Search Documents

Sort by

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • CIM
    Simulating the Iron (III) Precipitation Rate during Medium Temperature Chalcopyrite Oxidation in Batch and Continuous Autoclaves

    By J. D. T. Steyl

    "This paper presents a phenomenological model of the rate of iron(III) precipitation in batch and continuous autoclaves at medium temperature operating conditions. The rate expressions are based on in

    Jan 1, 2012

  • AUSIMM
    Simulating Time versus Mass Basis?Sampling

    By J Ta’ala, M Handyside

    Mechanical sampling from conveyors has historically been a staple in the iron ore industry when information related to chemistry, sizing and moisture is required. In order to comply with ISO 3082:2009

    Jul 29, 2014

  • CIM
    Simulating Tumbling Mill Acoustic Signals Using DEM

    By Sudarshan Martins

    The measurement of acoustic signals produced by a tumbling mill has been previously used to determine the operating state of the mill and correlate the variations of the sound intensity with the opera

    Jan 1, 2012

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process

    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process The trends to the Tower Mill (TM) fo

    Sep 13, 2010

  • TMS
    Simulation and Animation of a Copper Smelter

    A simulation of a capper concentrate smelter was built with a capacity of 450,000 tons per year. The system's components to simulate were three : a Reverbetory furnace, a Wiente ' s modified

    Jan 1, 1994

  • SME
    Simulation And Economic Evaluation Of Coal Combustion Residue Transportation And Handling Systems

    By H. Sevim

    Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated technically and economically. The objective was to

    Jan 1, 1996

  • SME
    Simulation And Measurement Of Space And Time Varying Pollutant Concentrations From A Diesel Powered Vehicle In A Dead-Ended Drift

    By Harold J. Schock

    The cases of no auxiliary ventilation and ventilation with tubing were mathematically modeled, using a turbulent dispersion model. The scooptram that is used to load is modeled as a variable-speed, va

    Jan 1, 1981

  • SME
    Simulation and Modeling

    By A. J. Lynch, M. J. Lees

    Introduction The design of wet grinding circuits may vary considerably according to the duty which is to be performed. Grinding machines which are commonly used in these circuits are rod mills, bal

    Jan 1, 1985

  • CIM
    Simulation Applications in Construction Site Layout Planning

    By S. Razavialavi

    In the planning phase of every construction project, layout of temporary facilities is a crucial task; site layout can affect safety, travel cost and time, construction productivity, and space utiliza

    Aug 1, 2013

  • AUSIMM
    Simulation as a Tool for Mine Planning

    By J Greberg

    This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to

    Nov 22, 2011

  • CIM
    Simulation as a Tool to Enable World?s Best Mill Relining Practice

    By Peter Rubie

    For many years, optimising the relining of hard rock grinding mills has been complicated by: ?? the large number of variables; ?? the low frequency of relines (slow feedback loop); ?? the potent

    Jan 1, 2012

  • SME
    Simulation Exercises For Training And Educating Miners And Mining Engineers (532ca404-0c9a-4bf0-ba55-3ea258809161)

    By H. P. Cole

    A team of researchers at the University of Kentucky, working under a USBM contract, developed over 65 simulation exercises for teaching and testing problem-solving and decision-making skills to miners

    Jan 1, 1991

  • CIM
    Simulation for Ball Mill Sizing: The Path to a Successful Plant Start-Up

    By A. Rousselet, H. Gilbert-Tremblay, A. Berton

    "Robex Resources interrupted production at the Nampala Mine in September 2014 following throughput and gold recovery results which were below expectations during the first months of operation. After a

    Jan 1, 2018

  • AUSIMM
    Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading Operations

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical

    Jan 1, 2009

  • AUSIMM
    Simulation Modelling of Mining Systems

    This paper discusses the requirements for a successful simulation modelling study, and the steps involved in the modelling process. Advantages and disadvantages of simulation are described, and a case

    Jan 1, 2000

  • SME
    Simulation Of A Grinding Circuit And Encountered Problems

    A digital computer program has been developed to mathematically simulate the effect of limited changes in feed rate on the grinding circuit of an operating mill. The data on which the program is based

    Jan 1, 1971

  • AIME
    Simulation of A Grinding Circuit and Encountered Problems (332d3bdd-5d36-4886-b2da-08ba802ff11a)

    By R. F. Pilgrim

    A digital computer program to mathematically simulate the effect of limited changes in feed rate in the range of 80 to 95 tph on a plant-scale wet grinding circuit has been developed and tested. The c

    Jan 1, 1973

  • CIM
    Simulation of Brazilian Test Using PFC2D Grain-Based Model

    By Navid Bahrani

    The grain-based model (GBM) has resolved the difficulty of matching both the directtension (sc) and unconfined-compressive (st strengths of typical brittle rock by providing a synthetic material that

    Jun 1, 2012