Search Documents

Sort by

  • AUSIMM
    Case Studies Demonstrating Value from Geometallurgy Initiatives

    By A R. Bye

    The mining industry is facing some key challenges that provide a compelling case for geometallurgy initiatives. Over the last 30 years, the average grade of Australian orebodies being mined has halved

    Sep 5, 2011

  • SME
    Case Studies In Open Pit Design Using Lerchs-Grossman Pit Optimization

    By N. B. Prenn

    Case Studies in Open Pit Design Using Whittle 4D will be discussing the following four examples: 1) Optimization of process plant design using Whittle 4D as a sizing tool. In this case, the home o

    Jan 1, 1996

  • SAIMM
    Case Studies Of Simultaneous Mining And Mineral Processing Optimization Applied To Platinum And Nickel Operations

    By S. Burks

    This paper develops the themes explained at the previous SAIMM Platinum conference by Whittle and Burks1. Optimization techniques can be used to significantly increase the value of mining businesses b

    Jan 1, 2012

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By R M. Smart, A T. Harrison

    Backfill systems using unconventional cementitious binders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two unc

    Jan 1, 1998

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By Harrison AT, Smart RM

    Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two

    Jan 1, 1998

  • DFI
    Case Studies/case Histories In Geotechnical Engineerin: Enhancing The Practice In An Interactive Learning Environment

    By Waddah Akili

    This paper describes the steps taken in planning, developing, and executing a case study/ case history course in geotechnical/ foundation engineering at an international university. The paper sheds li

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • CIM
    Case Study - Ventilation Duct Criteria Pros and Cons How to Effectively Lower Operating Costs during the Tender Process

    By J. Holtzhausen

    "An analysis of operating costs for underground mining operations in the current global economic climate considers the financial burden for a ventilation system to be in vicinity of 30–50%. These oper

    Jan 1, 2019

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • SME
    Case Study of EPB-TBM Crossing through Boulder Cluster and Method Selected for Claim Resolution - RETC2021

    By Ehsan Nasiri, Keivan Pak Iman

    Historically, boulders are a frequent source of problem in soft ground tunneling. It is important to attempt to make an assessment of the nature and quantity of the boulders, although in many cases, i

    Jun 13, 2021

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • SME
    Case Study of Path Dependent Calibration and Pillar Stability Analysis Using the LaModel Program

    By Morgan M. Sears

    The LaModel program is widely used to calculate stresses and displacements on thin tabular deposits, particularly when multiple seams or complex mining geometry is encountered. The program itself allo

    Jun 25, 2024

  • SME
    Case Study Of The Conda Partnership's Dry Valley Phosphate Mining Project ? Introduction

    By Mark A. Krall

    The Conda Partnership's Dry Valley Phosphate mine is a thinly bedded, multiple seam, open pit mining operation where selective mining techniques are used to recover phosphatic shales. The mining

    Jan 1, 1984

  • SME
    Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021

    By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz

    Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met

    Jun 13, 2021

  • SAIMM
    Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation

    By G. R. Lane

    A large opencast gold mining company in Africa had just completed a feasibility study for the expansion of the operations. A traditional net present value project valuation methodology had been used t

    Jan 1, 2012

  • AUSIMM
    Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments

    By N Swiegelaar

    Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen

    Jan 1, 2003

  • AUSIMM
    Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct Vegetation

    By N Currey, G W. Wilson, P Ritchie

    Kidston Gold Mine in Queensland, Australia has a 310 ha tailings impoundment that has undergone final closure rehabilitation. Kidston Gold Mine evaluated their closure options for this low acid genera

    Jan 1, 2003

  • AUSIMM
    Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine

    By J Harris, J Turner, P Kirsch

    Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment

    Nov 5, 2014

  • CIM
    Case Study – Blind Shaft Sinking for BHP Jansen Project

    By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn

    "The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with

    Jan 1, 2019

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014