Search Documents

Sort by

  • NIOSH
    OFR-34-88 Development And Testing Of A Variable Wall Miner Breadboard Prototype Unit

    By Ronald J. Mathis

    The objective of this contract is to design, build, surface test, and evaluate a breadboard prototype of the Variable Wall Mining System so that data are available for the design of a production machi

    Jan 1, 1987

  • NIOSH
    OFR-34-89 Thin Wall Explosion -Proof Enclosures ? Final Report ? Executive Summary

    The works recorded in this Test Report have been performed by Rade Roncar - Electrotechnical Institute of Zagreb, SFR Yugoslavia in collaboration with Bureau of Mines. The main objective of these i

    Jan 1, 1987

  • NIOSH
    OFR-34-90 Geochemical Sampling Results From Bureau Of Mines Investigations In The Valdez Creek Mining District, Alaska

    By Michael D. Balen

    The Bureau of Mines (Bureau), in cooperation with the Alaska Division of Geological and Geophysical Surveys (ADGGS), conducted field investigations from 1987 through 1989 in the 5.7 million-acre Valde

    Jan 1, 2011

  • NIOSH
    OFR-35(1)-73 Evaluation Of Mine Electrical Systems With Respect To Safety, Technology, Economics And Legal Considerations - Volume I ? Introduction

    By Robert Stefanko

    This report, rather than attempting to replace previous annual reports, supplements, and more importantly, coordinates and summarizes the entire effort. Even with such restrictions, the report is volu

    Jan 1, 1973

  • NIOSH
    OFR-35(2)-73 Evaluation Of Mine Electrical Systems With Respect To Safety, Technology, Economics And Legal Considerations - Volume II - Appendix I - Expected Power Parameters For Continuous Mining Sections

    By Robert Stefanko

    The following tables contain the average, maximum and minimum power parameter levels for several mining machines. Power factor is listed only for defined transducer output regions. The reasons for the

    Jan 1, 1973

  • NIOSH
    OFR-35-78 Development Of A Training System For Roof Bolt Equipment Operators

    By Bruce McDonald

    This report contains the findings of a study to perform a task and skill analysis of roof-bolting operations, with respect to the operational training requirements and to prepare detailed recommendati

    Jan 1, 1977

  • NIOSH
    OFR-35-79 Development Of New Bond Release Criteria For Surface Coal Mines In The Eastern And Interior Coal Provinces Of The United States

    By William M. Knuth

    This study involved a review of bonding and bond release practices in the states of the Eastern and Midwestern Coal Provinces. Data was collected from regulatory authorities and site visits to documen

    Jan 1, 1978

  • NIOSH
    OFR-35-81 Reclamation And Pollution Control: Planning Guide For Small Sand And Gravel Mines

    This field guide is designed for use in planning pollution control and reclamation activities on small sand and gravel operations. Its purpose is to assist operators in selecting environmentally desir

    Jan 1, 1981

  • NIOSH
    OFR-35-85 Productivity Of Parent Materials On Mined Prime Farmlands Using Alternative Sources Of Organic Materials Compared To Topsoil Replacement

    By J. H. Jones

    The original term of grant No. 1115174 was September 1980 through December 1983. An extended progress report, covering this time period, was forwarded to the Bureau of Hines in January 1984. The p

    Jan 1, 1985

  • NIOSH
    OFR-35-88 Prediction Of Incipient Electrical-Component Failures

    By Jeffery L. Kohler

    This final report on Bureau of Mines Contract J0338028 presents the results of a research effort to predict incipient failure in electric-power-system components. The development of continuous monitor

    Jan 1, 1987

  • NIOSH
    OFR-35-90 Permitting And Environmental Constraints - Their Impact On Mining In Alaska

    By Gary E. Sherman

    This report presents a Bureau of Mines study on the cost of mine permitting and compliance with environmental regulations in Alaska. It discusses permitting requirements and procedures for placer and

    Jan 1, 1991

  • NIOSH
    OFR-35-91 Evaluation Of The Tin-Tungsten - Greisen Mineralization And Associated Granite At Sleitat Mountain, Southwestern Alaska

    By Roger E. Burleigh

    In June, 1989, the U.S. Bureau of Mines, undertook a 9-day evaluation of the tin resource potential of the Sleitat Mountain tin deposit. Significant tin-tungsten mineralization is associated with quar

    Jan 1, 1991

  • NIOSH
    OFR-36-73 Safety Analysis System Study - Introduction

    [nder ' 1Oclific?atic>n 1 l', of Cant r Ict No. S012?U7 , the T1. S. l urc ,:i.11 of Miries ontracted tivit.l '1 -l:eudurn? Barry t1rirl ,~:>:'nci.11c:, for the 1>crfcocrnancu of a

    Jan 1, 1972

  • NIOSH
    OFR-36-74 Analysis Of Large Scale Non-Coal Underground Mining Methods - Section 1 ? Summary And Major Conclusions - 1.1 Background And General Information - 1.1.1 Purpose Of Underground Mines Study

    The request for proposal from the U.S. Bureau of Mines outlined the purpose of this study in the following terms. "High grade near surface deposits are largely a matter of history. Most of the cur

    Jan 1, 1974

  • NIOSH
    OFR-36-90 Analysis Of Balboa Bay, Beluga, Point Mackenzie, And Lost River As Port Sites For Use By The Mineral Industry

    By Gary E. Sherman

    To aid the U.S. Army Corps of Engineers in their Resource Development Navigation Study, the U.S. Bureau of Mines (Bureau) examined the potential for mineral development near ten Alaska port sites. Thi

    Jan 1, 2011

  • NIOSH
    OFR-36-91 Investigation Of Rare-Earth And Associated Elements, Zane Hills Pluton, Northwestern Alaska

    By James C. Barker

    Unverified reports of rare earth element (REE) concentrations in gold placers and radioactive mineral prospects in the Zane Hills were investigated by the U.S. Bureau of Mines as part of the Alaska cr

    Jan 1, 1991

  • NIOSH
    OFR-37-72 Development Of An Air Quality Simulator For Coal Mines - Foreword

    By G. E. Geiger

    The purpose of this research was to develop a computer simulator fur predicting the air quality in existing coal mines as well as a design aid for developing new mines. In addition to the air quantity

    Jan 1, 1972

  • NIOSH
    OFR-37-73 State Of The Art Of Down - The - Hole - Tools - History Of Down - The - Hole - Tools

    By Wendell L. Reich

    Percussion drilling dates back to the hand operated star drill and hammer. Eventually steam and compressed air were substituted for muscle power and the mechanical percussion drill was born. From the

    Jan 1, 1972

  • NIOSH
    OFR-37-75 Electromagnetic Noise In Grace Mine

    By J. W. Adams

    Two different techniques were wed to make measurements of the absolute value of electromagnetic noise in an operating hardrock mine, Grace Mine, located near Morgantown, Pennsylvania. Diesel-powered h

    Jan 1, 1974

  • NIOSH
    OFR-37-78 Development Of A Nonprimary-Explosive, Low-Voltage Electric Detonator For Use In Mining Operations

    By P. B. Ritter

    The feasibility of redesigning and adapting the all- secondary-explosive, low-voltage, electric safe detonator for use as a delay detonator has been demonstrated. Experimental results have shown that

    Jan 1, 1977