Search Documents

Sort by

  • SME
    Optimal Grade Control Using Geostatistics And Economics: Methodology And Examples (0cbcdec1-207d-4fc8-8d49-cd716d6fcdc7)

    An important problem in mine operations is the classification of material as waste, low-grade stockpile, and ore. This classification must often be made with blasthole data that are widely spaced and

    Jan 1, 1999

  • SME
    Optimal Sizing Of Conventionally-Sunk Ventilation Shafts Based Upon Capital And Operating Criteria (e05ee128-628b-45f8-8a69-2e8e36ccc831)

    By Y. J. Wang

    The selection of a shaft size for ventilation purposes is a classic problem of concern to mining engineers. This presentation is concerned with the sizing of conventionally-sunk circular shafts with c

    Jan 1, 1977

  • SME
    Optimal Strategies For Leach Pad Injection Operations

    By J. Winterton

    Cripple Creek and Victor Gold Mining Co. is developing a full-scale pad injection program as part of the overall operational plan for the Valley Leach Facility. As part of the development process the

    Feb 27, 2013

  • SAIMM
    Optimisation and Prediction of Co3+-Enhanced Dissolution in Sulfuric Acid

    By B. Mbuya, A. F. Mulaba-Bafubianda, J. M. Mvita

    The paper explains the main effects of input leaching parameters, such as addition of a reducing agent, acidity, agitation, temperature, and leaching system potential, in relation to observed and pred

    Jan 1, 2023

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Optimisation Improvements in Whittle using Stope Optimisation Software

    Mining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result

    Dec 6, 2010

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021

  • SME
    Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon Mine

    By I. Demers

    Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were

    Jan 1, 2008

  • TMS
    Optimisation of the Leach Conditions for a Copper/Uranium Ore

    By S. J. Macnaughton

    The Olympic Dam deposit in South Australia contains 2% copper and 0.06% uranium, which are present as bomite, chalcocite, chalcopyrite, uraninite, coffinite and brannerite. The copper is principally r

    Jan 1, 1999

  • SAIMM
    Optimising blend ratios, grinds, and reagent schemes to recover platinum group metals from lower group reef spiral tailings

    By J. Sehata, J. Tshilongo, I. Govender, S. Pikinini, T. L. Moodley, M. Raedani

    In the face of dwindling Merensky ore reserves in the early 1990s, Mintek developed the MF2 flotation circuit to economically recover platinum group metals from the shallow upper group-2 chromitite re

    Mar 6, 2026

  • AUSIMM
    Optimising carbon reactivation kiln operation

    By R Bezuidenhout, J K. Claflin, S R. La Brooy, G M. Wardell-Johnson, A M. Claflin

    Best practice gold (Au) recovery is not an accident. It is the result of proper operation of the adsorption circuit using good quality activated carbon. A conventional carbon ‘regeneration’ kiln canno

    Sep 11, 2017

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Optimising Geotechnical Logging to Accurately Represent the Geotechnical Environment

    Typically, large volumes of data are collected during geotechnical investigations for mining projects but rarely is this done in a comprehensive manner that enables all aspects of the geotechnical env

    Nov 25, 2010

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • AUSIMM
    Optimising multivariate variographic analysis with information from multivariate process data modelling (partial least squares regression)

    By L O. Filippov, Q Dehaine

    Variographic analysis, a classical tool from the Theory of Sampling (TOS), can address practical situations with multiple variables; however, its application has very often been limited to one variabl

    May 9, 2017

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018

  • CIM
    Optimising the Operation of Paste Thickening at the Yara Siilinjärvi Plant (8a3674cf-2785-43be-b17f-05be124f63bf)

    "Yara Siilinjärvi in Finland is the Western Europe's only apatite mine. Annually it produces one million tons of apatite concentrate, which creates 10 million tons of tailings. At the beginning of 201

    Jan 1, 2019

  • SAIMM
    Optimising the ramp design in an open pit mine APCOM 2021

    By I. Kaabachi, F. Meunier, N. Morales

    In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp

    Sep 1, 2021