Search Documents

Sort by

  • IMPC
    Estimating Water Demand and Availability for Open Water-based Mill Cooling Systems

    Mineral processing is an energy and water intensive activity. Mill comminution equipment usually has high energy requirements which necessitate extensive cooling to remove heat. Cooling requirements a

    Jan 1, 2014

  • SME
    Estimation And Incorporation Of Metallurgical Data In A Mineralization Model

    By Vic Miller

    Highly variable milling properties within a geologically complex porphyry copper deposit owned by Kennecott Corporation in Nevada made it necessary to estimate the copper recovery and concentrate grad

    Jan 1, 1983

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • AUSIMM
    Estimation for Engineering Design Purposes of the Principal Stress Directions in Rocks Containing Residual Strains

    Unrelieved residual strains can influence the states of stress in rock masses. If cheap, stable structures are to be constructed in Tock in which large pressures are exterted by unrelieved residual st

    Jan 1, 1964

  • ISEE
    Estimation of Amount of Heavy Metal Deposit of Open Surface Mass Detonations per Unit Area

    By M. Hokkanen, M. Hagfors

    The Finnish Defence Forces has destroyed old and spoilt munitions in open surface mass detonations at Hukkakero fell in municipality of Kittilä, Lapland, since 1988. The technique was learned from Swe

    Jan 1, 2015

  • SAIMM
    Estimation of coal density using a 3D imaging system: RhoVol

    By F. Nakhaei, M. Le Roux, Q. P. Campbell, S. Botlhoko

    The results of coal sink and float tests are plotted as washability curves. Analysis of these curves indicates the most effective method by which the coal can be cleaned. Sink and float experiments ar

    Aug 2, 2022

  • ISEE
    Estimation of Critical Distances to Avoid Failures in Detonators by Dynamic Pressure.

    By Lizbeth A. Escobar, Phol M. Llanos, Maritza Y. Avila

    The present research develops the estimation of critical parameters such as the distances and times between holes to avoid failure due to dynamic pressure in electronic detonators based on the near-fi

    Feb 1, 2020

  • SME
    Estimation of Fines Generation in Blasting Using Dynamic Rock Properties and a Near-Field PPV Damage Model "Mining, Metallurgy & Exploration (2020)"

    By Kwangmin Kim, Junnhyeok Park

    In the hard-rock mining industry, the generation of fines during blasting is an important issue because it has a significant effect on production processes. Although various approaches have been used

    May 16, 2020

  • SAIMM
    Estimation of Future Ground Vibration Levels in Malmberget Town Due to Mining-Induced Seismic Activity

    By T. Wettainen

    Malmberget town is located in northern Sweden, approximately 70 km north of the Arctic Circle. Parts of the town overlie more than 20 iron orebodies, consisting mainly of magnetite with smaller quanti

    Jan 1, 2014

  • SME-ICGCM
    Estimation of in-situ material strength

    By Danell. R. E.

    A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com

    Jan 1, 1989

  • SME
    Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit Definition

    By R. Benito

    This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace

    Jan 1, 2008

  • SAIMM
    Estimation of joint behaviour by monitoring and analysis in the rock cavern

    By T. Maejima, K. Aoki, T. Mori, K. Iwano

    Concerning the excavation of rock cavern, it is one of the most important issues to evaluate the behavior of rock joints. But few detailed measurements for joint behavior had been conducted. Therefor

    Jan 1, 2003

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SAIMM
    Estimation of Rock Strength From Quantitative Assessment of Rock Texture

    By C. A. Ozturk

    The compressive strength of rock (sc) has an important effect on design of structures in rock engineering. Compressive strength can be determined in the laboratory using the uniaxial compressive stren

    Jan 1, 2014

  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017

  • SME-ICGCM
    Estimation of the Intact Strength of Coal Using Indirect Methods

    By Mark Van Dyke, Gamal Rashed, Khaled Mohamed, Timothy Barton, Morgan Sears

    "The unconfined compressive strength (UCS) of coal is an important parameter that controls the stability of coal ribs in underground mines. Estimation of the UCS of coal units composing the rib is req

    Jan 1, 2018

  • DFI
    Estimation Of Wind Turbine Foundation Rotational Stiffness Based On Fully Non-Linear Dynamic Analysis

    By Yazn Khasawneh Ph. D. P. E., Will Tjaden, Spencer E. Ness P. E., Mohammed Nasim Ph. D. P. E.

    Wind turbine components undergo many loading cycles during their operational life. Additionally, wind turbines may undergo extreme loading conditions from natural hazards, mechanical failures, or emer

    Oct 1, 2022

  • IIMP
    Estructura de cerramiento para el abandono de labores subterráneas

    By Carlos Rivera

    En el proceso de clausura de labores explotadas en a mina subterránea se emplean estructuras de cerramiento, con la finalidad de que estos sectores alcancen la seguridad física, química y protección

    Sep 13, 2001