Search Documents

Sort by

  • SME
    Segment Production 4.0—Automated Segment Production Using Robots

    By Stefan Mede

    Robot Supported Moulding—this is the name of Herrenknecht Formwork’s entry to the world of automated segment production. What had been considered impossible for a long time, has been achieved by Herre

    Jun 13, 2021

  • AIME
    Segregation In Steel

    By E. C. Smith

    THE CHAIRMAN.-Mr. Earle Smith- has kindly offered to make some remarks in connection with segregation in the product, Mr. Smith: E. C. SMITH,* Cleveland, Ohio-I will start this off by a story of the

    Jan 1, 1944

  • TMS
    Segregation Roasting of a Saprolitic Laterite Ore: An Experimental Investigation

    By Munyaradzi Kwatara, Ron Schonewille, Edgar Peek, Juzer Tayabally

    "The potential recovery of nickel from a South-American saprolitic laterite ore using the segregation roasting technique was investigated. The ore was heated to temperatures that ranged between 900 an

    Jan 1, 2011

  • IIMP
    Seguridad digital en el trabajo

    By José Galindez

    Tomando como premisa que los procesos, tareas, rutinas y demás actividades relacionadas con la actividad minera han quedado alteradas con la aparición del COVID -19, este artículo presenta y analiza a

    Jul 30, 2020

  • ISEE
    Seismic Analysis of Explosive Performance

    By Shazad Hosein, William Birch, Douglas A. Anderson

    This paper will present the results of tests of a new method for assessing explosive performance using wavelet transform analysis of standard blast seismograms. The theoretical background of the metho

    Jan 1, 2015

  • ISEE
    Seismic Blasting Between the North Poles

    By Lloyd Litwin

    The ARTA 2008 Project (Alpha Ridge Test of Appurtenance) was a Canadian Government sponsored deep water seismic survey carried out on the high arctic permanent polar ice cap. This Geological Survey of

    Jan 1, 2011

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • SME
    Seismic Design Evaluation of the Bay Tunnel

    By Yiming Sun

    The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the

    Jan 1, 2008

  • DFI
    Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas

    By David S. Graham, Benjamin Turner, Paul J. Axtell

    Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an

    Sep 8, 2021

  • SME
    Seismic Design Measures for the Retrofit of the Claremont Tunnel

    By Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer

    In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b

    Jan 1, 2005

  • SME
    Seismic Energy and Energy Released Due to Strata Failure During Longwall Caving Operations

    By Caroline Gerwig, Joseph R. Wickline, Zach Agioutantis

    In longwall mining, the progressive caving of the roof allows stored energy to dissipate over an extended time. However, in some cases, the roof strata above the longwall panel are unusually strong an

    Jul 1, 2023

  • SME
    Seismic Events In German Hard Coal Mining

    By Preusse. Axel

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SAIMM
    Seismic Hazard In Western Australian Mines

    A Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western

    Jan 1, 2004

  • DFI
    Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth

    By Arash Khosravifar, Matt Steffan

    An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is

    Jan 1, 2018

  • AUSIMM
    Seismic Interpretation Problems Caused by Miocene Channels in the Central Part of the Gippsland Basin

    By Cadman S. J

    ( The central part of the Gippsland Basin is surrounded by existing major Petroleum accumulations and although six exploration wells have been drilled in the area, none are significant petroleum dis

    Jan 1, 1992

  • SAIMM
    Seismic Monitoring Of A Simulated Rockburst On A Wall Of An Underground Tunnel

    By A. M. Milev

    A simulated rockburst was conducted underground at Kopanang Mine, previously called Vaal Reefs No. 9 Shaft. The rockburst was simulated by means of a large blast detonated in solid rock close to a cro

    Jan 1, 2001

  • SAIMM
    Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? Synopsis

    Caving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by

    Jan 1, 2008

  • DFI
    Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History

    By Aly M. Mohammad

    State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,

    Jan 1, 2006

  • CIM
    Seismic Risk Management at LaRonde Mine

    By Frederic M. Langevin

    ?? Introduction ?? LaRonde ?? History of Seismicity and Rockbursting ?? November 27th 2002 Rockburst ?? April 1st 2006 Rockburst ?? December 11th 2006 & January 11th 2007 Rockbursts ?? Seismic R

    Feb 1, 2008