Search Documents

Sort by

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • IIMP
    Optimización de ore control con metodología Six Sigma

    By Lytman Jordán

    En la actualidad, el proceso de Ore Control de Tintaya se convierte en un reto porque la naturaleza del yacimiento Metasomático de Contacto Tipo Skarn presenta una mineralización compleja a manera de

    Sep 9, 2007

  • IIMP
    Optimización del proceso gold mill Yanacocha Minera Yanacocha

    By Luis Vente

    El presente texto describe las mejoras implementadas en el proceso Gold Mill de Minera Yanacocha luego de 3 años de operación desde marzo 2008 hasta la fecha. El desarrollo de diferentes diseños en lo

    Sep 12, 2011

  • IIMP
    Optimización del Sistema de Control para los procesos de Extracción por Solventes y Depositación Electrolítica en Planta LESDE Toquepala

    By Adrián Del Carpio

    Desde 1995 la planta de Lixiviación de Toquepala desarrolló un sistema de control automático para los procesos de extracción por solventes y electrodepositación. Sin embargo, con el desarrollo de la t

    Sep 12, 2011

  • AUSIMM
    Optimization and Control of Laboratory Sulphidization of Oxidized Copper Ores with an Ion Selective Electrode

    By Woodcock J. T

    A sulphide ion selective electrode (ISE) is suitable for control of sodium sulphide additions in flotation because it has a rapid response to changeS in S2- concentrations, can indicate -low concentra

    Jan 1, 1978

  • ISEE
    Optimization and Precision in Mining, The Simfrag Model

    By Jorge Cárdenas, Alejandro Luna

    In mining simulation for fragmentation results prediction is of utmost importance to study feasibility, ensure safety, and estimate the correct use of resources in drilling an explosive to meet requir

    Jan 21, 2025

  • SME
    Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer Simulation

    By J. A. Delgadillo

    Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c

    Jan 1, 2008

  • ABM
    Optimization Of Building Ventilation For Gerdau Beaumont Meltshop Using Physical Fluid Dynamic Modeling

    By Jim Belous

    Fluid Dynamic Modeling (FDM) was used to develop solutions how to eliminate the fugitive emissions from the meltshop building and to comply with the EPA “6% opacity from the furnace operations” rule.

    Aug 17, 2017

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • SME
    Optimization of Cable Bolting Strategies at a Canadian Underground Mine

    By Efstratios Karampinos, John Hadjigeorgiou, Philippe Morissette

    "Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explore ground supp

    Jan 4, 2018

  • SME
    Optimization of Drying and Preheating Temperatures During Pellet Induration for Utilizing Goethitic Iron Ores

    By Rameshwar Sah, Basavaraja Maribasappanavar, Sangamesh Desai, G. Balachandran, Ravi Kant Sagar

    The present research work deals with the effective utilization of hematite ore containing goethite, kaolinite and gibbsite losson- ignition (LOI) phases in pellet making without deteriorating product

    Jun 4, 2022

  • SAIMM
    Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South Africa

    By Hornsey R., P. van der Merwe

    The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r

    Jan 1, 2003

  • SME
    Optimization Of Grade Control Sampling Based On Conditional Simulation

    Conditional simulation provides a model of the ore body that represents variability in the data. This can be used to determine the impact of various grade control and mining strategies. A number of tr

    Jan 1, 1999

  • SME
    Optimization of High‑grade Fluorspar Recovery from Rare Earth Element Carbonatite Deposit Using Column Flotation

    By Kristin K. Mueller, Lucie Coudert, Thi Yen Chau Nguyen, Lan Huong Tran, Jean‑François Blais, Guy Mercier

    Fluorite (calcium fluoride—CaF2), also known as fluorspar, is an industrial mineral used in metallurgy, hydrofluoric acid production, and ceramics manufacturing. Based on the results from a previous s

    Sep 9, 2022

  • SAIMM
    Optimization of mill performance by using online ball and pulp measurements - Synopsis

    By B. Clermont

    Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min

    Jan 1, 2010

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • SAIMM
    Optimization of shovel-truck system for surface mining - Synopsis

    By S. G. Ercelebi

    In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and dispatch the

    Jan 1, 2009

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015