Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field ObservationsBy B Belle
"Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard
Jun 1, 2012
-
A Case History Of A Site Re-Evaluation For A Lime Plant ExpansionBy L. A. Pursell
The case history, which is the subject of this paper, involves the expansion of a lime plant in Texas. The major new production unit is to be a 545.45 tonne per day coal fired rotary kiln. Auxiliary f
Jan 1, 1980
-
A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse EmbankmentBy Karen Dawson
This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab
-
A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE EmbankmentBy Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin
"This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a
Jan 1, 2017
-
A Case History Studying On Displacement Controlling In Deep ExcavationBy Feng Yongxuan
Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me
Jan 1, 1991
-
A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in GoaBy Akshay Sakhuja, M. S. Karthika, R. Vignesh
"The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup
Jan 1, 2015
-
A Case History: Convergence in a Shear Zone at Devil’s SlideBy Jeramy B. Decker, Paul H. Madsen
"During the excavation of the north bound tunnel of the Devil’s Slide Tunnel project, deformation (convergence) was measured after passing through Fault Zone B. The tunnel convergence was not symmetri
Jan 1, 2016
-
A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation PilesBy Chris Leach, Lucie Spencer
This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste
Nov 1, 2022
-
A Case Study Examination of Two Blast Rounds at a Nevada Gold MineBy Ed Mchugh
NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i
Jan 1, 2007
-
A Case Study Exploring Field Level Risk Assessments as a Leading Safety IndicatorBy R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas
"DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp
Jan 1, 2017
-
A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2017By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas
Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co
Jan 1, 2017
-
A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2018By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas
Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co
Jan 1, 2018
-
A Case Study in Applied Social Marketing: Developing an Occupational Safety and Health ProductBy Douglas F. Scott
This case study provides an example of how social marketing was applied to meet the needs of business customers. Federal regulations require that all companies develop a written program to track hazar
Jan 1, 2009
-
A case study in managing a high consequence geotechnical risk in a Queensland coalmineBy K Young, M Martin, D Payne
This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor
Nov 29, 2022
-
A Case Study in Optimising FragmentationBy R Crookes
Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar
Jan 1, 2000
-
A Case Study in Optimising FragmentationBy R Crookes
Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar
Jan 1, 1999
-
A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction MethodBy Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner
"In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari
Jan 1, 2015
-
A Case Study Of The San Miguel Lignite Mine ? IntroductionBy D. J. Rose
The San Miguel Mine is owned by San Miguel Electrical Cooperative, Inc. and operated by Atascosa Mining Company, a wholly-owned subsidiary of Morrison-Knudsen Company, Inc. This multiseam, single-zone
Jan 1, 1984
-
A Case Study Of The Strathcona Sound Project (A Non Recourse Project Financing)By H. W. Schreiber, G. R. Castle
INTRODUCTION The small mining company faces the dilemma of how to finance the development of its properties. Many of these small companies don't have the financial resources to pay for develop
Jan 1, 1985
-
A Case Study of Topography?Related Stress Rotation Effects on Multi?seam StabilityBy Ihsan Berk Tulu
The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi
Jan 1, 2014