Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunnel blast drill hole surveying – Benefits and MethodologiesBy G. Adderley, A. Wetherelt
The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-
Jan 1, 2009
-
Tunnel Boring at Stillwater’s East Boulder ProjectBy Clayr Alexander
Stillwater Mining Co. (SMC) is engaged in developing, extracting, processing and refining palladium, platinum and associated metals (PGM)from the J-M Reef. This geological formation is located in Sti
Jan 1, 1999
-
Tunnel Boring Machine DevelopmentBy Martin Herrenknecht
Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u
Jan 1, 2008
-
Tunnel education in the United StatesBy Gary Brieley
Until well into the 20th century, most construction work was performed under the auspices of a master builder or in a manner that would be described today as design-build. In addition, many civil eng
Jun 1, 2010
-
Tunnel Excavation on the Abutment of an Existing DamTo meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint
Jan 1, 2016
-
Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability ChallengesBy Shawna Munn, Jakub Hudler
This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines
Jan 1, 2018
-
Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye
In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con
Jun 13, 2021
-
Tunnel Instrumentation: Why And How?By Ernest Selig, John Dunnicliff, Delon Hampton
This paper provides a summary of a two-day conference held in New Orleans in March 1980, entitled "Tunnel Instrumentation: Benefits and Implementation." The conference addressed two major questions: F
Jan 1, 1981
-
Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical ApproachBy John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott
A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and
Jan 1, 2007
-
Tunnel Lining for Drill and Blast TunnelsBy Björn Johansson
"SUMMARY Every tunnel designer has to consider the power of water ingress when designing a new tunnel. Either you choose solutions with simple methods to divert the ingress water or a robust system wi
Jan 1, 2016
-
Tunnel Procurement Process ù Management Issues and Risk Mitigation ù æGetting it Right from the Beginning - Policy, Management, Procurement, Risk Evaluation and Decision Methodologies for Optimal ResultsÆBy T Isaksson, J Anderson
The procurement process for underground construction contracts, in particular those contacts involving tunnel boring machines (TBMs), is subject to many complex and inter-related variables, including
Jan 1, 1999
-
Tunnel Protection by Ground Improvement Prior to Track LoweringBy Ronald E. Triplett, George K. Burke, Bernard H. Voor
To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which
Jan 1, 2001
-
Tunnel Safety—Command and Fire Code Official PerspectiveBy Gary English
"Tunnel safety is evolving as science, engineering and technology make advances. Applicable safety codes and standards simply do not cover all the potentials of design, construction and operation. Thi
Jan 1, 2016
-
Tunneling And Trenchless Technology Key To Charleston?s InfrastructureBy Larry F. Drolet
Charleston, SC is anything but boring. The city was founded in 1670 and has played a significant role throughout the history of the United States. Located along the coast of the Atlantic Ocean in the
Jan 1, 2013
-
Tunneling at Hollywood ReservoirBy D. Olsen, S. Cole, J. Strid, G. Colzani
This paper focuses on the underground tunnel work at the Hollywood Water Quality Improvement Project (HWQIP) in Los Angeles, CA. The HWQIP is being constructed to provide a water distribution system t
Jan 1, 2001
-
Tunneling Data: Turning Information into Intelligence on the NEIS ProjectBy John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Tunneling for the Chaloem Ratchamongkhon Line in BangkokBy S. Suwansawat, D. J. Maconochie, C. C. Chang
This paper describes the overall delivery of the tunneling for the Mass Rapid Transit Authority of Thailand’s Chaloem Ratchamongkhon Line in Bangkok and the constraints provided by the alignment. Eigh
Jan 1, 2001
-
Tunneling In A Copper Mine - Portents Of Success From FailureBy Robert D. Talvensaari
It is indeed an honor for White Pine, as a member of the copper mining industry, to participate in this Rapid Excavation Conference. Although our presentation, as the title indicates, is not a success
Jan 1, 1974
-
Tunneling in the Cooper Marl of Charleston, South CarolinaBy Michael J. Robison, Wojciech F. Klecan, Robert L. Horner
Since 1928, nearly 64 km (40 mi) of tunnel have been excavated within the relatively soft Cooper Group, more commonly known as the “Cooper Marl,” for water supply and transporting wastewater in the Ch
Jan 1, 2001
-
Tunneling Through Cobbles in Sacramento, CaliforniaBy Joel Nonnweiler, Rafael Castro, Ross Webb
The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n
Jan 1, 2001