Search Documents

Sort by

  • SAIMM
    Rate Control Mechanism In Solid State Decarburization Of Ferromanganese

    By P. J. Bhonde, R. D. Angal

    Conventionally low carbon ferromanganese is manufactured globally by refining high carbon ferromanganese in liquid state. This process is an expensive and lengthy technique. Hence, the present work wa

    Jan 1, 2004

  • SME
    Rate Limitations In Froth Flotation

    By W. C. Meyer

    A physical model of flotation, derived from viewing froth as a kinetic species since it constitutes the carrier of ore particles, not only agrees with and is simulated by engineering math models, but

    Jan 1, 1982

  • AIME
    Rate Of Precipitation Of Nickel Silicide And Cobalt Silicide In The Hardenable Copper-Nickel-Silicon And Copper-Cobalt-Silicon Alloys

    By Curtis Wilson

    FROM the results of his investigation of the hardenable copper-nickel-silicon and copper-cobalt-silicon alloys, M. G. Corson1 explained the dispersion-hardening effect by assuming the precipitation of

    Jan 1, 1933

  • IOM3
    Rate of reduction of iron oxide in carbon-bearing pellets

    By J. D. T. Capocchi, M. B. Mourao

    The rate of reaction between iron oxides and carbonaceous materials, agglomerated as pellets, was studied experimentally by measuring the weight loss as a function of time. The effects of temperature,

    Jun 18, 1905

  • SME-ICGCM
    Rating Coal Mine Roof Strength From Exploratory Drill Core

    Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo

    Jan 1, 1996

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • CIM
    Rationale for Quantum Leap Innovations in Mine Fill

    By J. H. Nantel

    Indications are that underground mining is gaining favour with large and small mining companies due to environmental and sustainability concerns. Dramatic changes to mine fill technologies will be nee

    May 1, 2007

  • AUSIMM
    Raub Gold-Genesis and Recovery

    The Raub Gold Mines are situated approximately in the centre of the Malayan Peninsula in the State of Penang. Part of the area, now known as "Raubhole," was opencut some 800 years ago by the

    Jan 1, 1945

  • SME
    Raw Materials and Technology Fuel U.S. Economic Growth

    By Thomas D. Kelly

    In 1900, the average U.S. citizen’s average life span was 47 years. He traveled about 1,900 km (1,200miles) in a lifetime and resided in a home with an ice-box for food storage and oil or gas for lig

    Jan 1, 2002

  • AIME
    Raw Materials for the Next War

    By William O. Hotchkiss

    IN COMMON with every other good citizen I long for conditions that will make perpetual peace a reality throughout the world. I have studied the statements of our public men relating to what we must do

    Jan 1, 1943

  • SME
    Raw Ore Selection By Artificial Vision (cc61426b-f93b-4b6c-89d5-720512c7133c)

    By P. Massacci, F. La Marca, G. Bonifazi

    Certain deposits of incoherent materials which are near the surface and exploitable by open-pit mining may be characterized in real time before they are mined through an analysis of ground-surface ima

    Jan 1, 1999

  • CIM
    Raw Water Supply: The Experience of Cerro Verde

    By Ken Wood

    "A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai

    Jan 1, 2008

  • AUSIMM
    Razorback Iron Ore Project – A New Iron District to Meet the Growing Demand of an Iron Hungry World

    By M Flis

    The Razorback Iron Ore Project is a high tonnage, low-grade magnetite deposit that defines a new iron ore district in South Australia. Known since the 1960s, the deposit has come into its own as the i

    Jul 11, 2011

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • AUSIMM
    Re-defining Compliance Planning through data integration and ultra-short-term scheduling

    By C Fong

    Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i

    Jun 22, 2022

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • AUSIMM
    Re-Forging and Heat Treatment of Jackbits

    By Larkin F, Farrer E, McGhie R. R

    The Electrolytic Zinc Company of Australasia Limited commenced productive operations during February, 1936, at the- Rosebery and Hercules mines, which are situated near Rosebery, Tasmania. At this tim

    Jan 1, 1939

  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • DFI
    Re-Use Of Old Pile Foundations In Amsterdam

    By Remco Offenberg, Marcel Bielefeld, Martijn van Delft

    The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct

    May 1, 2022

  • SME
    Reaction Kinetics Of Ferrous Regeneration For Alternate Anode Reaction Technology

    By E. A. Sarver

    The Fe(II) regeneration process is an important aspect of Alternate Anode Reaction Technology (AART) for copper electrowinning (EW). In AART, Fe(II) is oxidized to Fe(III) at the anode during EW, and

    Jan 1, 2007