock dust to prevent coal dust from exploding, have

    Jan 1, 1924

  • SME
    Discussion - Grade Estimation And Its Precision In Mineral Resources: The Jackknife Approach – Technical Papers, Mining Engineering, Vol. 48, No. 2, pp. 84-88 – Adisoma, G. S., Hester, M. G.

    By J. H. Tu

    The technical paper correctly points out that the kriging variance is not a good measure of the uncertainty of the estimated (i.e., kriged) value of individual blocks. The au thors claim that their pr

    Jan 1, 1998

  • IOM3
    Discussion - Components of a recovery factor in gold and tin dredging

    By R. H. . T. Garnett

    Contributed remarks on paper published in the Transactions, Mining industry section, vol. 100, September- December 1991, A121--45

    Jan 12, 1992