Search Documents

Sort by

  • SME
    Autoclave Overpressure Control in Pressure Oxidation: Reducing Titanium Ingntion Risk in Autoclave Vent Systems

    By T. Krumins, L. Zunti, R. Frischmuth

    "Titanium and titanium alloys are commonly selected for pressure oxidation autoclave vent piping and pressure control valve components, as well as autoclave internals and other process piping. In the

    Jan 1, 2016

  • CIM
    Autogenous and semi-autogenous mill circuits

    By A. K. Ratte, C. M. Brown

    "IntroductionIn autogenous mills, grinding of the ore feed is accomplished by the direct action of the variously sized rocks making up the feed on each other and the mill interior. Size reduction is a

    Jan 1, 1989

  • SME
    Autogenous And Semi-Autogenous Mill Selection And Design ? Introduction

    By C. A. Rowland

    When studying the feasibility of using autogenous or semi-autogenous grinding, operating and engineering companies frequently request assistance from the mill manufacturers in three areas - 1. Reco

    Jan 1, 1974

  • SME
    Autogenous And Semiautogenous Grinding Practices (c6a88065-9a47-4bae-82d9-d1bdabcc3a71)

    By J. H. Bassarear

    Conventional crushing and grinding circuits are compared to semiautogenous circuits. Recent installations of each circuit are reviewed and seven methods of using autogenous or semi- autogenous techniq

    Jan 1, 1981

  • AIME
    Autogenous Blende Roasting

    By W. R. Ingalls

    MANY years ago, I expressed the opinion, in writings and otherwise, that it was possible to desulfurize zinc blende autogenously, i.e., without the use of extraneous fuel, and that at some time this w

    Jan 12, 1922

  • SME
    Autogenous Grinding - The Long And The Short Of It! ? Summary

    By Howard W. Adam

    Mill length was the primary variable investigated in an autogenous pilot mill circuit. The 5-1/2' diameter mill had both pebble ports and 1/2" wide slotted grates. The plus 1/2" mill product was

    Jan 1, 1973

  • AIME
    Autogenous Grinding From Test Work To Purchase Of A Commercial Unit

    By Robert R. Turner, Arthur R. MacPherson

    This chapter reviews the steps which should be taken from the time it is decided to consider autogenous grinding in the development of a new ore deposit or the expansion of an existing plant up until

    Jan 1, 1978

  • SME
    Autogenous Mills

    By Bond. F. C.

    Introduction Although autogenous grinding applications date back to the early years of mineral processing when tumbling-type mills were first used, there has been a renewed interest in this type of g

    Jan 1, 1985

  • SME
    Automated Conditions Mining at Sylvite

    By William G. Schultz

    Sylvite of Canada, a wholly owned subsidiary of Hudson Bay Mining and Smelting Co., operates an 8000 TPD potash mine and refinery located nine miles North East of Rocanville, Saskatchewan. Prior to Hu

    Jan 1, 1972

  • CIM
    Automated Continuous Mining at Sylvite

    By W. G. Schultz

    "Sylvite's potash mine, which produces 8,000 tons of ore per day, probably ranks as one of the most highly mechanized and automated mining operations in the world. Employing, on a normal 10-hour produ

    Jan 1, 1973

  • TMS
    Automated Detection of Unrecovered Minerals in Mill Wastes

    By G. Springer

    The identification of lost mineral values in mill tailings frequently requires the inspection of hundreds of thousands to millions of particles. The search of these particles can be made automatic by

    Jan 1, 1982

  • TMS
    Automated Gaspe Puncher

    By W. Dutton, D. Simms

    "The clearing of tuyeres on copper and nickel converters or similar metallurgical, vessels has, for many years, been done using mainly a manually- operated ""puncher"". One such device is the ""Gaspe

    Jan 1, 1989

  • AUSIMM
    Automated joint mapping using the concentric shells algorithm

    By P Valenzuela

    Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so

    Sep 20, 2017

  • CIM
    Automated Mine Scheduling: What is it and will it help me?

    By Fraser Rowe

    This paper discusses the philosophies, strategies, goals and pitfalls in automating a mine schedule. The intention of the paper is to give an open and honest view of who could benefit from moving to a

    Oct 1, 2009

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialists

    By J Franke, C Gonzalez

    One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met

    Nov 29, 2022

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • CIM
    Automatic (Mechanical) Coal Sampling

    By T E. Tibbetts

    This paper deals with coal sampling in general and with mechanical coal sampling in particular. The necessity of obtaining representative samples is emphasized. Other sections of the paper are devoted

    Jan 1, 1965

  • ISEE
    Automatic 3D Fragmentation Analysis from Drone Imagery

    By Andreas Gaich

    A new 3D fragmentation analysis method for muck piles is presented. It works with aerial imagery from UAVs (drones) and handles entire muck piles with minimum user intervention.

    Feb 1, 2020

  • CIM
    Automatic Anode Setting at Albras

    By L. S. Almeida, U. A. Courbassier, C. T. Guimãaraes, M. N. Souza, V. L. Silva, H. P. Dias, G. A. Bicalho, B. S. Rocha, P. N. Rodrigues, A. Carnevale

    During primary aluminum production the anode changing is a very important task. So improvements on it will be essential to avoid disturbance and have a better operational control. After anode changing

    Jan 1, 2006