Search Documents

Sort by

  • SME
    High Speed Shotcrete Tunneling in Chalk for the Channel Tunnel Rail Link in the United Kingdom (North Downs Tunnel)

    By Christian Neumann, Josef Arnold, Albin Reinhart

    The Channel Tunnel Rail Link (CTRL) is the most significant railway infrastructure development project in the United Kingdom since the construction of the Channel Tunnel between France and England. Th

    Jan 1, 2001

  • TMS
    High Strength Aluminum Matrix Composites Reinforced by Newly Developed a-Alumina Single Crystal Particles

    By Hiroshi Tabuchi, Akihiko Takahashi

    "High strength aluminum matrix composites were prepared and studied using as reinforcement newly developed nearly mono-dispersed a-alumina single crystal particles each of which has a regular polyhedr

    Jan 1, 1998

  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada

    By S F. Simmons, J Fleming

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophyi

    Jan 1, 1995

  • TMS
    High Temperature Deformation and Ternary Alloying Of NbCr2 Laves Intermet Allics

    By M. Yoshida, S. Hanada, T. Takasugi

    "A study has been conducted to examine the effect of ternary alloying elements on high temperature deformation of the C15 NbCr2 based intermetallics in Nb-Cr-X (X=V, Mo and W) alloy systems, which hav

    Jan 1, 1996

  • IMPC
    High voltage breakage: A review of theory and applications

    By Johannes Käppeler, Alexander Weh, Harald Giese, Klaas van der Wielen

    "High voltage breakage is a novel comminution technology that shows considerable potential for various applications in mineral processing and recycling. It relies on highly energetic electrical pulses

    Jan 1, 2014

  • AUSIMM
    High-grade Porphyry Copper-gold Mineralisation in North-west Ecuador – The Alpala Cu-Au Porphyry Discovery

    By J Ward, B Rohrlach, B Rosero, J Silva, O Poma

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Alpala copper-gold deposit is a recent, high-grade porphyry Cu-Au discovery located in

    Mar 18, 2015

  • SAIMM
    High-order additions to platinum-based alloys for high-temperature applications

    By G. O. Rading, B. O. Odera, M. J. Papo, R. Couperthwaite

    "Platinum-based alloys are being developed with microstructures similar to nickel-based superalloys for potential high-temperature applications in aggressive environments. Since the chemistries of nic

    Jan 1, 2015

  • IOM3
    High-speed air-compressors for mining work, paper presented at a general meeting of the North Staffordshire Institute of Mining and Mechanical Engineers held in Stoke-on-Trent, 17 January 2016

    By Walshe J. M.

    The slow-speed compressor is giving place to the high-speed type, with its greater economy of material and space; and, where very large units are required, the turbo-compressor is supplying the need.

    Dec 1, 1916

  • DFI
    High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place Piles

    By Garland E. Likins

    High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec

    Jan 1, 1995

  • CIM
    High-Temperature Deformation Of Fe3Al

    By A. N. Shen

    Fe3A1 intermetallics are potential inexpensive candidate for hot applications. In this project, torsion tests on hot-rolled and annealed Fe3A1 (Fe-15.5A1-5.8Cr-1.0Nb¬0.05C) were carried out over the r

    Jan 1, 2007

  • IOM3
    High-temperature mine climate simulation model for predicting the effect of mine fire

    By P. Mousset-Jones, G. Danko

    Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t

    May 1, 1991

  • ISEE
    High-wall Control at Anglo Gold Ashanti, Navachab Mine

    By Charles Pretorius, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting

    Jan 1, 2006

  • SME
    Higher Air Pressure Drilling With Percussive Drills

    By Robert Charles Alfred

    Evolution is continuing in the field of rock drilling, Campbell Limestone Company is experimenting in the higher air pressure phase of drilling, It has been determined that there is a definite relatio

    Jan 1, 1963

  • CIM
    Highland Valley Copper: a strategy for increased productivity

    By Poul Hansen

    "In mid-I986, a world-class mining enterprise was created in British Columbia, bringing together the copper mining operations of Lornex Mining Corporation and Cominco into a new entity, Highland Valle

    Jan 1, 1987

  • AUSIMM
    Highlighting key features of the pore structure of iron ore sinter using mercury intrusion porosimetry and X-ray computed tomography

    By D O’Dea, B Godel, T Honeyands, G Evans, T Harvey

    The pores within iron ore sinter are important for producing a high quality material that is strong and easily reduced. The complementary methods of mercury intrusion porosimetry (MIP) and X-ray compu

    Jul 24, 2017

  • SME
    Highlights For Patenting Industrial Mineral Deposits

    By J. R. Evans

    In order to patent an industrial mineral placer mining claim, it must incorporate an economic deposit. Each ten acre parcel is evaluated for its mineral -in -character nature. Nonmineral -in -characte

    Jan 1, 1997

  • AIME
    Highlights of the Session on ?Ores, Metals, and the War?

    By AIME AIME

    UNDER the auspices of the Institute's Committee on Industrial Preparedness, a symposium was arranged for the Annual Meeting on the subject "Ores, Metals, and the War," with many well-known Govern

    Jan 1, 1942

  • SAIMM
    Highly Efficient Electric Smelters For The Platinum Industry - SMS Solutions For Energy Saving

    By R. Degel

    Submerged arc furnaces and electric smelters are applied in numerous metal and slag production lines. Particularly in ferroalloy and non-ferrous metal production, like silicon metal, platinum group me

    Jan 1, 2012

  • RMCMI
    Highwall and Spoils Design and Monitoring

    By Tim Peterson

    Factors Controlling Stability Stability of slopes in soft rock, waste dumps or soils is governed by three factors: ?Slope configuration ?Groundwater ?Shear strength

    Jan 1, 2004

  • IOM3
    Highwall mining: practical estimates of coal-seam strength and the design of slender pillars

    To maximise recovery by highwall mining, pillars must be designed which are long, slender and of relatively low width-to-height ratios. The strength of pillars with width/height less than 2 depends pr

    Jun 21, 1905