Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-17(1)-77 Conceptual Design Of An Automated Longwall Mining System Phase I - Survey Of Operating Longwalls ? 1. Introduction ? 1.1 Authorization For This Work And Its PurposeThis report is in partial fulfillment of Contract S0241051 awarded to COMINEC on June 27, 1974. 'Me purpose of the work under this contract is to develop a conceptual design for an automated long
Jan 1, 1975
-
OFR-17(2)-74 Develop, Assemble And Install A Permissible Surveillance And Communication System In The Bureau Of Mines Mining And Safety Research Center Coal Mine At Bruceton. Pennsylvania - Volume II - Circuits And Installation - 1. IntroductionThe mine surveillance and communication system hereafter described provides continuous local and remote monitoring of several parameters critical to normal mine operation at each of ten underground si
Jan 1, 1973
-
OFR-17(4)-77 Conceptual Design Of An Automated Longwall Mining System - Volume II ? Appendices - Appendix A - Selection Of The Concept Coal SeamsTwo coal seams were selected and the conceptual designs were based on the geological and physical conditions typical of these seams. As a result of the screening process presented below, the two coal
Jan 1, 1976
-
OFR-17-72 Measurement Of Temperature Profile Around Coal Mine OpeningsThis work presents: 1.) the results obtained from measurements of temperature profiles in pillars and at working faces of three coal mines located in Colorado and New Mexico, 2) a comparison of the ex
Jan 1, 1972
-
OFR-17-73 Assessment Of Electromagnetic Noise Measurements Taken By Bureau Of Mines Contractors ? I. IntroductionAs part of its research and development activities concerning coal mine operational/emergency communications sys terns, the Bureau of Mines commissioned several contractors to conduct electromagnetic
Jan 1, 1972
-
OFR-17-80 Development Of Cross Pit Overburden And Waste Material Handling System (Phase II)By Russell J. Gartrell
This report describes the engineering feasibility and economic advantages of using a steep angle conveyance (SAC) system in conjunction with medium and large draglines to transport spoil in a typical
Jan 1, 1977
-
OFR-17-81 Design And Development Of Protective Canopies For Underground Low Coal 48" And UnderBy Peter P. Kopas
Study, analysis, fabrication and testing for canopies on Roof Bolters and Shuttle Cars in coal seams under 48?.
Jan 1, 1980
-
OFR-17-87 Cost Estimation Handbook For Small Placer MinesBy Scott A. Stebbins
This Bureau of Mines publication presents a method for estimating capital and operating costs associated with the exploration, mining, and processing of placer deposits. To ensure representative cost
Jan 1, 1987
-
OFR-170(1)-83 Cost-Effectiveness Of Increasing Airflow At Any Location In Underground Coal Mines (Volume I)By Sandip K. Mukherjee
This report presents the results of the economic analysis of several applicable alternatives to increase airflow in four underground coal mines. Pressure-quantity surveys were conducted underground an
Jan 1, 1983
-
OFR-170(2)-83 Cost-Effectiveness Of Increasing Airflow At Any Location In Underground Coal Mines (Volume II - Appendices)By Sandip K. Mukherjee
This report presents the results of the economic analysis of several applicable alternatives to increase airflow in four underground coal mines. Pressure-quantity surveys were conducted underground an
Jan 1, 1983
-
OFR-171-83 Noise Reduction Of Chain Conveyors - Volume IIBy A. Galaitsis
This report summarizes part of the work performed under the USBM Contract No. H0155113, "Noise Abatement of Continuous Mining Machines." It reviews, briefly, the aboveground tests performed on a Jeffr
Jan 1, 1983
-
OFR-171-84 Minerals Availability Commodity Directory On NickelBy William L. Rice
This Bureau of Mines Open File Report on nickel is one of a series of minerals availability commodity deposit abstracts. Nonconfidential information from the Minerals Availability Program data base co
Jan 1, 1984
-
OFR-172-83 Theoretical Study, Design And Analysis Of An Improved Shuttle Car Cable ReelBy PW Meisel
An hydraulic-powered reel system to minimize peak tension transients in shuttle car trailing cables has been theoretically designed and analyzed using a computer. A single spring-loaded take-up sheave
Jan 1, 1983
-
OFR-173-82 Development Of Improved Topsoil Handling TechniquesBy Michael Mancuso
This report summarizes the problems of topsail handling as related to present requirements of law and current equipment availability. The most prevalent topsoiling systems are reviewed along with a li
Jan 1, 1981
-
OFR-173-83 Instruments And Techniques For Dynamic Particle Size Measurement Of Coal DustBy Virgil A. Marple
It was the purpose of this contract to conduct research in several different areas of instrumentation used to determine the quantity of respirable dust in the mining atmosphere. One area of research w
Jan 1, 1981
-
OFR-174-82 Impact Of Surface Mining On Soil Compaction In The Midwestern U.S.A.By Steve C. Albrecht
The objective of this study is "to assess the impact of surface mining on soil compaction in the Midwest". The study revolves around a unique field sampling program targeted at four mine sites utilizi
Jan 1, 1982
-
OFR-175-82 Alternative Power-Line Proximity Warning TechniquesBy Frederick H. Raab
A power-line proximity-warning (PLPW) system must have a high probability of detection (alarm activation at a specific distance), low probability of false alarm, and minimal set-up and maintenance. Te
Jan 1, 1982
-
OFR-175-83 Fire Hazard Criteria For Noise Control Products In Underground Coal MinesBy Mark R. Pettitt
The development of fire hazard criteria for noise control products in underground coal mines are presented. Qualifying requisites of the criteria include maintaining miners' safety, allowing for
Jan 1, 1983
-
OFR-177(1)-83 Electrical-Shock Prevention - Volume I -Protection Of Maintenance PersonnelBy L. A. Morely
The overall objective of the subject contract was to investigate the application, economic, and safety considerations of electrical-shock prevention techniques applied to surface and underground mines
Jan 1, 1982
-
OFR-177(2)-83 Electrical-Shock Prevention - Volume II - Ground-Fault Interrupting DevicesBy L. A. Morely
Volume II of the final report concerns the application of sensitive ground-fault interrupters (GFIs) to ac utilization circuits in U.S. mines The main concepts examined are shock prevention and method
Jan 1, 1982