Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-100(2)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume II Of III - Methods Of Data AcquisitionVOLUME II Volume II, in conjunction with Volume I, is a general guide to the selection of cost-effective methods of site data acquisition in all geologic environmental, and socio-political circums
Jan 1, 1976
-
OFR-100(2)-83 Evaluation Of Proximity Warning Devices (Phase III, Volume 2)By J. H. Nixon
A three phase program evaluated commercial proximity warning devices, developed and designed a microprocessor-based electrostatic field measurement instrument, and utilized this instrument to investig
Jan 1, 1982
-
OFR-100(3)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Phase II ReportBy Peter Murphy
This report (arid related appendices) provides a description of the functional design specifications, engineering design specifications, and program of instruction for development of a training system
Jan 1, 1976
-
OFR-100(3)-82 Inventory Of Coal Waste Embankments, Surface And Underground OpeningsBy G. Ahnell
Throughout portions of four (4) heavily mined Appalachian states subdivided by the Mine Safety and Health Administration (MSHA) as: District 3 -Northern West Virginia and Maryland; District'" -So
Jan 1, 1982
-
OFR-100-75 Hazard Analysis Of Underground Coal Mine Haulage Systems ? 1. SummaryBy Herman O. Ankenbruck
Analyses of statistical data indicate that haulage accidents are one of the largest sources of injuries and fatalities in underground coal mines, and that the rate of accidents in transportation has b
Jan 1, 1975
-
OFR-100-78 Improved Visibility Systems For Large Haulage VehiclesBy Kent W. Hawley
An improved visibility system was developed for use on the large (100 ton+) haulage trucks typically operated in open pit and surface mines. The improved visibility system provides the truck driver&ap
Jan 1, 1978
-
OFR-100-80 Phase I - Portable Crusher For Underground Mining Applications And DesignBy Harold J. Miller
Loading and haulage of run-of-mine ore is frequently the highest cost in underground mining operations. These costs can be significantly reduced by use of belt conveyors, a common practice in coal and
Jan 1, 1978
-
OFR-101-78 Mine Grounding Systems - Evaluation Of In-Mine Grounding System And Codification Of Ground Bed Construction And Measurement Techniques.By Wils L. Cooley
Several aspects of mine safety grounding systems and equipment are studied. Electrolytic corrosion of test ground beds has shown a high incidence of stray current damage, while efforts to build a reli
Jan 1, 1977
-
OFR-102-81 An Assessment Of Thin Seam Mining System TechnologyBy J. Clark
The objective of this study has been to determine the state of the art in underground, thin-seam-mining systems, to identify new technology and procedures that would reduce the hazards of thin-seam mi
Jan 1, 1980
-
OFR-102-82 Development And Testing Of Self-Drilling Roof BoltsBy F. S. Kendorski
This report presents the results of a search for viable-self-drilling roof bolt concepts, detailed development, design, and manufacture of such bolts that drill their own holes, and testing in the lab
Jan 1, 1979
-
OFR-102-83 Computer Simulation Of Mining Subsidence Using The Zone Area Method - I. IntroductionBy M. Karmis
Surface subsidence is an inevitable consequence of many underground mining operations and has been recognized as such since the fifteenth century. Damage resulting from this phenomenon ranges from sim
Jan 1, 1983
-
OFR-102-84 A Feasibility Study For The Detection Of Weak Electromagnetic Signal/Bursts With Hard-Limited ArraysBy M. Kanefsky
Two channel polarity coincidence and polarity difference statistics are analyzed. The signal, common to both channels, consists of sinusoidal bursts where the exact frequency of the signal is nearly k
Jan 1, 1981
-
OFR-102-85 Satellite Monitoring For A Coal Waste EmbankmentBy F. J. Prokoski
The COALSTAR Project, which operated from November 1981 to December 1982, was a research and development project aimed at providing a reliable and inexpensive means of monitoring various waste site co
Jan 1, 1984
-
OFR-103(1)-75 Circuit Breaker Development And Application - USBM Contract Phase I Report - Section 1. Program Objectives And Results - 1. 1 BackgroundBy D. A. Paice
Direct current electrical systems are used in most coal mines primarily to power the main haulage trains and secondarily to feed other equipment and passageway lighting. Electrical power is supplied f
Jan 1, 2012
-
OFR-103(1)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume I: Technical ReportBy Michael L. Clar
The U.S. Bureau of Mines contracted a study to determine the feasibility of water diversion and overburden dewatering for underground coal mines in the Appalachian Region. All relevant published liter
Jan 1, 1981
-
OFR-103(2)-75 Circuit Breaker Development And Application - USBM Contract Phase II Report - Section 1. Program Objectives And Results - 1.1 SummaryBy D. A. Paice
Under the first phase of this contract as reported in the Phase I report it was determined that certain types of commercially available molded case breakers are capable of interrupting mine dc power s
Jan 1, 2012
-
OFR-103(2)-77 U. S. B. M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume I - Section II: Permeability TestingBy Adrian Brown
Pilot Hole ?X? was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. Five permeability tests were performed at
Jan 1, 1977
-
OFR-103(2)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume II: Annotated BibliographyBy Michael L. Clar
This volume is an annotated bibliography of published literature pertaining to the occurrence and control of surface and groundwater in underground coal mines. This literature was used to develop Volu
Jan 1, 1981
-
OFR-103-81 Development Of Tests And Criteria To Evaluate Grounding SystemsBy Wils L. Cooley
The report covers several aspects of mine safety ground systems, primarily for underground coal mines. The design of a combined ground fault-ground check monitoring system is presented. An analysis is
Jan 1, 1980
-
OFR-104(4)-80 Selective Placement Of Coal Strip Mine Overburden In Montana - IV. Hydrogeologic StudiesBy D. J. Dollhopf
This research was part of an effort to investigate means of reestablishing non¬polluted hydrological systems in areas where surface mining directly impacts shallow ground-water resources. Chemically
Jan 1, 1979